I

Intel

Pioneers microprocessors, CPUs for PCs

AI Hardware Engineer Intern

InternshipPosted on 10/23/2026Deadline 12/4/26
$48.36 - $48.37/hr+ Stock bonuses
PhD
Santa Clara, CA, USA+1 moreMore locations: Folsom, CA, USA
HybridHybrid work splits time between the assigned Intel site and off-site.
Hardware EngineeringHardware Systems Integration
Company Historically Provides H1B Sponsorship

About the job

Requirements
  • Currently pursuing a PhD in Computer Science, Computer Engineering, Electrical Engineering, AI/ML, Systems Engineering, or a related technical discipline.
  • Have a strong foundation in computer architecture, operating systems, distributed systems, parallel computing, AI/ML systems, high-performance computing, or systems software.
  • Be familiar with generative AI models and inference concepts, including transformers, attention, token generation, model serving, quantization, batching, KV cache, long-context workloads, and latency-throughput trade-offs.
  • Have experience programming in one or more of C, C++, Rust, CUDA, SYCL, OpenCL, or a comparable low-level or performance-oriented language.
  • Have a cumulative GPA of 3.0 or higher.
Responsibilities
  • Conduct technical research on next-generation AI infrastructure, including CPUs, GPUs, AI accelerators, ASICs, memory systems, networking, storage, rack-scale architecture, power delivery, cooling, and cluster management.
  • Analyze generative AI and agentic AI workloads to understand hardware implications, including transformer-based inference, mixture-of-experts architectures, multimodal models, real-time interactive inference, and distributed serving.
  • Evaluate hardware behavior of AI inference pipelines, including prompt processing and prefill, token generation and decode, memory capacity and bandwidth, KV-cache management, compute utilization, interconnect bandwidth, and latency; explore cluster architecture that optimizes prefill and decode through hardware, memory, and system co-design.
  • Identify product and system gaps that may limit Intel's ability to serve AI customers, including hardware capabilities, developer tooling, performance libraries, reference architectures, deployment models, observability, and ecosystem enablement.
  • Support silicon hardware programs through multiple phases of the silicon lifecycle, executing chips end-to-end from concept to silicon.
  • Contribute to driving silicon design for subsystems or top-level functions with ASICs and SoCs from architecture specification to production silicon, including memory subsystems and interconnects; consider scale-up, scale-out, scale-across, power management, rack-scale liquid cooling, system-level observability and telemetry, and their effects on generative AI and large language model performance, total cost of ownership, and execution key performance indicators.
  • Develop technical recommendations for what Intel should build, optimize, enable, or partner on to meet AI customer requirements, based on customer use cases, workload performance, and machine-learning systems research.
  • Benchmark and compare AI hardware and infrastructure approaches across performance, power efficiency, cost, programmability, memory hierarchy, scalability, ecosystem maturity, and workload fit.
  • Develop technical models, simulations, prototypes, or analysis tools to evaluate hardware/software trade-offs for AI workloads.
  • Investigate bottlenecks across compute, memory, networking, storage, and software orchestration, and propose methods to improve end-to-end AI workload performance.
  • Work with Intel technical teams and external independent software vendors to collect data on model requirements, inference bottlenecks, deployment challenges, hardware optimization opportunities, and customer priorities.
  • Engage with AI software ecosystem partners, including model providers, inference-engine developers, cloud providers, framework teams, and independent software vendors, to understand how their stacks interact with hardware.
  • Present findings through architecture diagrams, benchmark analyses, technical reports, design recommendations, and executive-ready presentations.
Desired Qualifications
  • Have coursework, research, or project experience in computer architecture, VLSI, digital design, ASIC/FPGA systems, compilers, kernel development, GPU programming, distributed systems, high-performance computing, or AI systems.
  • Have experience using profiling, tracing, or benchmarking tools to evaluate CPU, GPU, accelerator, network, memory, storage, or software performance.
  • Be familiar with AI hardware platforms such as Intel Xeon processors, Intel GPUs, NVIDIA GPUs, AMD GPUs, TPUs, custom AI accelerators, FPGAs, or domain-specific inference ASICs.
  • Understand memory hierarchies and performance concepts, including cache behavior, DRAM, HBM, memory bandwidth, memory capacity, latency, data locality, DMA, and data movement.
  • Have experience with inference frameworks or runtimes such as vLLM, SGLang, Hugging Face Transformers, PyTorch, Triton, or Ray.
  • Be familiar with AI systems infrastructure such as Linux, containers, Kubernetes, distributed storage, RDMA over Ethernet, InfiniBand, CXL, PCIe, NVMe, UALink/eSUN-based interconnects, silicon photonics, and cluster-management software.
  • Have some experience with simulation, modeling, emulation, RTL, FPGA prototyping, firmware, driver development, or low-level debugging.
  • Have some experience contributing to open-source systems, machine-learning infrastructure, compiler, kernel, framework, or performance-engineering projects.

