G

GE Vernova

Builds equipment and software for electric power

Installation System Integration Leader

Full-Time
No salary listed
Senior
Bachelor's
Barcelona, Spain
RemoteGlobal travel of up to 10% is required.
Mechanical EngineeringDesign Engineering

About the job

Requirements
  • A Bachelor's Degree in Engineering, specifically Mechanical, Industrial, Civil, or an equivalent field.
  • A minimum of 5 years of experience in onshore wind.
  • Ability and willingness to travel globally up to 10% of the time.
  • Ability and willingness to climb wind turbines and work at heights.
  • Proficiency in written and spoken English.
Responsibilities
  • Lead subsystem-level installation design reviews for new units covering the stated installation capabilities and material handling, and own Installation Engineering deliverables in the New Product Introduction Technical Governance process.
  • Identify specialty tooling needed for each new turbine platform or platform design change, and track required changes as the platform evolves.
  • Lead virtual installation walk-throughs involving multiple tools to ensure installation readiness and identify improvements and risk mitigations in installation sequences.
  • Support Serviceability Systems Integration Leadership in creating Design Milestone 1 inputs for installation, including critical requirements such as wind-speed limits and required installation capabilities.
  • Interface directly with Installation Engineers to provide product requirements for new tools and launch programs in alignment with other subsystems.
  • Interface directly with New Units Systems Integration Leaders and Systems Engineers to drive component- and system-level design decisions and trade-offs related to installation.
  • Identify major risks in the relevant programs and capabilities, and work cross-functionally with Systems Integration Leaders, Installation Engineering, and Product Line teams to develop process failure mode and effects analyses and mitigation plans.
  • Provide technical support and input to installation business cases and capability matrices, considering complexity, wind-speed limits, crane sizes, and related factors.
  • Escalate potential environment, health, and safety issues to the Services Environment, Health, and Safety and Engineering Safety teams.
  • Maintain broad awareness of efforts within Installation Engineering and Repair Technology teams to apply lessons learned and respond to customer and program needs.
Desired Qualifications
  • Expertise in wind turbine installation.
  • Hands-on installation, service, or repair experience.
  • Ability to work in a dynamic environment with diverse organizations and individuals across global locations.
  • Ability and willingness to challenge existing practices and technology to identify optimal product solutions.
  • Strong interpersonal skills and ability to interact with senior management and hourly technicians.
  • Familiarity with basic industrial tooling.
  • Interest in experimenting with and prototyping new solutions.
  • Project or program leadership experience.
  • Strong oral and written communication skills.
  • Familiarity with computer-aided design and analysis.
  • Proficiency with Excel, PowerPoint, Word, and Access.
  • A record of being team-oriented and results-driven.
  • Ability and willingness to climb wind turbines and work at heights.
  • Ability and willingness to travel globally up to 15% of the time when required.

About the company

GE Vernova makes equipment and software that generate and manage electricity for utilities, power producers, and industrial customers. Its Power, Wind, and Electrification businesses span gas turbines, wind generation, and the systems that move electricity across grids. The company supplies generators, grid equipment, and controls, while its software coordinates network operations and integrates changing sources of power. Customers buy equipment and enter service agreements for maintenance, upgrades, and technical support over its operating life, alongside purchases of software and related services. GE Vernova became an independent company in 2024 after separating from GE and is headquartered in Cambridge, Massachusetts.

Company Size

10,001+

Company Stage

N/A

Total Funding

$17.6M

Headquarters

Cambridge, Massachusetts

Founded

2024

Get referred to GE Vernova

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • Demand supports expansion: July 2026 results show GE Vernova booked $24.2 billion of quarterly orders, up 88% organically.
  • Service commitments support recurring work: GE Vernova says services account for more than 55% of its backlog.
  • Graduates build depth through rotations: GE Vernova runs two-year Next Gen development programs in engineering, technology, and operations.

What critics are saying

  • Wind remains a drag: July 2026 results show GE Vernova lost $275 million in quarterly Wind segment EBITDA.
  • Project margins absorb overruns: GE Vernova locks prices before completion and discloses meaningful expenses from excess costs and penalties.
  • Field assignments demand long weeks: GE Vernova's listed transformer specialist works typical 12-hour site days, up to six weekly.

What makes GE Vernova unique

  • Its technology underpins global power: GE Vernova says customers generate approximately one-quarter of world electricity using its equipment.
  • Gas turbine scale anchors expertise: GE Vernova reports the largest installed fleet by generating capacity, across approximately 7,000 turbines.
  • Nuclear work reaches beyond equipment: GE Vernova Hitachi supplies advanced reactors, fuel, and services for operating plants.

