S

Stantec

Global design and engineering consulting services

Senior Project Manager/Technical Lead - Conveyance

Full-TimeUpdated on 10/23/2026
$128.6k - $227.6k/yr
Expert
Bachelor's
Boston, MA, USA+9 moreMore locations: Providence, RI, USA | Amherst, MA, USA | South Burlington, VT, USA | Northampton, MA, USA | Hingham, MA, USA | Hartford, CT, USA | Auburn, NH, USA | Portland, ME, USA | Burlington, MA, USA
HybridHybrid schedule averages three days per week in the office; travel to other offices and project sites may be required.
Architecture & Civil EngineeringWater Resources Engineering

About the job

Requirements
  • Ability to coordinate with other engineering disciplines, including stress/structural, instrumentation and controls, and electrical engineering.
  • Understanding of local and regional jurisdictional codes, legal requirements, and design requirements in relevant jurisdictions.
  • Strong ability to read and interpret 2D and 3D computer-aided design drawings.
  • Understanding of conveyance system construction elements as they relate to design, including selecting construction methods and defining work-area limits.
  • Experience and expertise designing conveyance projects in urbanized, congested areas.
  • Experience designing water, sewer, and drainage infrastructure 24 inches in diameter and larger.
  • Minimum 15 years of project management experience in a consulting environment, focused on conveyance and water infrastructure design.
  • Minimum bachelor's degree in environmental engineering, civil engineering, or a related field from an accredited university.
  • Licensed Professional Engineer or ability to obtain licensure within six months.
  • Travel to other offices and project sites may be required.
Responsibilities
  • Lead planning, design, and delivery of urban storm drain, combined and sanitary sewer, and drinking water conveyance projects, principally for municipal clients across New England.
  • Lead conveyance projects from initial request through construction, shape the local team and North American Conveyance Sector, and identify, develop, pursue, and win projects with new and existing clients.
  • Lead execution and delivery of technically complex conveyance projects and collaborate with research and innovation teams to develop and deploy innovative technologies.
  • Manage a team of design professionals and technicians; mentor and supervise staff and develop high-performing project teams.
  • Perform business development tasks and collaborate with staff to increase project wins and develop long-lasting client relationships.
  • Participate in business-line teams to manage and develop proposals; conduct client-facing business-development contacts, meetings, site walk-downs, and presentations; prepare scopes of work and estimates; collaborate across business lines to develop opportunities; and conduct quality reviews.
  • Assist senior engineers and designers with developing and managing project scope, budget, staffing, and schedule.
  • Perform complex engineering design tasks on assigned projects in collaboration with a wide range of technical disciplines.
  • Perform engineering calculations, including pressure and open-channel flow hydraulics; analyze utility layouts and trench conditions spatially; size and select equipment for active and passive controls; prepare civil site plans, utility profiles, hydraulic structure layouts, piping assemblies, engineering reports, feasibility studies, and client, regulatory-agency, and stakeholder presentations.
  • Assist with managing project design and construction.
  • Establish goals and objectives for unique and complex projects.
  • Implement project plans to meet budget, schedule, and contractual obligations.
  • Conduct or coordinate quality assurance and quality control on assigned projects and facilitate independent technical reviews.
  • Participate in project permitting, including meetings with clients, contractors, stakeholders, and reviewing agencies; coordinate regulatory review to seek final approval.
  • Deliver projects of varying complexity and make decisions within multidisciplinary teams.
  • Research and understand regulatory and other issues that affect individual projects.
  • Assist business leaders with project revenue forecasting.
  • Oversee proposals, including developing scopes and levels of effort for projects of comparable size.
  • Make decisions and recommendations under general policy and project-management governance.
  • Supervise local staff, mentor and coach future leaders, and develop succession plans for key positions.
  • Engage employees in discussions about job satisfaction and engagement, and provide ongoing recognition and feedback to employees and teams.
Desired Qualifications
  • Understanding of construction methods for sewer and water infrastructure, such as open-cut and trenchless methods including microtunneling, jack and bore.
  • Understanding of water, storm, and sanitary sewer rehabilitation.
  • Project Management Professional certification.

About the company

Stantec is a global design and consulting firm that delivers professional services in multiple sectors, including buildings, energy and resources, environmental services, infrastructure, and water. It helps municipalities, governments, and private clients plan, design, engineer, and manage projects by offering planning, architecture, engineering, environmental, and project management services for a fee. The company differentiates itself through its global reach and multi-disciplinary teams that provide integrated solutions across many sectors, enabling end-to-end project delivery. Its goal is to help clients design and implement infrastructure, facilities, and environmental solutions that meet their objectives, operate efficiently, and serve communities over the long term.

Company Size

10,001+

Company Stage

IPO

Headquarters

Edmonton, Canada

Founded

1954

Get referred to Stantec

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • October 2, 2026 SFPUC awarded Stantec a seven-year environmental services contract.
  • September 18, 2026 Kari Shively took over North American Water, a C$970 million business.
  • Second-quarter 2026 revenue grew 13.4%, and adjusted EBITDA margin expanded to 18.7%.

