A

Alliant Energy

Regulated electric and natural gas utility

Senior Generation Engineer - Plant Engineer, Mechanical

Full-TimeUpdated on 10/24/2026
$106k - $186k+ Annual incentive program
Senior
Bachelor's
Pardeeville, WI, USA
In Person
Mechanical EngineeringMechanical Maintenance and Reliability Engineering
No H1B Sponsorship

About the job

Requirements
  • A bachelor's degree within an engineering program accredited through the Engineering Accreditation Commission is required.
  • Seven years of related experience is required.
  • Project management leadership experience is preferred, along with the ability to work with subcontractors and cross-functional teams; expertise in a particular area of the discipline may be required.
  • Effective interpersonal, verbal, and written communication skills are required.
  • Ability to use computer software programs such as email, word processing, spreadsheets, and project management software is required.
  • Ability to work effectively in a collaborative and inclusive work environment is required.
  • Understanding of mechanical and structural codes and standards, equipment and system maintenance practices, equipment and system performance standards, failure modes, thermal cycles, cost-benefit analysis, and testing methodology is essential.
  • Previous experience with coal conveyor systems, boiler duct work and expansion joints, air heaters, air quality control systems including SDA and SCR, pumps, cooling towers, fans, and compressed air systems in power generation or heavy industrial environments is highly desirable.
  • Candidates must successfully complete a background check and, where applicable, a drug screen.
  • Visa sponsorship is not supported.
Responsibilities
  • Troubleshoot faults and provide timely technical direction and repair scope to the plant.
  • Execute projects from scoping through completion, including onsite contractor management.
  • Conduct equipment inspections and health assessments as part of troubleshooting efforts and to meet statutory obligations.
  • Independently perform complex assignments requiring in-depth analysis to determine appropriate solutions.
  • Identify problems and solutions and make safety suggestions to maintain a safe work environment, using tools and standards to design safety into operating and maintaining equipment.
  • Proactively identify and analyze problems, recommend solutions to customer needs with minimal guidance, and go beyond generally accepted guidelines.
  • Solve complex problems by using experience and outside references to identify new ways of using existing procedures, techniques, and resources.
  • Develop technically sound and cost-effective recommendations, understand their application to other problems and systems, and demonstrate critical thinking.
  • Present alternatives and constructively influence customer decision-making.
  • Make higher-risk decisions involving direct application of technical knowledge and potentially affecting multiple business areas, with proper customer sign-off.
  • Provide guidance to less experienced personnel and may mentor new employees or interns.
  • Build effective working relationships and credibility with employees, contractors, customers, functional groups, and internal and external peers.
  • Explain technical problems to internal stakeholders and prepare detailed technical studies and project documentation for future reference.
  • Manage project budgets, process accruals, and communicate anticipated budget changes.
  • Apply FIN 102 requirements when executing requisitions, receipts, and related project tasks.
  • Understand corporate financial statements and how project implementation and property unit catalog citations affect rate payers and shareholders; provide input to property unit catalog modifications as appropriate.
  • Support generation facility outages.
  • Perform other duties as needed to support company values and serve customers and communities.
Desired Qualifications
  • Experience with coal conveyor systems, boiler duct work and expansion joints, air heaters, air quality control systems including SDA and SCR, pumps, cooling towers, fans, and compressed air systems in power generation or heavy industrial environments.

About the company

Alliant Energy is a regulated utility that provides electric and natural gas services to residential, commercial, and industrial customers in the Midwest, mainly Iowa and Wisconsin. It generates, distributes, and sells electricity and natural gas, and also collects service fees for energy distribution and maintenance. The company operates under state and federal regulation to ensure fair pricing and reliable service. It funds renewable energy projects such as wind and solar, runs energy-efficiency programs, and offers financial assistance to low-income customers while supporting local communities. Its approach combines steady regulated operations with ongoing investments in cleaner energy and customer assistance to maintain affordable, reliable service.

Company Size

1,001-5,000

Company Stage

IPO

Headquarters

Madison, Wisconsin

Founded

1917

Get referred to Alliant Energy

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • On July 30, 2026, Alliant beat EPS estimates and reaffirmed $3.36-$3.46 guidance.
  • Management expects about 60% load growth by 2031, driven by five executed electric service agreements.
  • QTS, Google, and Meta projects are already advancing, supporting earnings into 2027-2029.

