K

Kinder Morgan

Energy transportation via pipelines and terminals

Pipeline Engineer

Full-TimeUpdated on 10/23/2026Deadline 9/24/27
No salary listed
Mid, Senior
Bachelor of Science (BS)
Shreveport, LA, USA
In PersonBased at the Kinderhawk office in Shreveport; Monday through Friday, with potential on-call duties nights and weekends.
Manufacturing & Process EngineeringProcess Engineering

About the job

Requirements
  • A BS degree in Chemical and Mechanical Engineering from a four-year accredited university.
  • A minimum of 3–5 years of experience in natural gas gathering, compression, processing, dehydration, fractionation, construction, and/or operations.
  • Fundamental knowledge of midstream gas gathering and processing operations, including pig liquids handling, compression, glycol and desiccant dehydration, treating, hydrocarbon recovery, and condensate stabilization.
  • Knowledge of codes, standards, regulations, and best practices applicable to the midstream industry, including API, ASME B31.3/4/8 and VIII, DOT 192/5, and NFPA.
  • Experience performing process simulation and pipeline modeling with HYSYS, PROMAX, WinSim, WinFlow, Synergee, FlareNet, or similar applications.
  • Knowledge and experience with rotating equipment.
  • A valid driver's license and driving record satisfactory to the company and its insurers; the license and record must be maintained.
  • Ability to achieve and maintain all qualifications, certifications, and progression requirements applicable to the job classification.
  • Completion of any assigned site-specific technical training.
  • Ability to work with minimum supervision and complete assignments within an acceptable time frame.
  • Ability to respond to callouts and emergencies during and after regular business hours, including after dark, while carrying a communication device.
  • Computer skills with Microsoft Office software, including Excel, Word, and PowerPoint, as well as MS Project, Maximo, or similar tools.
  • Ability to interpret and design Process Flow Diagrams, Piping and Instrumentation Diagrams, plot plans, piping plans, and piping isometrics.
  • Ability to interface effectively with all levels within the company and with external organizations.
  • Experience with process modeling applications such as HYSYS, PROMAX, or VMGSim.
  • Ability to learn, understand, and apply new technologies.
  • Ability to prioritize and execute tasks in a high-pressure environment, and to organize, plan, document, and complete work independently.
  • Reliable, regularly scheduled, and punctual attendance.
  • Ability to work successfully in a team environment, take direction from supervisors, prioritize work schedules, focus attention on details, and follow rules.
  • Strong written and verbal communication skills.
  • Ability to follow safe work practices and actively participate in the safety program.
  • Successful completion of a drug screen and background check after an offer and before employment.
  • Ability to work indoors and outdoors as needed, handle deadline-related stress, walk over uneven surfaces on pipeline rights-of-way or field facilities, and withstand extreme weather.
  • Ability to work while wearing appropriate personal protective equipment, including a hard hat, safety glasses, flame-retardant clothing, steel-toe footwear, and respirator.
  • Ability to frequently enter confined spaces and climb stairs, elevated platforms, excavated areas, ladders, and walkways.
  • Ability to lift at least 20 pounds in awkward positions, 26–50 pounds from floor to waist occasionally, and 51–100 pounds if required; ability to work in low-lit areas.
Responsibilities
  • Support installation, maintenance, and operation of new and existing gas gathering plant operations through process optimization, improved efficiency, and identification of opportunities to improve operating-area performance, safety, operability, and reliability.
  • Evaluate, prepare, and analyze process-system designs, including NGL recovery plants, amine treating plants, glycol dehydration, molecular sieve dehydration, propane refrigeration, condensate stabilization, inlet compression, and residue compression.
  • Design gas and liquid pipelines, meter stations, compressor stations, and pump stations.
  • Develop single- and multi-phase gas hydraulic models and gathering-system evaluations.
  • Develop station process simulations and material and energy balances using ProMax software.
  • Size and specify mechanical equipment, including separators, filters, tanks, heat exchangers, air coolers, pumps, towers, heaters, compressors, control valves, treaters, and dehydrators.
  • Specify piping materials, diameters, and thicknesses to meet design requirements.
  • Apply knowledge of midstream process controls and instrumentation, including control narratives and cause-and-effect matrices.
  • Model and evaluate gas plants and recommend efficiency and debottlenecking projects.
  • Provide technical support for start-ups, troubleshooting, and plant expansions.
  • Participate in PHA/Hazop studies and PSSR as necessary for new and existing facilities.
  • Facilitate and lead Management of Change requirements.
  • Assist applicable parties in establishing facility start-up, commissioning, and operating procedures, including PSSR.
  • Complete and/or validate facility flare and PSV studies using the company's OPP Tool.
  • Develop and review facility PFDs and P&IDs as needed.
  • Work with project managers on front-end process design, finalizing H&MB and major project scope, and evaluating changes to the basis of design as needed.
  • Provide technical support to operations, including troubleshooting, debottlenecking, optimization, maintenance projects, PHA participation and action-item resolution, and DOT/PHMSA/LADNR compliance.
  • Provide technical assistance through written reports, consultation, research, process-debottlenecking studies, and code interpretations.
  • Investigate and resolve problems associated with new or existing facilities and process design, research project-related issues, and identify equipment needed for projects.
  • Initiate and manage optimization-review projects to enhance safety, run time, and/or operating income.
  • Continuously review assets to enhance safety, mechanical reliability, operational flexibility, and capacity.
  • Consult with environmental personnel and provide information relevant to facility environmental permits.
  • Complete appropriate documentation and paperwork.
  • Perform work in compliance with company standards, procedures, regulatory requirements, and tariff requirements.
  • Work safely while performing duties and participate in safety programs, including safety observations, job safety analysis, last-minute risk assessments, and safe driving practices.
  • Respond to communications in a timely manner.
  • Represent and support local operations during design, HASOP, and planning reviews of expansion projects during planning and execution.
  • Develop and maintain pipeline gathering.
Desired Qualifications
  • Experience with third-party equipment manufacturer sizing software applicable to the gas processing industry.
  • Experience with Microsoft Project or Primavera P6.
  • Knowledge of AutoCAD, Plant3D, or CADWork.

