I

Intel

Pioneers microprocessors, CPUs for PCs

Install Qualification Operations Specialist

Full-TimeUpdated on 10/22/2026
$52k - $200k/yr+ Stock bonuses
Junior, Mid, Senior
Bachelor's, Associate's
Hillsboro, OR, USA
In PersonOnsite five days per week in Hillsboro, Oregon.
Project & Program ManagementProject Management
No H1B Sponsorship

About the job

Requirements
  • A bachelor's degree in engineering, architecture, construction management, business, or a related field, plus at least one year of experience in project management, as an equipment or engineering tool owner, or equivalent installation, qualification, demo, or maintenance technician experience; alternatively, an associate's degree related to semiconductor manufacturing plus at least three years of such experience; or at least five years of such experience in lieu of a degree.
  • Experience supporting planar tool installation or demo is preferred.
  • Willingness to work onsite in a cleanroom or construction environment and navigate construction areas as needed.
  • PMP certification is preferred.
  • Experience with medium- or large-scale construction or tool install programs is preferred.
  • Knowledge of Intel systems including EMS, SIRFIS, Fuzion, QUEST, IMCS, Capacity Planning, SLS, and 6D is preferred.
  • Demo experience, including 6D training and certification, is preferred.
  • Experience with station controller setup or automation is preferred.
  • Experience with panel shutdowns, FPOCs, and eFITs is preferred.
  • Experience with tool crating and de-crating, and AIO, is preferred.
  • Knowledge of tool install and qualification specifications and maintenance is preferred.
  • Experience managing daily third-party supplier operations is preferred.
  • Project management skills, including planning, scheduling, and risk mitigation.
  • Adaptability in fast-paced, changing environments.
  • Organizational discipline and time management.
Responsibilities
  • Drive key milestones enabling tool installation, readiness, and qualification within Intel Foundry Construction and Sourcing.
  • Execute equipment installation from pre-design through design finish and set to SL2 signoff, ensuring safe delivery, accurate scope definition, efficient construction, and prompt vendor qualification.
  • Champion Intel's Culture of Caring and ensure safe behaviors across design and construction activities.
  • Enforce cleanroom, intellectual property protection, and site protocols to maintain compliance with applicable regulations and agency audits.
  • Own key tool installation milestones, including set, rigging, placement, hook up, energization, and qualification.
  • Support troubleshooting for Supplier Qualification and Intel Qualification to resolve issues promptly.
  • Drive micro-schedule and pull-plan development to support tool installation milestones.
  • Manage decoupled construction paths from SET to SL2 to accelerate readiness.
  • Coordinate testing and facility readiness, including LSS, eFIT, TAB, networking, and ESOPN.
  • Load complete tool installation scope in DAC before design engagement.
  • Participate in cross-functional design reviews with CIT, TICE, Layout, original equipment manufacturers, and module teams.
  • Validate original equipment manufacturer data and ensure alignment with Intel standards, including SEED, EDS, and UDS.
  • Support LSP creation, routing validation, point-of-contact assignments, and space management.
  • Reduce changes by minimizing design change notices, design change requests, and late-stage modifications.
  • Lead multi-supplier coordination meetings and execution planning sessions.
  • Translate technical and business requirements into actionable plans and schedules.
  • Forecast equipment and resource needs.
  • Ensure readiness and prompt delivery of tools, prefabrication kits, globals, and parts.
  • Coordinate equipment decontamination and demo activities.
  • Manage original equipment manufacturers and third-party vendors to achieve qualification durations.
  • Drive early vendor enablement and facility readiness using ESOPN.
  • Ensure a clean handoff from construction completion to vendor qualification finish.
  • Manage contracts, key performance indicators, and supplier scorecards in partnership with Procurement.
  • Oversee contractor and supplier activities in accordance with service-level agreements.
  • Monitor the site operational budget and maximize efficiency.
  • Apply Lean principles to eliminate waste, reduce installation durations, and improve quality.
  • Document and share lessons learned across modules and sites.
  • Influence tool installation methods through innovation and best-known methods.
Desired Qualifications
  • Experience supporting planar tool installation or demo.
  • PMP certification.
  • Experience with medium- or large-scale construction or tool install programs.
  • Knowledge of Intel systems including EMS, SIRFIS, Fuzion, QUEST, IMCS, Capacity Planning, SLS, and 6D.
  • Demo experience, including 6D training and certification.
  • Experience with station controller setup or automation.
  • Experience with panel shutdowns, FPOCs, and eFITs.
  • Experience with tool crating and de-crating, and AIO.
  • Knowledge of tool install and qualification specifications and maintenance.
  • Experience managing daily third-party supplier operations.