What critics are saying

  • The July 7, 2025 DOJ settlement exposed procurement controls across Stantec's EPA-related business.
  • Clearwater's 2026 breach-of-contract case keeps design-liability risk alive around public infrastructure projects.
  • Persistent engineer shortages can choke delivery; losing senior water leaders would cripple C$970 million targets.

What makes Stantec unique

  • Stantec spans water, buildings, energy, and environmental services across 1954-founded global teams.
  • Its July 31, 2026 Niche acquisition deepens environmental permitting and compliance capabilities in Australia.
  • August 12, 2026 backlog hit C$9.2 billion, giving roughly 13 months visibility.

Help us improve and share your feedback! Did you find this helpful?

Benefits

  • Professional Development Budget
  • Flexible Work Hours

Company News

Yahoo Finance
Oct 24th, 2026
Three undervalued Canadian stocks to watch: Groupe Dynamite, Stantec, Canadian Natural

Simply Wall St has named three Canadian stocks that look undervalued on a discounted cash flow screen, as rising oil prices linked to Middle East conflict risks squeeze corporate costs and consumer budgets. Groupe Dynamite (TSX:GRGD), a women's fashion retailer, has a market cap of CA$6.23b and about CA$1.49b in apparel retail revenue. Stantec (TSX:STN), a design and engineering consultancy, has a market cap of CA$11.5b. Its price-to-earnings ratio of 22.2x sits below an estimated fair multiple of 28.9x. Canadian Natural Resources, a Calgary-based oil and gas producer, has a market cap of CA$155.6b. Its long-life reserves underpin its cash flow.

DirectEmployers Association
Oct 22nd, 2026
Career opportunities in the water sector - Cambridge & the East | expression of Interest.

Career opportunities in the water sector - Cambridge & the East | expression of Interest. Cambridge, GBR Shape the Future of Water in the East - Join Stantec's Cambridge Team! Following our appointment to Anglian Water's Strategic Partnership frameworks, Stantec is at the heart of delivering a multi-billion pound investment program for AMP8. To support this landmark win and our growing pipeline across the region, our Cambridge office is entering an ambitious phase of expansion. We are inviting Expressions of Interest from passionate professionals who want to be part of one of the UK's most significant environmental and infrastructure success stories. From protecting the unique chalk streams of the East to enhancing regional water resilience, your work here will have a direct impact on the communities where you live and work. As a key partner to Anglian Water, Stantec is tackling the biggest challenges facing the East of England: climate change, population growth, and environmental protection. At our Cambridge hub, you'll find a friendly, collaborative culture combined with the opportunity to contribute to nationally significant work. Our teams support the full project lifecycle - from strategy and concept development through to detailed design and delivery - offering varied, technically rewarding careers with real local impact. We are keen to hear from professionals at all levels across the following disciplines: * Civil Engineering * Mechanical & Electrical Engineering * Process Engineering (Water & Wastewater Treatment) * Design Management * Urban Drainage & Hydraulic Modelling * Project & Programme Management * Ecology, Environmental Planning & Environmental Services * Digital Engineering If there isn't a live role that matches your experience today, we want to hear from you anyway! We will keep in touch as new opportunities emerge throughout this exciting AMP8 period. Why Join Stantec's Water Team? Stantec's UK & Ireland Water business is building on a period of unprecedented growth. Our expertise spans the full breadth of the sector - from nature-based solutions and storm overflow mitigation to water reuse and biodiversity enhancement. Joining Stantec means collaborating with industry-leading experts and contributing to projects that matter. If improving water quality and helping deliver a resilient water supply motivates you, Stantec is a place where your career can thrive. * Learn more about our culture and projects at H2O+U. * Hear from the team: See what it's like to work here: My Stantec Stories - Lucy Ashen. Why Join Us in Cambridge and the East? Our Cambridge office is perfectly positioned on Station Road, right in the heart of the city and just a short walk from the station. It serves as a vibrant hub for a collaborative team that thrives on cross-discipline innovation. Working here means delivering schemes with a tangible local legacy. From protecting water quality in our regional rivers to strengthening drought resilience, our team is essential to supporting sustainable growth in one of the UK's most rapidly developing regions. By joining us, you'll benefit from: * Unrivalled Project Pipeline: Secure your future with our long-term frameworks, including a central role in Anglian Water's AMP8 investment program. * A Supportive Environment: A culture that prioritizes your well-being, flexibility, and professional development. * Diverse Project Exposure: Opportunities to work across the full project lifecycle, from initial strategy to detailed design. * Global Backing, Local Feel: Access the resources and reach of a global consultancy, delivered with a "community-first" mindset. Ready to make a splash in the East? Submit your expression of interest today and help us shape the future of water. About Stantec The Stantec community unites more than 34,000 employees working in over 450 locations across 6 continents. We have been working with our clients and communities in the UK for over 150 years. We plan, design, deliver and manage the development and infrastructure needed to support the creation of sustainable, healthy and prosperous communities. Our teams provide effective and relevant solutions, translating our clients' vision into valued consents, deliverable plans for projects and programmes, and efficient designs for delivery, based on technical excellence and deep market insights. We deal with today's challenges, but also keep a fairer, better tomorrow in sight, looking at how we deliver clean growth, support radical changes in our economy and meet the needs of future communities. Stantec provides equal employment opportunities to all qualified employees and applicants for future and current employment and prohibit discrimination on the grounds of race, colour, religion, sex, national origin, age, marital status, genetic information, disability, sexual orientation, gender identity or gender expression. We prohibit discrimination in decisions concerning recruitment, hiring, referral, promotion, compensation, fringe benefits, job training, terminations or any other condition of employment. Stantec is in compliance with laws and regulations and ensures equitable opportunities in all aspects of employment. At Stantec we are committed to ensuring our recruitment process is accessible to all. If you require reasonable adjustments to be made during the recruitment process then please inform a member of our Talent Acquisition team. ReqID: 9580

