E

E-INFRA

Builds and operates energy and telecom infrastructure

Junior Cost Controller

Full-TimePosted on 10/19/2026
No salary listed
Junior
Bachelor's
Cluj-Napoca, Romania
In Person
Project & Program ManagementProject Management

About the job

Requirements
  • A completed higher-education qualification in a technical or financial field is required; specialization in energy or construction is an advantage, including Electrical Engineering, Energy Engineering, Civil Engineering, Roads/Bridges, or Construction Installations.
  • At least 1–2 years of relevant experience in a similar position is required.
  • Technical knowledge of project execution and monitoring is required.
  • Knowledge of Microsoft Dynamics 365 and Microsoft Office is required.
  • Advanced Excel skills are required.
  • Knowledge of cost control and project budget estimation is required.
Responsibilities
  • Support site teams with activity planning and ordering materials and services.
  • Collect data and support the preparation of revenue and expenditure reports.
  • Ensure document traceability within the assigned division.
  • Monitor assigned project budgets and establish control indicators and milestones together with a senior cost controller or manager.
  • Report budget status and identified variances, and propose corrective measures.
  • Record work statements in the relevant software.
  • Check subcontractor invoices for contractual compliance and report errors or discrepancies to the direct supervisor and project managers.
  • Prepare payment certificates for subcontractors.
Desired Qualifications
  • Knowledge of planning and updating a construction project is an advantage.

About the company

E-INFRA owns and coordinates businesses that build and operate energy, telecommunications, and civil infrastructure in Romania and international markets. Electrogrup handles engineering and construction, while Direct One and Netcity develop and operate fibre-optic networks used by telecommunications providers. Nova Power & Gas produces, supplies, distributes, and trades electricity and natural gas, and WESEE installs and maintains wind-energy equipment. The group combines infrastructure ownership with project delivery and ongoing technical operations for commercial customers, utilities, and communities. Established as a holding company in 2017, E-INFRA is headquartered in Bucharest, Romania.

Company Size

1,001-5,000

Company Stage

N/A

Total Funding

N/A

Headquarters

Bucharest, Romania

Founded

2017

Get referred to E-INFRA

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • Full-cycle engineering: the industrial-network role covers design, configuration, testing, commissioning, and handover to operating teams.
  • Technical breadth: Direct One's NOC engineer supports fibre, DWDM, and IP networks at both first and second support levels.
  • Accounting breadth: the Cluj economist role spans fixed assets, reconciliations, inventory, reporting, and audit participation.

What critics are saying

  • Nationwide deployment: industrial-network engineers must be available for project and on-site work across Romania.
  • Limited contract duration: the Cluj economist position is on-site and fixed for two years.
  • Language threshold: the Bucharest network-operations position requires advanced English and higher education in telecommunications or computing.

What makes E-INFRA unique

  • Carrier-neutral model: Direct One supplies dark fibre and bandwidth through a non-carrier telecommunications infrastructure network.
  • Open metropolitan access: Netcity makes Bucharest underground ducts and fibre available equally and transparently to telecommunications operators.
  • Founder oversight: Teofil Muresan chairs the group board, while co-founder Simion Muresan serves as vice chairman.

Help us improve and share your feedback! Did you find this helpful?