About the company

Intel designs and manufactures semiconductor chips, with a focus on microprocessors for personal computers, servers, and other devices. Its core product is the CPU on a single silicon chip, which executes instructions, handles arithmetic and logic operations, and coordinates the work of other computer components. Intel originated in memory chips but shifted decisively to microprocessors in the 1980s, becoming a central supplier for the PC era after the IBM partnership and its famous x86 processor line. This shift, large-scale manufacturing, and close ties with computer makers set Intel apart from competitors who remained focused on memory or other components. The company aims to power computing by delivering high-performance, energy-efficient silicon solutions that drive a wide range of computing devices and applications.

Company Size

10,001+

Company Stage

IPO

Headquarters

Santa Clara, California

Founded

1999

Get referred to Intel

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • July 23, 2026 Q2 revenue hit $16.1 billion, up 25% year over year.
  • Intel raised 2026 capex above $20 billion after stronger customer demand signals.
  • September 29, 2026 OpenShell expanded Intel's enterprise AI toolkit with policy enforcement.

What critics are saying

  • Intel's 10% government stake faces shareholder litigation in Delaware and Supreme Court filings.
  • Intel Foundry still depends on a few customers; external revenue remains only 5%.
  • AMD's 2026 data-center momentum and TSMC process lead pressure Intel's turnaround and margins.

What makes Intel unique

  • Intel's x86 installed base still anchors PC and server software compatibility in 2026.
  • Intel's 2026 Open Edge Platform bundles industrial AI software around Intel silicon.
  • Intel 18A tooling supports integrated design, manufacturing, and foundry control unmatched by fabless rivals.

Help us improve and share your feedback! Did you find this helpful?

Benefits

  • We Invest in Your Life and Career: Intel offers a complete and competitive package of benefits1 that demonstrates how much we care for employees and their families through every stage of life.
  • Great Minds Deserve Great Rewards: We offer a total compensation package that ranks among the best in the industry. It consists of competitive pay, stock, bonuses, and benefit programs.
  • Intel Fuels Career Acceleration: Curiosity drives us to change the world. We provide employees opportunities to expand their knowledge, leadership abilities, and skill set.
  • Vacation, Holidays, and More: We offer opportunities for employees to refresh and recharge—from paid vacation time and holidays to flexible time off programs.
  • Health Benefits for the Whole You: We provide multiple benefits and resources to help employees take care of themselves and their families.

Growth & Insights and Company News

Headcount

6 month growth

-1%

1 year growth

0%

2 year growth

-2%
Yahoo Finance
Oct 22nd, 2026
Intel falls 24.9% in a month despite 59% data centre growth to $6.3B

Intel shares fell 24.9% in the month to October 21, 2026, while the S&P 500 was about flat. The stock still gained 144% over the past year, and trades at 8.3 times trailing sales against 3.1 times for the index. Data center revenue reached $6.3 billion in fiscal Q2 2026, up 59% year on year. Operating margin was 12.2%, compared with an operating loss of 10.0% a year earlier. Intel Foundry lost $2.1 billion at the operating level in the quarter, on $293 million of outside revenue. Intel raised its 2026 capital spending outlook to more than $20 billion. On August 11, it upsized a stock offering to $20 billion, selling 210.5 million shares at $95 each. The stock closed at $92.96 on October 21. Fiscal Q3 results are expected in October 2026, against a revenue guide of $15.8 billion to $16.8 billion.

The Financial District
Oct 22nd, 2026
Intel reportedly lands Tesla for 14A chip process as $20B share offering funds foundry push

Intel has reportedly signed Tesla as a customer for its upcoming 14A manufacturing process, according to a Simply Wall St. report. If confirmed, it would be a significant external win for Intel's foundry business. Intel also reported progress in production output from its 18A process. In August, it priced a public offering of common stock that was increased to $20 billion, with proceeds intended for general corporate purposes, including potential capital expenditures and working capital. The offering adds capital but increases the number of shares outstanding, which could dilute existing shareholders. The key question is whether heavy spending on 18A, 14A and advanced packaging will bring sustained customer demand.

