A

Archirodon Group

Builds ports and energy infrastructure

Technical Office Engineer - Equipment

Full-Time
No salary listed
Senior
Bachelor's
Abu Dhabi - United Arab Emirates
In Person
Mechanical Engineering

About the job

Requirements
  • A Bachelor's Degree in Mechanical Engineering or an equivalent engineering discipline is required.
  • A minimum of 5–8 years of experience in mechanical equipment engineering or technical office functions within Oil and Gas engineering, procurement, and construction projects is required.
  • Strong knowledge of static and rotating equipment installation is required.
  • Experience with pumps, compressors, pressure vessels, heat exchangers, storage tanks, filters, skids, and packaged equipment is required.
  • Familiarity with ADNOC engineering standards, project specifications, and Permit-to-Work requirements is required.
  • Good understanding of API, ASME, ISO, original equipment manufacturer standards, and mechanical installation practices is required.
  • Strong knowledge of rotating and static equipment installation, alignment, grouting, preservation, and testing is required.
  • Ability to review vendor drawings, datasheets, equipment layouts, and mechanical installation procedures is required.
  • Knowledge of international engineering standards, including API, ASME, ISO, and ADNOC specifications, is required.
  • Experience preparing requests for information, technical queries, method statements, and material submittals is required.
  • Good understanding of mechanical completion, pre-commissioning, and commissioning processes is required.
Responsibilities
  • Review and interpret general arrangement drawings, equipment layout drawings, vendor drawings, datasheets, piping and instrumentation diagrams, and technical specifications.
  • Prepare and review technical submittals, method statements, material submittals, lifting plans as applicable, requests for information, and technical queries.
  • Coordinate with engineering, construction, procurement, quality assurance and quality control, vendors, and planning teams to resolve technical issues related to equipment installation.
  • Ensure equipment installation complies with ADNOC standards, project specifications, original equipment manufacturer requirements, and applicable international codes such as API, ASME, and ISO.
  • Review equipment installation procedures, alignment requirements, grouting, torque values, preservation requirements, and commissioning documentation.
  • Monitor engineering revisions and ensure the latest approved drawings and vendor documents are available for construction.
  • Review material take-offs and equipment specifications, and support procurement during material and equipment evaluation.
  • Coordinate with Document Control to maintain engineering records and ensure proper document revision control.
  • Participate in constructability reviews and provide technical solutions to support safe and efficient installation.
  • Support pre-commissioning, commissioning, mechanical completion, and preparation of as-built documentation and handover dossiers.
  • Attend technical meetings with clients, consultants, vendors, and subcontractors as required.
Desired Qualifications
  • A minimum of 3 years of experience on ADNOC projects or similar Gulf Cooperation Council oil and gas facilities is preferred.
  • Excellent coordination, analytical, problem-solving, communication, and technical reporting skills are desirable.

About the company

Archirodon Group builds ports, bridges, oil and gas facilities, and other large infrastructure, mostly in the Middle East, Africa, and Europe. Its past projects include Jebel Ali Terminal 2 in Dubai and Khalifa Port in Abu Dhabi, and its work spans marine construction, energy projects, government infrastructure, dredging and pipe laying. National oil companies in Abu Dhabi and Kuwait are among the clients that pay it to run whole projects, from engineering the design and buying materials and equipment to construction, commissioning and operation. Two Greek firms founded Archirodon in 1959, and the group is headquartered in Dordrecht, Netherlands, with a major presence in Athens.

Company Size

10,001+

Company Stage

N/A

Total Funding

N/A

Headquarters

N/A

Founded

1959

Get referred to Archirodon Group

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • Archirodon's October 2025 Kuwait award added a KD160 million oil-pier contract to its construction workload.
  • Archirodon says most teams have worked together for more than ten years, providing established colleagues to learn from.
  • Archirodon reports $4 billion in active projects, a substantial base of contracted work.

What critics are saying

  • Hyundai's March 2026 disclosure confirmed NEOM had terminated Archirodon's tunnel venture after a client-led project reorganisation.
  • Archirodon's consortium withdrew from Albania's port tender in March 2026, citing rising international construction costs, according to the minister.
  • Archirodon's fabrication managers face client audits, verify steel-and-pipe testing before dispatch, and submit weekly and monthly progress reports.

What makes Archirodon Group unique

  • Archirodon owns over 5,000 equipment units, including 300 for marine and diving work and 20 for dredging.
  • Archirodon invests project equity and arranges financing without recourse to investors' balance sheets, alongside construction delivery.
  • Archirodon's Saudi power-and-water experience includes Shoaiba's 15-year construction programme covering electricity generation and desalination.

Help us improve and share your feedback! Did you find this helpful?

Benefits

Relocation Assistance

Company News

Tunnels & Tunnelling
Mar 18th, 2026
Neom cancels The Line tunnels contracts.

Neom cancels The Line tunnels contracts. The 170km-long linear city is being redesigned as data centres. Neom has cancelled the contracts related to the construction of the tunnel sections of The Line in north-west Saudi Arabia, T&TI's sister publication, MEED, reports. In a stock exchange announcement filed on March 13, South Korean contractor Hyundai E&C said that Neom cancelled its contract on December 29 last year. Hyundai E&C was executing the drill-and-blast section of The Line's tunnels in a joint venture with Greece's Archirodon and South Korean counterpart Samsung C&T. The firm said its share of the joint venture was about 35%, amounting to $483m. Neom awarded contracts for constructing the mountain tunnel sections of The Line in June 2022. The drill-and-blast works were split into four packages, with two contracting teams winning two packages each. The other joint-venture team comprised Spain's FCC, the local Shibh Al-Jazira Contracting Company (Sajco) and Beijing-based China State Construction Engineering Corporation. The tunnels formed part of the infrastructure backbone of Neom's 170km The Line development, launched in January 2021. What began as Crown Prince Mohammed Bin Salman's defining symbol of a post-oil Saudi Arabia unravelled with quiet finality over roughly two years. By April 2024, planners were reportedly being forced to cut the initial phase to just 2.4km by 2030. By July last year, with the sovereign wealth fund facing tightening liquidity, the kingdom was reported to have conducted a "strategic review" to determine whether The Line was feasible - a process described as a "recalibration" of Vision 2030. Resources are now being directed to projects essential for the Fifa World Cup 2034, Expo 2030, and critical housing, healthcare and education targets. According to media reports, the government has pivoted towards repositioning what remains of Neom as an industrial and data centre hub, leveraging the Red Sea coastline's access to seawater cooling for AI infrastructure. This news article was first reported by T&TI's sister publication, MEED. Give your business an edge with its leading industry insights.