O

Oracle

Builds databases, business apps and cloud services

Senior Data Center Commissioning Engineer 1

Full-Time
$102.3k - $209.5k/yr+ Bonus + Equity
Senior
Bachelor's
El Paso, TX, USA+1 moreMore locations: Las Cruces, NM, USA
In PersonMust reside in the El Paso, Texas or Las Cruces, New Mexico area; relocation assistance available.
Architecture & Civil EngineeringBuilding Services Engineering

About the job

Requirements
  • Bachelor’s degree in Engineering, Construction Management, or related field (or equivalent practical experience).
  • Significant experience commissioning mission-critical facilities (data centers strongly preferred), including electrical and mechanical systems.
  • Demonstrated ability to lead commissioning through: functional testing; IST planning/execution; energization and start-up coordination; turnover and operational acceptance.
  • Strong understanding of: critical electrical systems (UPS, generators, switchgear, ATS/STS, grounding); cooling systems (chillers/CDUs, CRAH/CRAC, pumps, heat rejection); controls/monitoring (BMS, EPMS, alarms, trending).
  • Experience working with contractors, commissioning agents, and vendors; ability to drive outcomes through influence.
  • Strong documentation and communication skills; comfort presenting to executive and technical audiences.
  • Working knowledge of applicable codes/standards and commissioning best practices (e.g., ASHRAE guidance, local AHJ requirements).
Responsibilities
  • Own end-to-end commissioning strategy and execution across one or more data center projects, ensuring consistent, repeatable outcomes.
  • Lead development and governance of key Cx deliverables: Cx plans, test scripts/procedures, checklists, IST plans, MOPs/SOPs, and turnover packages.
  • Coordinate and drive Integrated Systems Testing (IST), including planning, prerequisites, execution oversight, defect tracking, and retest closure.
  • Ensure system readiness across major infrastructure domains: MEP, EPMS, BMS/controls, generators, UPS, switchgear, chillers/cooling plants, containment, and associated alarms/monitoring.
  • Manage and communicate commissioning milestones, constraints, risks, and blockers to leadership and cross-functional teams.
  • Oversee commissioning vendors/agents and contractors; validate quality of testing, documentation, and closeout.
  • Drive a strong safety and compliance culture during test execution and energization activities.
  • Partner with Design/Engineering to ensure commissionability is built in early (sequences of operation, points lists, alarms, trending).
  • Establish commissioning requirements for:
  • Factory witness testing (FWT) and FAT/SAT where applicable
  • Level 1–5 (or equivalent) commissioning stages
  • equipment start-up and functional performance testing (FPT)
  • IST and operational scenarios (failure modes, redundancy, maintenance bypass)
  • Coordinate with Construction and Trades to enforce prerequisite discipline before testing (install complete, pre-functional checks, TAB complete where relevant, documentation in place).
  • Lead issue management: log defects, assign owners, prioritize by risk/criticality, track to closure, and validate retests.
  • Produce clear status reporting: milestone tracking, readiness dashboards, risk registers, and turnover readiness.
  • Drive handover to Operations: training, spares, O&M manuals, as-builts, sequences, and acceptance criteria.
  • Ensure commissioning outcomes align with owner design intent, reliability targets, and operational runbooks.
Desired Qualifications
  • Direct commissioning experience supporting GPU/high-density or liquid-cooled data halls (CDUs, leak detection, controls integration).
  • Experience commissioning hyperscale or multi-site programs with standardized Cx playbooks and repeatable processes.
  • Professional certifications: CxA/CCP (commissioning), PMP, PE, LEED (as applicable).
  • Experience with digital commissioning tools and platforms (e.g., field QA/QC and punch management systems).
  • Strong background in operational readiness, including runbooks, MOP/SOP development, and operator training.
  • Familiarity with reliability validation practices and redundancy testing (N, N+1, 2N) and maintenance bypass scenarios.

About the company

Oracle builds databases, business applications, and cloud infrastructure for companies and public-sector organizations. Oracle Database stores and processes business data, while Oracle Cloud Infrastructure provides computing, storage, and networking for applications and AI workloads. Fusion Cloud Applications support finance, human resources, supply chains, and customer service, helping businesses manage everyday operations and reporting. Customers pay for cloud subscriptions and usage, software licenses, support, hardware, and consulting, with deployment options in Oracle's cloud or their own data centers. Oracle was founded in 1977 and is headquartered in Austin, Texas.

Company Size

10,001+

Company Stage

IPO

Headquarters

Austin, Texas

Founded

1977

Get referred to Oracle

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • Cloud infrastructure sales grew: Oracle reported $7.4 billion quarterly revenue, up 121% yearly, in September 2026.
  • Employees build transferable skills: Oracle offers free product certifications and access to Coursera, O'Reilly, and LinkedIn Learning.
  • Existing licenses create repeat business: Oracle sells annual technical support covering software updates, fixes, and assistance.

What critics are saying

  • Expansion consumes cash: Oracle reported negative $5 billion free cash flow for its August 2026 quarter despite profitable operations.
  • Job security faces active restructuring: Oracle's September 2026 filing added $700 million to a plan centered on employee severance.
  • Future datacenters lock in costs: Oracle's September 2026 filing lists $288 billion of future lease commitments, typically lasting 15-19 years.

What makes Oracle unique

  • Its database runs inside rival clouds: Oracle delivers native database services in AWS, Azure, and Google Cloud datacenters.
  • Global expansion keeps one rate card: Oracle charges the same OCI service prices across regions, including government clouds.
  • Hardware participates in database work: Oracle's Exadata storage servers process data-intensive queries alongside specialized database servers and networking.