About the company

Kinder Morgan operates an energy infrastructure network that moves and stores natural gas, petroleum products, and CO2 across pipelines, terminals, and related facilities. Its four segments—Natural Gas Pipelines, Products Pipelines, Terminals, and CO2—earn revenue by charging fees for transporting and storing energy products. The pipelines move gas and liquids from producers to end users; terminals store and handle products; the CO2 segment supports enhanced oil recovery projects. Its goal is to reliably transport and store energy for customers while expanding into energy-transition projects like renewable natural gas and carbon capture, utilization, and sequestration.

Company Size

5,001-10,000

Company Stage

IPO

Headquarters

Houston, Texas

Founded

1997

Get referred to Kinder Morgan

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • Q2 2026 EBITDA rose 12% to $2.2 billion, with EPS beating estimates.
  • FERC’s June 26, 2026 EIS advanced SSE4 and MSX toward 2028 service.
  • Southeast Connector open season closed October 7, 2026, opening another Southeast growth lane.

What critics are saying

  • Kinder Morgan still depends on FERC approvals for SSE4, MSX, and future expansions.
  • Utility yield competition and rising Treasury rates pressure KMI’s valuation and dividend appeal.
  • A prolonged federal permitting freeze would cripple Kinder Morgan’s expansion model.

What makes Kinder Morgan unique

  • Kinder Morgan’s 79,000-mile network and 139 terminals create unmatched Gulf-to-Rockies optionality.
  • In 2026, 92% of backlog is natural gas, anchored by FERC-regulated take-or-pay contracts.
  • Western Gateway’s 2026 joint venture with Phillips 66 and HF Sinclair deepens downstream reach.

Help us improve and share your feedback! Did you find this helpful?

Benefits

  • Hybrid Work Options

Company News

Yahoo Finance
Oct 21st, 2026
ServiceNow and Kinder Morgan are large-cap picks to watch; Moderna's $96.65B value underwhelms

StockStory, a stock research service, named two large-cap stocks to watch and one to avoid. It advises steering clear of Moderna, which has a market cap of $96.65 billion. Sales fell 20.5% annually over five years, and earnings per share dropped 24.5% annually. Its free cash flow margin fell 95.9 percentage points. The stock trades at $241.71, or 44.1x forward price-to-sales. ServiceNow ($154.6 billion market cap) grew annual recurring revenue 22.3% over the last year and has a free cash flow margin of 33.4%. It trades at $148.56 per share. Kinder Morgan ($74.75 billion market cap) reported $17.96 billion in revenue. Its shares trade at $33.64, or 22.5x forward earnings.

Yahoo Finance
Oct 14th, 2026
Delek, Kinder Morgan and World Kinect: three fuel stocks exposed to rising gas prices

Hotter US consumer price index data and a sharp jump in fuel costs have put inflation back in focus. A Simply Wall St screen names three fuel stocks exposed to higher gasoline and diesel prices. Delek US Holdings, a refiner valued at about $4.7 billion, earns roughly $11.9 billion from refining and $1.2 billion from logistics. Its enterprise optimisation program is expected to add $130–$170 million of annualised cash flow. Kinder Morgan, valued at about $73.7 billion, moves and stores fuel through its pipelines and terminals. Natural gas pipelines bring in about $11.7 billion of revenue, and about $10 billion in gas projects sit outside its sanctioned backlog. World Kinect, a fuel marketer valued at about $1.8 billion, reports $22.6 billion in aviation revenue, $10.4 billion from land and $8.7 billion from marine operations.