Yahoo Finance
Oct 21st, 2026
Intel installs first major truss at $28B Ohio fab, now due in 2030; Arizona fab targets 2028

Intel said Wednesday it has installed the first major structural truss at its Ohio chip factory, a construction milestone for a project years behind schedule. The Ohio project, with planned investments above $28 billion, was first expected to produce chips in late 2025. Intel now expects to finish the first Ohio factory in 2030, with operations starting between 2030 and 2031. The second factory should be complete in 2031, with operations starting in 2032. The company has slowed construction to match spending with customer demand. At its Fab 62 site in Arizona, construction and equipment installation are underway, with operations due by the end of 2028. Intel Foundry posted second-quarter revenue of $5.8 billion, up 31%, and an operating loss of about $2.1 billion. Most of that revenue came from within Intel.

Startup Fortune
Oct 20th, 2026
Two Intel workers die in gas explosion at Kiryat Gat fab in Israel.

Two Intel workers die in gas explosion at Kiryat Gat fab in Israel. Ilya Chechulin, 49, and Yakir Kosashvili, 35, died after an NF3 tank failed during unloading at Intel's Fab 28; a third worker remains on a ventilator as the company stays silent on output. A suspected tank failure during unloading at one of Intel's most important chip plants killed two workers days before the company has to explain its production numbers to Wall Street. Intel's Kiryat Gat facility in southern Israel was the backdrop for a visit by Prime Minister Benjamin Netanyahu on October 14 when an explosion tore through the site's gas delivery area. Police said a gas cylinder appeared to have malfunctioned during unloading, and Israel's Fire and Rescue Services later confirmed the incident involved nitrogen trifluoride, or NF3, a toxic but non-flammable compound used in semiconductor manufacturing. Two workers are dead. A third remains in critical condition. According to the Times of Israel, the first victim, Ilya Chechulin, 49, died of his wounds a day after the blast. Ynet identified the second man who died as Yakir Kosashvili, 35. Both suffered severe burns in the explosion and fire that followed. A third worker, a man in his 20s, remains sedated and on a ventilator in intensive care, according to Ynet's reporting. Calcalistech reported that preliminary findings point to a technical failure in the neck of a tank holding roughly 8 tons of NF3 at the time of the incident. Police said there was no indication the blast was an attack and that investigators suspected a technical malfunction during the transfer of material into the factory's tanks. The explosion happened on a day the country's prime minister was touring the city. Kiryat Gat isn't a minor node in Intel's network. Fab 28 there makes processors along with 5G and AI-related components, and it's one of the sites Intel has pointed to as it tries to rebuild manufacturing credibility after years of delays and cost overruns. Intel has also been expanding a second plant on the same campus, Fab 38, though construction was paused in 2024. A facility already carrying extra weight in Intel's turnaround story just became the site of a fatal industrial accident. Commerce Secretary Howard Lutnick has asked a Delaware court to dismiss a lawsuit alleging the US government's 9.9% stake in Intel amounted to an illegal seizure. He's defending the deal as vital to national security, and hinting defense contractors could be next. - how to dismiss lawsuit over government Intel stake - Commerce Secretary Lutnick fights Delaware corruption charges Intel Here's the uncomfortable part for investors: Intel hasn't said whether Kiryat Gat's output was affected, or for how long. On October 19, the company said its monitoring systems detected another NF3 leak during preparations to remove gas tanks from the site; no injuries were reported, but Intel still provided no production-impact figures. Gotrade reported that Intel shares fell 2.8% to $95.37 on October 15, one day after the explosion, amid concern about the blast and a broader chip selloff. The stock fell another 5.8% to $89.85 on October 16 before closing at $92.03 on October 19. Intel reports third-quarter results on October 29, according to the company's own investor relations announcement, with a call scheduled for 2 p.m. Pacific that day. That's fifteen days after the explosion and still no public word on whether wafer output, yield, or shipment timelines out of Kiryat Gat took a hit. Executives will have to address it on the call whether they want to or not, and investors will be listening for a number, not a sentiment. A single accident, a jittery sector. The timing is rough beyond Intel's own balance sheet. Chip stocks have been skittish for weeks on memory shortages and swings in AI infrastructure spending, and a fatal accident at a facility that makes both consumer processors and AI-adjacent components lands right in that nervousness. Everyone talks about the AI hardware buildout in abstractions, capacity, yield, roadmap. But it still runs through physical buildings where tanks of toxic gas are unloaded, and where a suspected tank failure can kill two people and rattle investors. Frankly, the most telling fact right now isn't the stock move. It's that a company sophisticated enough to run earnings calls down to the minute hasn't managed one sentence on whether its chips are still coming out of Kiryat Gat on schedule. Grief and operational disclosure aren't the same thing, and Intel owes its workforce one and its shareholders the other. On October 29, it runs out of room to give neither. Join the discussion. No replies yet. Start the discussion. Julian Lim is an entrepreneur, technology writer, and a researcher. He started JL Data Analysis after graduating from NUS in Intelligent Systems. Julian writes about technology innovations and entrepreneurship on Business Times, Asia Pacific Magazine and occasionally contributes to Startup Fortune.