Help us improve and share your feedback! Did you find this helpful?

Benefits

  • Health Insurance
  • Dental Insurance
  • Vision Insurance
  • Life Insurance
  • Disability Insurance
  • 401(k) Retirement Plan
  • 401(k) Company Match
  • Paid Vacation
  • Paid Parental Leave
  • Mental Health Support
  • Relocation Assistance
  • Performance Bonus

Company News

Yahoo Finance
Oct 22nd, 2026
GE Vernova Q3 preview: $176B backlog and 145% expected EPS growth ahead of October 28 report

GE Vernova will report third-quarter 2026 results on October 28. Analysts expect earnings of $4.03 per share, up more than 145% from a year earlier. In the second quarter, equipment orders more than doubled and service orders rose 15%. Total backlog climbed to $176 billion. For the third quarter, the company expects Power segment revenue growth of 17%–19% and an EBITDA margin of about 17%–18%, up from 13.3% a year earlier. Electrification revenue is forecast at $3.8 billion–$4.0 billion. The stock is about 26% below its 52-week high, which has eased valuation concerns. Most analysts rate it a "Strong Buy.

Yahoo Finance
Oct 22nd, 2026
GE Vernova up 600% since spin-off, with a $176B backlog: is the dip a buying chance?

GE Vernova's shares have risen nearly 600% since the company was spun off from GE Aerospace in 2024, driven by demand for electricity from artificial intelligence data centres. The stock has been in a lull since April. In the second quarter, its power division's revenue grew 14% to $5.5 billion, while new orders rose 134% to $16.7 billion, mostly for natural gas turbines. Its electrification arm's revenue climbed 68% to $3.6 billion, with orders up 93% to more than $6.3 billion. Total backlog stands at $176 billion, more than three times next year's expected revenue of $53 billion. Manufacturing capacity is the main bottleneck. About 80% of customers are traditional, and 20% are data centres. Most analysts rate the stock a strong buy, with a consensus price target of $1,199.47.

Yahoo Finance
Oct 22nd, 2026
GE Vernova stock down 10.1% as gas turbine prices and $12.5B cash guide face six-month test

GE Vernova stock has fallen 10.1% since April 21, 2026, while the S&P 500 gained 9.8%. Investors appear to be betting that customers will keep paying rising prices for its gas turbines, with cash up front. Management expects at least 125 gigawatts of equipment under contract by the end of 2026. The company's third-quarter results, due around October 28, will show whether turbine prices keep climbing. In July, management said first-half equipment orders were priced more than 20% above fourth-quarter 2025 orders. Full-year free cash flow is due around January 26, 2027. Management raised its 2026 guide to $11.5 billion to $12.5 billion, from $6.5 billion to $7.5 billion. Wind revenue is expected to fall at a low double-digit rate in the third quarter.

Yahoo Finance
Oct 21st, 2026
GE Vernova shares rise 3.5% to $921 as Nvidia tie-up links grid planning to AI; backlog hits $176B

GE Vernova is working with Nvidia on infrastructure and digital-twin tools that link grid planning to the needs of AI factories. The company's shares rose 3.46% to $921.12 at 11:04 EDT on Wednesday. AI facilities need electricity, and GE Vernova supplies equipment that helps deliver it. The collaboration adds a digital planning layer to that opportunity. Through the second quarter, the company reported more than $5 billion in data-center orders, over twice its full-year 2025 total. Quarterly orders hit $24.2 billion, and backlog reached $176 billion, up $13 billion from the previous quarter. Revenue rose 22% to $11.1 billion. Adjusted EBITDA margin reached 11.3%. The next test is execution: turning backlog into revenue and reaching a projected 2026 adjusted EBITDA margin of 12% to 14%.

Yahoo Finance
Oct 16th, 2026
GE Vernova wins five Venture Global grid reservations; $3,400 model target implies 267% upside

GE Vernova has reserved five grid equipment packages for Venture Global, under an agreement signed October 9. GE Grid Solutions will supply transformers and gas-insulated switchgear for up to 21 power island projects, with purchase orders starting in late 2026. Venture Global also reserved eight power islands with GE Vernova, and expects to order its first by the end of 2026. Beyond reservation fees, neither deal binds the buyer; the roughly $17.2 billion total assumes every order proceeds. GE Vernova shares closed at $926.44 on October 15, 21.14% below their June record but up about 42% in 2026. The company's Electrification backlog has grown to $45 billion from $6 billion at the end of 2021. Third-quarter results are due October 28.