N

NextEra Energy

Runs a Florida utility and builds wind and solar farms

Control Systems Engineering Manager - Control Systems Engineering

Engineering LeadershipConfirmed live in the last 24 hours
Full-timeJuno Beach, FL, USANo salary listed

About the Job

Requirements

  • Demonstrated leadership in power generation, renewable energy, or utility-scale battery energy storage system controls, with the ability to provide people leadership and hands-on technical direction.
  • Experience managing technical deliverables from domestic and international suppliers.
  • Experience developing, reviewing, and verifying functional and software requirements throughout the project lifecycle.
  • Ability to lead multiple concurrent projects, establish priorities, manage risk, and maintain delivery commitments.
  • Strong written and verbal communication skills, including the ability to align technical and non-technical stakeholders in a matrix organization.
  • Working knowledge of requirements for inverter-based resources and battery energy storage systems, including relevant ISO/RTO interconnection and market rules; NERC MOD, PRC, FAC, TPL, and CIP standards as applicable; and FERC interconnection, market participation, transmission planning, and IBR reliability directives.
  • Bachelor's degree in Engineering.
  • At least 7 years of experience.
  • At least 3 years of supervisor or management experience.

Responsibilities

  • Lead and develop a small team of controls engineers, including work planning, technical direction, coaching, and review of engineering deliverables.
  • Develop and maintain Functional Requirements Documents for utility-scale battery energy storage systems, including plant controls, SCADA, PPC/EMS interfaces, operating modes, alarms, protections, communications, and performance requirements.
  • Establish consistent processes for managing fleet-wide and project-specific control system requirements across the full project lifecycle.
  • Lead supplier coordination and factory integration testing of new hardware and software designs to verify compliance with approved requirements.
  • Provide technical oversight during commissioning, plant turnover, troubleshooting, and final requirements verification.
  • Work cross-functionally within a matrix organization, partnering with Engineering, Construction, Commissioning, Operations, IT/OT, Cybersecurity, Compliance, Development, Procurement, and external suppliers to resolve interfaces and deliver integrated project outcomes.
  • Interpret and incorporate applicable ISO/RTO, NERC, and FERC requirements into battery energy storage system control philosophies, functional requirements, testing, and compliance evidence.
  • Plan, develop, coordinate, and direct engineering projects or activities, with responsibility for interpreting, organizing, executing, and coordinating assignments.
  • Perform tasks requiring original concepts and a high level of experience and expertise.
  • Provide expertise and leadership for the completion of assigned projects.
  • Lead teams or small groups with special expertise in a particular field or discipline.
  • Perform other job-related duties as assigned.

Desired Qualifications

  • Engineering degree or technical degree in a related technical area.
  • At least 8 years of SCADA, controls, power systems, or battery energy storage system engineering experience, including technical leadership or people-management responsibilities.
  • Ability to travel domestically and internationally less than 10%.
  • Engineer-in-Training or Professional Engineer credential.
  • Master's degree.

About the Company

NextEra Energy

Runs a Florida utility and builds wind and solar farms

NextEra Energy owns Florida Power & Light, the regulated utility that supplies electricity to much of Florida, and NextEra Energy Resources, which builds and runs wind, solar, battery storage and nuclear plants across the United States. The company calls itself the world's largest generator of renewable energy from the wind and sun. FPL earns returns set by Florida regulators on the power plants and grid lines it builds, while Energy Resources sells power to utilities, technology companies and other large buyers under long-term contracts. NextEra Energy was formed in 1984 as the holding company for Florida Power & Light, which dates to 1925, and is based in Juno Beach, Florida.

Company size
10,001+
Company stage
IPO
Headquarters
Juno Beach, FL
Founded
1984

Recently Posted Jobs

Explore more opportunities at NextEra Energy

See more jobs