About the company

Intel designs and manufactures semiconductor chips, with a focus on microprocessors for personal computers, servers, and other devices. Its core product is the CPU on a single silicon chip, which executes instructions, handles arithmetic and logic operations, and coordinates the work of other computer components. Intel originated in memory chips but shifted decisively to microprocessors in the 1980s, becoming a central supplier for the PC era after the IBM partnership and its famous x86 processor line. This shift, large-scale manufacturing, and close ties with computer makers set Intel apart from competitors who remained focused on memory or other components. The company aims to power computing by delivering high-performance, energy-efficient silicon solutions that drive a wide range of computing devices and applications.

Company Size

10,001+

Company Stage

IPO

Headquarters

Santa Clara, California

Founded

1999

Get referred to Intel

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • July 23, 2026 Q2 revenue hit $16.1 billion, up 25% year over year.
  • Intel raised 2026 capex above $20 billion after stronger customer demand signals.
  • September 29, 2026 OpenShell expanded Intel's enterprise AI toolkit with policy enforcement.

What critics are saying

  • Intel's 10% government stake faces shareholder litigation in Delaware and Supreme Court filings.
  • Intel Foundry still depends on a few customers; external revenue remains only 5%.
  • AMD's 2026 data-center momentum and TSMC process lead pressure Intel's turnaround and margins.

What makes Intel unique

  • Intel's x86 installed base still anchors PC and server software compatibility in 2026.
  • Intel's 2026 Open Edge Platform bundles industrial AI software around Intel silicon.
  • Intel 18A tooling supports integrated design, manufacturing, and foundry control unmatched by fabless rivals.

Help us improve and share your feedback! Did you find this helpful?

Benefits

  • We Invest in Your Life and Career: Intel offers a complete and competitive package of benefits1 that demonstrates how much we care for employees and their families through every stage of life.
  • Great Minds Deserve Great Rewards: We offer a total compensation package that ranks among the best in the industry. It consists of competitive pay, stock, bonuses, and benefit programs.
  • Intel Fuels Career Acceleration: Curiosity drives us to change the world. We provide employees opportunities to expand their knowledge, leadership abilities, and skill set.
  • Vacation, Holidays, and More: We offer opportunities for employees to refresh and recharge—from paid vacation time and holidays to flexible time off programs.
  • Health Benefits for the Whole You: We provide multiple benefits and resources to help employees take care of themselves and their families.

Growth & Insights and Company News

6 month growth

-1%

1 year growth

0%

2 year growth

-2%
Yahoo Finance
Oct 23rd, 2026
Intel shares swung an average 16% after its last three reports; will Q3 results move them again?

Intel will report third-quarter results after the close on October 29. The stock has moved an average of 16% the day after its last three reports: down 17% in January, up 24% in April, and down 8% in July. Intel beat its own forecast each time, yet shares fell twice. In both cases the outlook pointed lower or flatter. July's second-quarter revenue of $16.1 billion was up 25% year on year, but the third-quarter forecast midpoint of $16.3 billion was only about 1% higher. Shares trade near $93, so a similar move would mean about $15 either way. The fourth-quarter outlook may matter most, as chief financial officer David Zinsner said supply growth would skew toward the end of the third quarter and into the fourth. At about 44 times expected 2027 earnings, shares already count on growth returning.

Yahoo Finance
Oct 22nd, 2026
Intel falls 24.9% in a month despite 59% data centre growth to $6.3B

Intel shares fell 24.9% in the month to October 21, 2026, while the S&P 500 was about flat. The stock still gained 144% over the past year, and trades at 8.3 times trailing sales against 3.1 times for the index. Data center revenue reached $6.3 billion in fiscal Q2 2026, up 59% year on year. Operating margin was 12.2%, compared with an operating loss of 10.0% a year earlier. Intel Foundry lost $2.1 billion at the operating level in the quarter, on $293 million of outside revenue. Intel raised its 2026 capital spending outlook to more than $20 billion. On August 11, it upsized a stock offering to $20 billion, selling 210.5 million shares at $95 each. The stock closed at $92.96 on October 21. Fiscal Q3 results are expected in October 2026, against a revenue guide of $15.8 billion to $16.8 billion.

The Financial District
Oct 22nd, 2026
Intel reportedly lands Tesla for 14A chip process as $20B share offering funds foundry push

Intel has reportedly signed Tesla as a customer for its upcoming 14A manufacturing process, according to a Simply Wall St. report. If confirmed, it would be a significant external win for Intel's foundry business. Intel also reported progress in production output from its 18A process. In August, it priced a public offering of common stock that was increased to $20 billion, with proceeds intended for general corporate purposes, including potential capital expenditures and working capital. The offering adds capital but increases the number of shares outstanding, which could dilute existing shareholders. The key question is whether heavy spending on 18A, 14A and advanced packaging will bring sustained customer demand.