Yahoo Finance
Oct 18th, 2026
Three undervalued Canadian stocks: Groupe Dynamite, Stantec and Altius Minerals

Simply Wall St has named three Canadian stocks that its cash flow screen suggests trade below the value of their future cash flows. High interest rates are hurting heavily indebted firms, it says, and putting cash-generating companies in focus. Groupe Dynamite (TSX:GRGD), a women's fashion retailer, has a market cap of CA$6.69 billion. It earns about CA$1.49 billion in revenue and is expanding in the US and UK. Stantec (TSX:STN), an engineering and consulting firm, has a market cap of CA$11.01 billion. It earns about CA$7.0 billion in revenue and reports a $7.9 billion backlog. Altius Minerals, a royalty and streaming business, has a market cap of CA$3.32 billion. Its lithium royalty portfolio could benefit from rising battery demand.

Stantec
Oct 15th, 2026
Stantec ranks #7 on enr's 2026 Top 100 Green Design Firms.

Stantec ranks #7 on enr's 2026 Top 100 Green Design Firms. October 15, 2026 In Engineering News-Record, Jill Kurtz shares how building performance data and operational insights help advance sustainability goals, maximize value Stantec ranks #7 on Engineering News-Record's 2026 Top 100 Green Design Firms list, reflecting the firm's continued commitment to sustainable, high-performing buildings. Jill Kurtz, sustainable design leader for Stantec's Building practice, discusses how building performance data and operational insights can help owners advance their sustainability goals while maximizing long-term value. Compressed timelines, tight labor resources, rising costs of materials, and shifting federal policies can mean that sustainability efforts are increasingly based on economic factors, according to Jill. This focus makes it "even more important to ground decisions in building science, operational data, risk reduction, and business value rather than labels or certifications alone." "The future of green building," Jill explains, "will be defined not by what we intend a building to do but by what it actually delivers throughout its lifetime." * Jill is a sustainable design leader with more than 20 years of sustainability experience. She helps clients translate intention into meaningful and measurable impacts. Contact Jill

Informa TechTarget
Oct 12th, 2026
JE Dunn-Alberici JV breaks ground on $3.2B Texas shipyard.

JE Dunn-Alberici JV breaks ground on $3.2B Texas shipyard. The greenfield shipyard under construction for military contractor Saronic is the first in the U.S. since World War II, according to the JV. Published Oct. 12, 2026 The first greenfield shipyard to be built in the U.S. since World War II has broken ground. A joint venture of JE Dunn and Alberici began construction on the initial phases of military contractor Saronic's Port Alpha, an over $3.2 billion shipyard. There, the contractor will manufacture manned, autonomy-capable and autonomous ships, according to an Oct. 6 announcement from the JV. The shipyard, located at the Port of Brownsville in Texas, will spread across an initially 835-acre site, per the announcement. However, Saronic will have the option to expand the shipyard to nearly 4,400 acres, according to a Sept. 30 news release from the firm. The contract features three overlapping phases, according to the JV. The site preparation and infrastructure phases will include grading, ground improvement, drainage, access roads and utility infrastructure. Then, Phase 1 of shipyard development will begin with the initial assembly buildings, material-handling systems and supporting facilities. When complete, the site will encompass all manufacturing facilities, warehousing, permanent waterfront and vessel-launching infrastructure and employee support facilities. JE Dunn and Alberici, which are headquartered in Kansas City, Missouri and St. Louis, respectively, worked with design partners Stantec and KPFF via the progressive design-build delivery method, per the announcement. Together, the team will overlap design, procurement and construction across all three stages, to progress the site's manufacturing capability as the development takes shape. Scott Shelby, vice president at JE Dunn and program leader for the JV, told Construction Dive via email that the approach allows the team to develop and evaluate the design, scope and cost before agreeing to the final construction price. "That collaboration also helps us determine which portions of the work can advance while other requirements are being resolved," Shelby said. "For example, we can plan early structural and waterfront packages while coordinating later equipment installation and supporting infrastructure." This isn't the JV's first time working with Saronic. Alberici announced in 2025 that the team won a $300 million expansion of Saronic's shipyard in Franklin, Louisiana. The contractors topped out the facility in August.