Wccftech
Oct 20th, 2026
Intel XeSS could soon deliver better performance on Linux as Intel works to enable XMX acceleration through Valve's Proton.

Intel XeSS could soon deliver better performance on Linux as Intel works to enable XMX acceleration through Valve's Proton. Intel is working on improving XeSS (Xe Super Sampling) support on Linux, with a new series of patches aiming to enable hardware-accelerated XeSS upscaling through Valve's Proton compatibility layer. The proposed changes would allow supported Intel Arc GPUs to take advantage of their dedicated XMX (Xe Matrix eXtensions) engines when running Windows games on Linux, potentially delivering substantially better upscaling performance. As reported by Phoronix, Intel engineer Damian Tomczak has submitted four interconnected pull requests targeting Proton, Wine, VKD3D-Proton, and DXVK. Together, these changes address a longstanding limitation that has prevented XeSS from fully utilizing Intel's dedicated AI acceleration hardware in Windows games running through Proton. Currently, XeSS can operate through a slower fallback path under Proton, meaning Intel GPU owners may not benefit from the more efficient XMX-accelerated implementation available on Windows. The proposed solution introduces a built-in libxess.dll runtime within Wine that forwards Direct3D12 XeSS calls to the native Linux XeSS library (libxess.so), allowing workloads to execute through the accelerated path. The Wine pull request explains that Direct3D 12 objects are translated into Vulkan objects through VKD3D-Proton's interoperability interface, enabling the native XeSS implementation to operate within Proton's existing graphics translation infrastructure. Accompanying changes to VKD3D-Proton ensure that the necessary Vulkan extensions and device features are enabled, while DXVK receives adjustments to prevent Intel GPUs from being incorrectly hidden from games when Proton supplies its own XeSS library. Meanwhile, the Proton-specific implementation handles library selection and compatibility. Proton will search for a suitable native Linux XeSS library, including user-specified locations, and only use it when its version meets or exceeds the version required by the game. Otherwise, the game will continue using its existing Windows XeSS DLL. This approach should preserve compatibility while unlocking the faster hardware-accelerated XeSS implementation wherever the necessary Intel hardware and software support are available. It's worth emphasizing that this development concerns XeSS Super Resolution's XMX acceleration, rather than introducing the entire XeSS feature suite to Linux. It also primarily benefits compatible Intel Arc GPUs equipped with XMX engines, rather than GPUs from AMD or NVIDIA. The four pull requests remain under review and have not yet been merged, so there is currently no confirmed release date for the improvements. Nevertheless, this is a welcome development for Intel Arc owners gaming on Linux, particularly as Proton continues to narrow the compatibility and performance gaps between Windows and Linux gaming. If successfully implemented, the changes could finally allow Intel's dedicated XMX hardware to deliver its intended XeSS performance advantages in Windows games running through Proton. About the author: Sebastian Castellanos is a data scientist by education and training. He's also deeply passionate about PC gaming hardware and software. He has recently started writing technical articles and guides on Wccftech about PC hardware, games and mods. Follow Wccftech on Google to get more of its news coverage in your feeds.