Yahoo Finance
Oct 21st, 2026
Intel installs first major truss at $28B Ohio fab, now due in 2030; Arizona fab targets 2028

Intel said Wednesday it has installed the first major structural truss at its Ohio chip factory, a construction milestone for a project years behind schedule. The Ohio project, with planned investments above $28 billion, was first expected to produce chips in late 2025. Intel now expects to finish the first Ohio factory in 2030, with operations starting between 2030 and 2031. The second factory should be complete in 2031, with operations starting in 2032. The company has slowed construction to match spending with customer demand. At its Fab 62 site in Arizona, construction and equipment installation are underway, with operations due by the end of 2028. Intel Foundry posted second-quarter revenue of $5.8 billion, up 31%, and an operating loss of about $2.1 billion. Most of that revenue came from within Intel.

Startup Fortune
Oct 20th, 2026
Two Intel workers die in gas explosion at Kiryat Gat fab in Israel.

Two Intel workers die in gas explosion at Kiryat Gat fab in Israel. Ilya Chechulin, 49, and Yakir Kosashvili, 35, died after an NF3 tank failed during unloading at Intel's Fab 28; a third worker remains on a ventilator as the company stays silent on output. A suspected tank failure during unloading at one of Intel's most important chip plants killed two workers days before the company has to explain its production numbers to Wall Street. Intel's Kiryat Gat facility in southern Israel was the backdrop for a visit by Prime Minister Benjamin Netanyahu on October 14 when an explosion tore through the site's gas delivery area. Police said a gas cylinder appeared to have malfunctioned during unloading, and Israel's Fire and Rescue Services later confirmed the incident involved nitrogen trifluoride, or NF3, a toxic but non-flammable compound used in semiconductor manufacturing. Two workers are dead. A third remains in critical condition. According to the Times of Israel, the first victim, Ilya Chechulin, 49, died of his wounds a day after the blast. Ynet identified the second man who died as Yakir Kosashvili, 35. Both suffered severe burns in the explosion and fire that followed. A third worker, a man in his 20s, remains sedated and on a ventilator in intensive care, according to Ynet's reporting. Calcalistech reported that preliminary findings point to a technical failure in the neck of a tank holding roughly 8 tons of NF3 at the time of the incident. Police said there was no indication the blast was an attack and that investigators suspected a technical malfunction during the transfer of material into the factory's tanks. The explosion happened on a day the country's prime minister was touring the city. Kiryat Gat isn't a minor node in Intel's network. Fab 28 there makes processors along with 5G and AI-related components, and it's one of the sites Intel has pointed to as it tries to rebuild manufacturing credibility after years of delays and cost overruns. Intel has also been expanding a second plant on the same campus, Fab 38, though construction was paused in 2024. A facility already carrying extra weight in Intel's turnaround story just became the site of a fatal industrial accident. Commerce Secretary Howard Lutnick has asked a Delaware court to dismiss a lawsuit alleging the US government's 9.9% stake in Intel amounted to an illegal seizure. He's defending the deal as vital to national security, and hinting defense contractors could be next. - how to dismiss lawsuit over government Intel stake - Commerce Secretary Lutnick fights Delaware corruption charges Intel Here's the uncomfortable part for investors: Intel hasn't said whether Kiryat Gat's output was affected, or for how long. On October 19, the company said its monitoring systems detected another NF3 leak during preparations to remove gas tanks from the site; no injuries were reported, but Intel still provided no production-impact figures. Gotrade reported that Intel shares fell 2.8% to $95.37 on October 15, one day after the explosion, amid concern about the blast and a broader chip selloff. The stock fell another 5.8% to $89.85 on October 16 before closing at $92.03 on October 19. Intel reports third-quarter results on October 29, according to the company's own investor relations announcement, with a call scheduled for 2 p.m. Pacific that day. That's fifteen days after the explosion and still no public word on whether wafer output, yield, or shipment timelines out of Kiryat Gat took a hit. Executives will have to address it on the call whether they want to or not, and investors will be listening for a number, not a sentiment. A single accident, a jittery sector. The timing is rough beyond Intel's own balance sheet. Chip stocks have been skittish for weeks on memory shortages and swings in AI infrastructure spending, and a fatal accident at a facility that makes both consumer processors and AI-adjacent components lands right in that nervousness. Everyone talks about the AI hardware buildout in abstractions, capacity, yield, roadmap. But it still runs through physical buildings where tanks of toxic gas are unloaded, and where a suspected tank failure can kill two people and rattle investors. Frankly, the most telling fact right now isn't the stock move. It's that a company sophisticated enough to run earnings calls down to the minute hasn't managed one sentence on whether its chips are still coming out of Kiryat Gat on schedule. Grief and operational disclosure aren't the same thing, and Intel owes its workforce one and its shareholders the other. On October 29, it runs out of room to give neither. Join the discussion. No replies yet. Start the discussion. Julian Lim is an entrepreneur, technology writer, and a researcher. He started JL Data Analysis after graduating from NUS in Intelligent Systems. Julian writes about technology innovations and entrepreneurship on Business Times, Asia Pacific Magazine and occasionally contributes to Startup Fortune.