What critics are saying

  • Morgan Valley faces organized local opposition, with Linn County hearings and IUC docket GCU-2026-0002 unresolved.
  • A permit denial or delay before December 2026 would push 2027 construction and 2030 commissioning.
  • Data-center concentration risks stranded generation if hyperscale customers slow, cancel, or renegotiate load.

What makes Alliant Energy unique

  • Alliant Energy's Iowa-Wisconsin regulated footprint anchors predictable rate-base growth and allowed returns.
  • Its 2026 pipeline includes 3.4 gigawatts of contracted large-load demand, mostly data centers.
  • Morgan Valley and other projects exploit existing Midwest transmission and utility permitting infrastructure.

Help us improve and share your feedback! Did you find this helpful?

Benefits

  • Health Insurance
  • 401(k) Retirement Plan
  • 401(k) Company Match
  • Tuition Reimbursement
  • Paid Vacation
  • Hybrid Work Options
  • Wellness Program

Growth & Insights and Company News

6 month growth

0%

1 year growth

0%

2 year growth

0%
Raccoon Valley Radio
Oct 22nd, 2026
Gas leak at Greene County High School Thursday morning causes late start for students.

Gas leak at Greene County High School Thursday morning causes late start for students. * Posted By: Coltrane Carlson * October 22, 2026 @ 10:48 am * Feature, Today's Local News Greene County High School students started two hours late Thursday due to a reported gas leak. Greene County School District Superintendent Brett Abbotts says at 7:25am a suspected gas leak was reported to Alliant Energy. He tells Raccoon Valley Radio that while Alliant Energy was on scene, they requested that everyone evacuate the buildings. He notes that this caused an announcement to high school families that there would be a two-hour late start. Abbotts states that Alliant Energy confirmed there were a few gas leaks coming from the Ram Restaurant and Iowa Central Community College kitchen areas. He points out those particular areas had the gas lines shut off and they contacted their service provider, Drees Company and crews will be responding this afternoon. Abbotts explains that Alliant Energy gave the all clear just after 9am and that the two-hour late start for students remained in effect. He adds that the classes that are in the impacted areas are still going to happen because each piece of the kitchen equipment is on an isolated system and since the leak was found to be in just one piece of that equipment, the dedicated gas line was shut off. He says all other equipment was checked and verified to not have any leaks and can be operated as normal.

Yahoo Finance
Oct 20th, 2026
FranklinWH Energy Storage Inc. Joins the Alliant Energy(R) Smart Hours Program to Reward Customers in Wisconsin for Supporting the Grid

FranklinWH Energy Storage Inc. Joins the Alliant Energy(R) Smart Hours Program to Reward Customers in Wisconsin for Supporting the Grid

Civic Media
Oct 18th, 2026
EPA proposes shifting oversight of coal ash landfills in Wisconsin to state regulators.

