O

Orenda

Develops and deploys battery storage systems.

Electrical Engineer - Interconnection

Full-TimeUpdated on 10/20/2026
$100k - $200k/yr+ Annual performance-based bonus + 3% 401(k) employer match + Monthly commuter stipend + Learning and education stipend
Mid, Senior
Bachelor's
New York, NY, USA
In PersonFive days per week in-office, with regular travel to project sites within the NYC area.
Electrical EngineeringPower Systems Engineering

About the job

Requirements
  • An ABET-accredited Bachelor's degree in Electrical Engineering is required.
  • Four to eight years of experience in utility distribution planning or interconnection is required.
  • Deep knowledge of IEEE 1547, SIR processes, and hosting capacity constraints is required.
  • Familiarity with high-tension distribution systems is required.
  • Experience working with utilities is required.
  • A strong foundation in power engineering principles is required.
  • Proficiency in AutoCAD, or willingness to learn it, is required.
  • Competence with GIS platforms and tools is required.
  • Strong organizational skills are required to manage multiple projects simultaneously.
  • Strong interpersonal skills are required to foster collaboration, drive negotiations, and maintain relationships with diverse stakeholders.
  • The ability to work autonomously, make informed decisions, and adapt to evolving project demands is required.
  • The ability to develop and interpret complex regression models for trend analysis is required.
  • A deep understanding of generation, transmission, and distribution systems is required.
Responsibilities
  • Use AutoCAD to create and modify site layouts, single-line diagrams, and electrical plans.
  • Perform conduit fill calculations and determine medium-voltage conductor ampacity ratings.
  • Iterate on low-voltage and medium-voltage equipment and application selections, ensuring compliance with industry standards and utility requirements.
  • Translate configurations involving power conversion systems, battery energy storage systems, switchgear, and electric vehicle supply equipment into clear spatial and electrical drawings.
  • Ensure drawings align with application data, including ratings, labels, and topology.
  • Revise drawings in response to utility feedback or evolving project constraints.
  • Analyze the interconnection queue and conduct competitive analysis.
  • Perform preliminary hosting capacity analysis to determine the number of projects at a site and their initial viability probability.
  • Develop, implement, and interpret regression models to analyze trends and predict electrical interconnection outcomes.
  • Manage the lifecycle of hundreds of concurrent projects and ensure milestones are met on time.
  • Develop an understanding of distributed energy resource projects from site evaluation and land prospecting through supervisory control and data acquisition integration and operational readiness.
  • Identify cost-saving opportunities through scope de-duplication and shared infrastructure strategies.
  • Collaborate with utilities and regulatory bodies, with attention to Con Edison interconnection standards and high-tension distribution systems.
  • Maintain working relationships with utility stakeholders, respond rapidly to comments, and resolve or escalate open items to minimize cycle time.
  • Translate utility feedback and study results into clear internal decisions, risks, and next steps.
  • Lead technical requests for information and meetings with utility engineers to understand and challenge assumptions and optimize interconnection upgrade cost estimates.
Desired Qualifications
  • Experience with distributed energy resource technologies.
  • Familiarity with the Con Edison distribution system.
  • Experience performing SCCAF studies in ETAP.
  • An Engineer-in-Training or Professional Engineer license.
  • An advanced technical degree.

About the company

Orenda Power designs and delivers battery storage systems for residential and commercial use to store energy from renewables and other sources. The systems use smart software to manage charging and discharging, helping stabilize grids and ensure reliable power. It differentiates itself with a global deployment model paired with local development across 11 locations, supported by a team of 50 engineers and a track record of 35 million deployments and 100,000 customers, along with advisory services and partnerships. Its goal is to provide dependable clean energy at scale by delivering proven storage technology and comprehensive support to help customers integrate storage into their energy systems.

Company Size

1-10

Company Stage

N/A

Total Funding

$1.5M

Headquarters

New York City, New York

Founded

N/A

Get referred to Orenda

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • Orenda's July 15, 2026 Ultra Capital raise funds New York City expansion.
  • Its 176 active CESIR applications total 870 MWac and 3,480 MWh, showing real traction.
  • North Sky previously committed $42.5 million, signaling repeated capital access since 2024.

What critics are saying

  • Con Edison filed August 2026 comments showing one Orenda project's costs jumped 5,500%.
  • NYC interconnection reform remains unresolved, delaying projects and crushing economics into 2027.
  • If interconnection queues stay broken, Orenda's 920 MW pipeline becomes stranded paper.

What makes Orenda unique

  • Orenda controls 34% NYC market share in active ≤5 MW BESS interconnection applications, 2026.
  • It pairs development with proprietary asset-management software across 920 MW and 2.7 GWh pipeline.
  • Ultra Capital joined in July 2026, validating Orenda's dense-urban storage specialization.

Help us improve and share your feedback! Did you find this helpful?

Benefits

  • Phone/Internet Stipend
  • Wellness Program
  • Professional Development Budget
  • Unlimited Paid Time Off

Company News

Orenda
Jul 15th, 2026
Orenda closes growth equity investment from Ultra Capital.

Orenda closes growth equity investment from Ultra Capital. Investment to expand distributed battery storage in New York. New York, NY, July 15, 2026 - Orenda, a New York-based renewable energy developer, today announced the closing of a growth equity investment from Ultra Capital, an investment firm focused on sustainable infrastructure and energy transition. The investment will support Orenda's strategy to scale the deployment of distributed battery storage across New York City and the downstate region. New York City's grid is strained. High demand, limited transmission, and constrained generation have raised power prices, blocked new load, and left little reserve margin during peak demand or outages. Orenda's distributed battery storage addresses this directly, adding reliability and flexibility to the grid while lowering costs across the system. With strong state and city policy behind clean energy and grid resilience, New York City is one of the most attractive battery storage markets in the country right now. "Grid infrastructure is aging, energy costs are rising, and battery manufacturing is ramping up fast across the country. Those forces are converging right now," said Bill Grinstead, Chief Executive Officer of Orenda. "Ultra Capital brings deep experience in energy infrastructure and a track record of scaling operating platforms. This investment lets us expand the capabilities of our team and move faster to bring battery storage online across New York City." In conjunction with its investment, Mike Reynolds, Partner at Ultra Capital, has joined Orenda's Board of Directors. "Orenda has assembled a highly experienced team with a strong track record in project development, execution, and navigating complex urban power markets," said Reynolds. "The company's growing pipeline and disciplined approach position it to establish market-leading intellectual property in distributed battery storage. We believe Orenda is uniquely positioned to build and scale a best-in-class platform for deploying batteries at the distribution level in urban environments, and we are excited to support the team's next phase of growth." About Orenda Orenda develops, builds, owns, and operates battery energy storage projects in dense urban environments, with a development pipeline of 920 MW and 2.7 GWh across Downstate New York. Founded in 2020, the company pairs this infrastructure with proprietary asset management technology to close the gap between renewable generation and electricity demand. Orenda's mission is to make the grid more resilient and sustainable in Downstate New York. About Ultra Capital Ultra Capital provides equity capital to best-in-class management teams focused on the energy transition. Orenda invest growth equity and asset capital in companies with a successful track record of deploying demonstrated solutions in various sectors including solar, battery storage, distributed generation, EV charging, and fleet electrification. Orenda bring value to its partnerships through its experience as former developers, constructors, operators, and financiers of infrastructure assets.