A

Archirodon Group

Builds ports and energy infrastructure

Technical Office Engineer - Civil

Full-TimeUpdated on 10/23/2026
No salary listed
Senior
Bachelor's
Abu Dhabi - United Arab Emirates
In Person
Architecture & Civil EngineeringConstruction Management

About the job

Requirements
  • A bachelor’s degree in Civil Engineering or equivalent.
  • At least 5 years of experience in EPC Oil & Gas projects in the UAE.
  • ADNOC project experience is mandatory.
  • Strong knowledge of AutoCAD, Excel, and engineering documentation systems.
  • Experience with shop drawings, quantity take-off, and technical office coordination.
  • Strong understanding of civil construction methods, including earthworks, concrete, and infrastructure works.
  • Ability to work under pressure and meet strict deadlines.
  • Good communication and coordination skills.
  • Strong interpersonal skills, attention to detail, analytical thinking, problem-solving techniques, and report-writing skills.
Responsibilities
  • Prepare, review, and submit shop drawings, as-built drawings, and technical submittals in line with project requirements.
  • Perform quantity take-off and assist with cost estimation and variation orders.
  • Coordinate with site engineers, project managers, consultants, and clients to resolve technical issues.
  • Ensure civil works comply with ADNOC standards, project specifications, and IFC drawings.
  • Prepare method statements, material submittals, and technical documentation.
  • Monitor project progress and support the planning team with technical inputs.
  • Maintain documentation control and ensure revisions are updated.
  • Assist with progress reports, requests for information, and technical correspondence.
  • Support the procurement team with technical evaluation of materials and subcontractor submissions.
  • Ensure timely resolution of design clashes and site coordination issues.
Desired Qualifications
  • Previous experience working on several projects at the same time.

About the company

Archirodon Group builds ports, bridges, oil and gas facilities, and other large infrastructure, mostly in the Middle East, Africa, and Europe. Its past projects include Jebel Ali Terminal 2 in Dubai and Khalifa Port in Abu Dhabi, and its work spans marine construction, energy projects, government infrastructure, dredging and pipe laying. National oil companies in Abu Dhabi and Kuwait are among the clients that pay it to run whole projects, from engineering the design and buying materials and equipment to construction, commissioning and operation. Two Greek firms founded Archirodon in 1959, and the group is headquartered in Dordrecht, Netherlands, with a major presence in Athens.

Company Size

10,001+

Company Stage

N/A

Total Funding

N/A

Headquarters

N/A

Founded

1959

Get referred to Archirodon Group

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • Archirodon's October 2025 Kuwait award added a KD160 million oil-pier contract to its construction workload.
  • Archirodon says most teams have worked together for more than ten years, providing established colleagues to learn from.
  • Archirodon reports $4 billion in active projects, a substantial base of contracted work.

What critics are saying

  • Hyundai's March 2026 disclosure confirmed NEOM had terminated Archirodon's tunnel venture after a client-led project reorganisation.
  • Archirodon's consortium withdrew from Albania's port tender in March 2026, citing rising international construction costs, according to the minister.
  • Archirodon's fabrication managers face client audits, verify steel-and-pipe testing before dispatch, and submit weekly and monthly progress reports.

What makes Archirodon Group unique

  • Archirodon owns over 5,000 equipment units, including 300 for marine and diving work and 20 for dredging.
  • Archirodon invests project equity and arranges financing without recourse to investors' balance sheets, alongside construction delivery.
  • Archirodon's Saudi power-and-water experience includes Shoaiba's 15-year construction programme covering electricity generation and desalination.

Help us improve and share your feedback! Did you find this helpful?

Benefits

  • Relocation Assistance

Company News

Tunnels & Tunnelling
Mar 18th, 2026
Neom cancels The Line tunnels contracts.

Neom cancels The Line tunnels contracts. The 170km-long linear city is being redesigned as data centres. Neom has cancelled the contracts related to the construction of the tunnel sections of The Line in north-west Saudi Arabia, T&TI's sister publication, MEED, reports. In a stock exchange announcement filed on March 13, South Korean contractor Hyundai E&C said that Neom cancelled its contract on December 29 last year. Hyundai E&C was executing the drill-and-blast section of The Line's tunnels in a joint venture with Greece's Archirodon and South Korean counterpart Samsung C&T. The firm said its share of the joint venture was about 35%, amounting to $483m. Neom awarded contracts for constructing the mountain tunnel sections of The Line in June 2022. The drill-and-blast works were split into four packages, with two contracting teams winning two packages each. The other joint-venture team comprised Spain's FCC, the local Shibh Al-Jazira Contracting Company (Sajco) and Beijing-based China State Construction Engineering Corporation. The tunnels formed part of the infrastructure backbone of Neom's 170km The Line development, launched in January 2021. What began as Crown Prince Mohammed Bin Salman's defining symbol of a post-oil Saudi Arabia unravelled with quiet finality over roughly two years. By April 2024, planners were reportedly being forced to cut the initial phase to just 2.4km by 2030. By July last year, with the sovereign wealth fund facing tightening liquidity, the kingdom was reported to have conducted a "strategic review" to determine whether The Line was feasible - a process described as a "recalibration" of Vision 2030. Resources are now being directed to projects essential for the Fifa World Cup 2034, Expo 2030, and critical housing, healthcare and education targets. According to media reports, the government has pivoted towards repositioning what remains of Neom as an industrial and data centre hub, leveraging the Red Sea coastline's access to seawater cooling for AI infrastructure. This news article was first reported by T&TI's sister publication, MEED. Give your business an edge with its leading industry insights.