EPA proposes shifting oversight of coal ash landfills in Wisconsin to state regulators. Wisconsin has six active landfills that are currently subject to state and federal regulations. Oct 18, 2026, 6:46 PM CT The U.S. Environmental Protection Agency is proposing to shift authority to regulate coal ash landfills in Wisconsin from the federal government to state environmental regulators. The Wisconsin Department of Natural Resources sought approval in February of its program to oversee disposal of coal combustion residuals, or coal ash, from the state's electric utilities. Wisconsin has six coal ash landfills that are owned by Dairyland Power Cooperative, Alliant Energy, Wisconsin Public Service and Wimifm Energies. Coal ash is what's left behind from burning coal at power plants to produce electricity. Metals or pollutants within that waste, including arsenic, lead and mercury, can contaminate groundwater without proper storage. Anne Vogel, EPA's regional administrator for its Chicago-based office, said the agency wants to eliminate duplicate regulation. "It's really about having to go to two different regulators and eliminating that barrier makes things more efficient, more cost effective for the management of these landfills in a protective way," Vogel told WPR. The state's regulations must be at least as stringent as federal requirements, but they could be even more protective. Wisconsin moved to streamline regulations under an update to rules for coal ash landfills in 2022, said Kate Strom Hiorns, director of DNR's Waste Materials Management Program. Those changes incorporated 2015 regulations imposed by the Obama administration that addressed landfill design, groundwater monitoring and closure requirements. "By submitting this and getting this program approval, it's that recognition that our regulations are as protective as the federal regulations, and that the sites that are being regulated can be regulated for the most part solely under state regulators and inspections," Strom Hiorns said. Wisconsin utilities support a shift to one set of regulations for their coal ash landfills. "Utilities in Wisconsin have been regulated by the state for many years; transferring this particular permitting authority from the federal to state government is a positive step for Wisconsin," said Dairyland spokesperson Katie Thomson. However, Cheryl Nenn with the environmental group Milwaukee Riverkeeper said she's in favor of dual regulation. "Given the changes in politics at the state level and the federal level, there's some benefit to having that dual oversight," Nenn said, highlighting the state's adoption of federal regulations. The Obama and Biden administrations strengthened coal ash regulations, including a 2024 rule that required oversight of inactive landfills. Under the Trump administration, the EPA has proposed rolling back and revising those requirements. "They'd essentially remove or exempt a lot of these coal ash dump sites from regulation entirely, even though many of them are already showing evidence of groundwater contamination," Nenn said. Nenn said there has been groundwater contamination at the closed, unlined Cedar Sauk Ash Landfill in Ozaukee County that received coal ash from Wimifm Energies' Port Washington power plant from 1969 to 1977. The DNR has ordered the utility to address contamination and conduct sampling for boron and sulfate, which found levels of boron exceeded groundwater standards. Wimifm Energies has said the utility has seen "declining trends" for both in monitoring wells, and sampling indicates no effects to nearby private wells. Strom Hiorns said the state requires utilities to conduct groundwater sampling and has long monitored groundwater at closed coal ash landfills, which wouldn't change under the federal proposal. She said other landfills owned by Wimifm Energies and Alliant Energy have also exceeded preventive action limits or enforcement standards for groundwater. Those detections are tied to older parts of those sites or naturally occurring substances, such as boron or molybdenum. Brendan Conway, a spokesperson for WPS and Wimifm Energies, said their landfills are actively monitored for groundwater impacts and managed in line with state and federal requirements. An Alliant spokesperson said it's committed to full compliance. Under the EPA's proposal, Wisconsin would assume authority only for coal ash landfills. The EPA would continue to oversee coal ash ponds. The EPA is currently accepting public comments on its proposal to shift regulation to Wisconsin's program. A virtual public hearing will be held Nov. 9.

Offshore Source
Oct 16th, 2026
Alliant Energy Corporation declares quarterly common stock dividend.

Alliant Energy Corporation declares quarterly common stock dividend. MADISON, Wis.-(BUSINESS WIRE)-The Alliant Energy Corporation (NASDAQ: LNT) Board of Directors today declared a quarterly cash dividend of $0.5350 per share payable on November 16, 2026, to shareowners of record as of the close of business on October 30, 2026. Dividends on common stock have been paid for 324 consecutive quarters since 1946. Alliant Energy Corporation is recognized as a member of the S&P 500 Dividend Aristocrats Index. Alliant Energy Corporation (NASDAQ: LNT) provides regulated energy service to approximately 1,010,000 electric and 435,000 natural gas customers across Iowa and Wisconsin. Alliant Energy's mission is to deliver energy solutions and exceptional service customers and communities count on - safely, efficiently and responsibly. Interstate Power and Light Company (IPL) and Wisconsin Power and Light Company (WPL) are Alliant Energy's two public energy companies. Alliant Energy is a component of the S&P 500. For more information, visit alliantenergy.com and follow Alliant Energy on LinkedIn, Facebook, Instagram and X. Media Contact: 24-hour access (608) 458-4040 Investor Relations Contact: Susan Gille (608) 458-3956 Read the Article on Business Wire: Read More Posted By OffshoreSource

The Gazette
Oct 14th, 2026
Linn County supervisors approve Morgan Valley host fee.