Seeking Alpha
Sep 30th, 2026
Kinder Morgan, Inc. (KMI) presents at Wolfe Research Utilities, Midstream & Clean Energy Conference 2026-New York transcript.

Kinder Morgan, Inc. (KMI) presents at Wolfe Research Utilities, Midstream & Clean Energy Conference 2026-New York transcript. 162.36K Followers Kinder Morgan, Inc. (KMI) Wolfe Research Utilities, Midstream & Clean Energy Conference 2026-New York September 30, 2026 10:20 AM EDT Company Participants David Michels - VP & CFO Conference Call Participants Keith Stanley - Wolfe Research, LLC Presentation Keith Stanley Wolfe Research, LLC Okay. Great. We're continuing our midstream fireside chat here. Very happy to have David Michels, CFO of Kinder Morgan, joining us. David, why don't you give some opening remarks on the company, please? David Michels VP & CFO Sure. First, thanks for having us here, Keith. Appreciate it. Good set of meetings so far. Looking forward to the rest of the day. So as we'll talk about more during this meeting, this is a pretty opportunity-rich environment for midstream companies, natural gas infrastructure development opportunities are as strong as we've seen in decades. So it's creating a lot of interesting opportunities for us for additional growth. Our base business remains very solid. We'll talk about the full utilization of networks across the space, which has led to the ability for us all to capture additional value when we see periods of time of disruptions, weather events. And then on top of that, these new opportunities to satisfy growth in the LNG space, growth in the power generation space is allowing us to add projects and grow additional - add additional EBITDA on top of our base business. So it's a great place to be right now, and it's very exciting. So we're pretty enthusiastic about the outlook for the company and looking forward to the conversation to get into that a little bit more. Question-and-Answer Session Keith Stanley Wolfe Research, LLC Great. So maybe we could start high level. I think about a year ago now, you put out a $10 billion shadow backlog. You talked to $3 billion plus per year of

Marcellus Drilling News
Sep 25th, 2026
Kinder Morgan unveils Southeast Connector pipe across Tennessee.

Kinder Morgan unveils Southeast Connector pipe across Tennessee. September 25, 2026 Kinder Morgan has a new pipeline project in the works, one MDN has not told you about before, because until yesterday nobody outside the company had heard of it. It's called the Southeast Connector, and it would run north to south across Middle Tennessee through 10 counties, stitching together two of Kinder's biggest interstate systems: Tennessee Gas Pipeline (TGP) and Southern Natural Gas (SNG). Kinder VP Allen Fore made the rounds in DeKalb County on Thursday, meeting the county mayor, the Chamber of Commerce, and local media. Land agents may start knocking on doors as early as next week. Target in-service: 2029.

Oil & Gas Leads
Sep 18th, 2026
Kinder Morgan advances $10.1B natural gas project backlog.

Kinder Morgan advances $10.1B natural gas project backlog. Kinder Morgan Expands U.S. Natural Gas Network as Power and LNG Demand Accelerate Kinder Morgan is expanding its U.S. natural gas infrastructure as growing liquefied natural gas (LNG) exports, gas-fired power generation and data-center development tighten pipeline and storage capacity. The company estimates U.S. gas demand could reach approximately 150 billion cubic feet per day (Bcf/d) by 2031 - about 27% above 2026 levels - and reports that utilization across its five largest gas pipelines already exceeds 90%. Its approved expansion backlog totals approximately $10.1 billion, with an average in-service date of first-quarter 2028. Major developments include the Trident Pipeline, Gulf Coast Express expansion, Amarillo Expansion, KinderHawk processing expansion and additional natural gas storage capacity. Kinder Morgan is also acquiring the Monument Pipeline System for approximately $500 million to strengthen its Texas intrastate network. Kinder Morgan U.S. Natural Gas projects. Kinder Morgan is developing additional infrastructure opportunities capable of serving more than 10 Bcf/d of power-generation demand and over 3 Bcf/d of LNG-related demand. This investment cycle creates opportunities for engineering, construction, compression, pipeline integrity, automation, measurement, electrical, storage and processing-equipment suppliers. Industry impact. Kinder Morgan's investments show how U.S. natural gas infrastructure is becoming central to LNG exports, grid reliability and data-center growth. The United States' position as a secure and scalable energy supplier - or "Safe Barrel" and increasingly a safe source of natural gas - supports long-term domestic infrastructure investment while giving global buyers an alternative to supplies exposed to geopolitical disruption. Sales strategy. Oilfield and midstream service companies should prioritize Kinder Morgan's Texas, Haynesville and Gulf Coast projects. Target project engineering, construction, operations, pipeline integrity, compression, storage and procurement teams with location-specific capabilities tied to 2026 construction activity and the Trident startup in 2027. Kinder Morgan is advancing a $10.1 billion project backlog to expand U.S. natural gas transportation, processing and storage capacity. Major opportunities are emerging across Texas, the Haynesville and the Gulf Coast as LNG, power generation and data centers drive higher gas demand.