Help us improve and share your feedback! Did you find this helpful?

Benefits

401(k) Savings and Investment Plan with company match

Paid time off: Flexible Vacation is provided to all eligible employees assigned to a salaried (non-overtime eligible) position. Accrued Vacation is provided to all other employees eligible for vacation benefits. For employees working at least 35 hours per week, the vacation accrual rate is 13 days annually for the first three years of employment and 18 days annually for subsequent years of employment. Vacation accrual is prorated for employees working between 20 and 34 hours per week. Employees working fewer than 20 hours per week are not eligible for vacation.

11 paid holidays

Paid sick leave: 72 hours of paid sick leave upon date of hire. Refreshes each calendar year. Unused balance will carry over each year up to a maximum cap of 112 hours.

Paid parental leave

Adoption assistance

Employee Stock Purchase Plan

Financial planning and group legal

Voluntary benefits including auto, homeowner and pet insurance

Growth & Insights and Company News

Headcount

6 month growth

2%

1 year growth

2%

2 year growth

3%
Yahoo Finance
Oct 13th, 2026
Oracle urges FERC to fast-track gas pipeline for $1.1B Project Jupiter data centre

Oracle has urged the Federal Energy Regulatory Commission (FERC) to speed up approval of the 17.8-mile Green Chile pipeline in New Mexico. It says delays threaten its Project Jupiter data center campus. The pipeline would carry about 400 million cubic feet of natural gas a day to power the site's microgrid, which uses Bloom Energy fuel cells. Its start date has slipped to February 2027 from August, after local opposition forced developer Transwestern Pipeline Co. to move the route onto federal land. Environmental groups and New Mexico Attorney General Raúl Torrez want FERC to review the data center and pipeline together. Oracle has considered trucking in gas for early commissioning work. In a letter to FERC on Tuesday, Oracle said the four-building campus would support nearly 5,800 peak construction jobs and generate up to $1.1 billion in annual economic output for Doña Ana County.

Yahoo Finance
Oct 13th, 2026
Oracle vs Intuit: why Oracle's 30% cloud growth beats Intuit's cheaper valuation

A Motley Fool analysis picks Oracle over Intuit as the better tech stock to buy in 2026, though it flags risks at both companies. Intuit posted fiscal 2026 revenue of $21 billion, up about 14%, with net income near $4.6 billion and free cash flow of $8.6 billion. It trades at a forward price-to-earnings ratio of 13.1x, against 17.4x for Oracle. The author warns it could be a value trap as cheaper tax tools threaten its individual customer base. Oracle reported revenue of about $67 billion, up 17%, and net income of $17 billion. Free cash flow was negative at nearly $5.4 billion. Its debt-to-equity ratio fell from 3.6x in May to 2.3x in August. The author favours Oracle for its cloud backlog and 30% revenue growth last quarter.

Yahoo Finance
Oct 13th, 2026
PowerPlan launches supported Enterprise Adapter for Oracle Fusion Cloud ERP, ending custom code

PowerPlan, a financial software provider for asset-intensive companies, has launched an Enterprise Adapter for Oracle Fusion Cloud ERP. The Atlanta company announced the product on October 13, 2026. The adapter gives customers a standard, supported way to bring Oracle financial and project data into PowerPlan's Project and Asset Accounting solution. It replaces the custom integrations many teams now maintain themselves, which grow costly as cloud software updates frequently. "We support the connection and maintain it as both platforms evolve, so our customer teams don't have to," said Todd Bransford, chief product officer at PowerPlan. The adapter is available now. It is part of PowerPlan's growing suite of Enterprise Adapters.

Yahoo Finance
Oct 12th, 2026
Founder-led stocks to watch: Credo, Oracle and Nu Holdings, worth up to $428.7B

Simply Wall St has highlighted three founder-led US stocks for investors who want company leaders with a stake in the outcome. The picks come from a screener that surfaces 25 more such businesses. Credo Technology Group Holding makes high-speed connectivity chips and cables. It earns about $1.6 billion from semiconductors and has a market value near $40.7 billion. Its DustPhotonics acquisition pushes it into longer-range, higher-bandwidth products. Oracle, shaped by Larry Ellison's ownership, draws most of its $71.8 billion revenue from cloud and software. Its market value is near $428.7 billion. Nu Holdings, co-founded by David Vélez, has $8.4 billion in banking revenue and a market value of about $77.9 billion. Brazil's central bank will require it to obtain a full banking licence by 2026.

Yahoo Finance
Oct 10th, 2026
Oracle edges Cisco in dividend battle despite 30% YTD decline

Oracle and Cisco are both positioned to benefit from growing AI infrastructure demand, though through different approaches. Oracle focuses on cloud computing power through its Oracle Cloud Infrastructure, while Cisco concentrates on networking and security, including its Secure AI Factory partnership with Nvidia. Oracle reported annual sales of $67.36 billion and net income of $17.09 billion, outpacing Cisco's $63.33 billion in sales and $13.27 billion in profit. Oracle trades at 22 times forward earnings versus Cisco's 27 times. Both companies offer a 1.4% dividend yield. However, Oracle's payout ratio stands at 29%, compared with Cisco's 45%, providing more reinvestment flexibility. Cisco has delivered stronger stock performance with 112% returns over five years, more than double Oracle's 51%. Analysts rate Oracle a "Strong Buy" and Cisco a "Moderate Buy".