Linn County supervisors approve Morgan Valley host fee. It would total $7.3 million over Alliant power plant's lifetime. * Fern Alling The Gazette * Oct 14, 2026 updated 4 hrs ago. The Gazette offers audio versions of articles using Instaread. Some words may be mispronounced. CEDAR RAPIDS - The Linn County Board of Supervisors on Wednesday approved a host fee to cover county costs related to hosting the proposed Alliant Energy's Morgan Valley Energy Center, assuming it gains regulatory approved. To build the 720-megawatt, natural gas-fired electricity plant, Alliant Energy submitted an application to rezone agricultural land in unincorporated Linn County. The fee - called a host community agreement - is required as part of the rezoning application. Approval of the host community agreement is not an approval of the rezoning application. The Board of Supervisors' first consideration of the application is scheduled for Tuesday, Oct. 20, pending a recommendation for or against the application from the county Planning and Zoning Commission, scheduled to meet the night before. Both meetings begin at 6 p.m. at The Hotel by Kirkwood Center, 7725 Kirkwood Blvd. SW in Cedar Rapids. The board voted 2-1 in favor of the agreement, with Supervisors Sami Scheetz, a Democrat, and Brandy Zumbach Meisheid, a Republican, in favor, and Supervisor Kirsten Running-Marquardt, a Democrat, opposed. Under the agreement, Alliant will pay Linn County $5.3 million while building the Morgan Valley Energy Center near the Linn-Benton county line northwest of Fairfax. After the plant is built, Alliant will provide around $50,000 a year for 30 years, which is how long the facility is expected to operate. That payment includes a 2% escalator each year. In total, the county would receive $7.3 million for hosting the plant. The agreement will apply even if the property changes hands. If the facility expands by 10% or more, the county will renegotiate terms with Alliant. Under a new state law capping property tax increases, the county will not see a significant increase in revenue from hosting the facility, Linn County Planning and Development Director Charlie Nichols said. "Although a power plant like the Morgan Valley Energy Center would pay property taxes, the county would not realize that in new revenue that it is then able to pay for any services that the county has to provide as a result of that new project," Nichols said. The agreement will cover costs associated with the facility - like emergency response, environmental monitoring and road maintenance. The host community agreement will prevent Linn County residents from shouldering costs, whether or not the project moves forward with county approval, Scheetz said. If the Iowa Utilities Commission decides the Morgan Valley Energy Center is necessary to meet the state's energy needs, Alliant can build it even if the county rejects the rezoning application. "This agreement, while I don't love it, is a good way for us to protect the county, to protect our residents and taxpayers," Scheetz said. Supervisor Running-Marquardt said Alliant has been difficult to work with compared to NextEra Energy, the owner of the Duane Arnold nuclear energy plant near Palo. The county negotiated a host community agreement with NextEra as it works toward restarting the plant. While she said she appreciated the effort Linn County staff put into negotiating the agreement with Alliant, Running-Marquardt voted against it. "Because of all of my concerns, not only for the project, for unanswered questions, for the no guarantee that rates won't be passed on to the citizens of this community that I dearly love, I'm going to give no on today's vote," Running-Marquardt said, Public comment. Public comment largely centered on long-standing issues residents have cited with Alliant's application, such as the plant's environmental health impacts and a lack of input from Benton County officials in decision-making. Fairfax Mayor JoAnn Beer told the board the city of Fairfax is including a host community agreement as part of its proposed data center ordinance. She said the amount Linn County will receive for hosting the Morgan Valley Energy Center "seems extremely modest in comparison." "I have mixed emotions regarding host community agreements that are part of rezoning requirements," Beer said. "While they may provide a path for city or county financial benefits, they also take on the appearance of a price tag being placed on quality of life." Nichols said Linn County's host community agreement amount was determined through cost estimates associated with the plant from county departments. The Iowa Utilities Commission has final approval over the agreement, Nichols said. "I would have liked to see a little bit more, but we also exist in a process where the Iowa Utilities Commission will have the ultimate say over this project," Nichols said. "We were very cognizant of trying to be as reasonable and conservative as we could and not overestimate our costs." Fern Alling is a general assignment reporter for The Gazette. They can be reached at [email protected] or 319-398-8331.