Inactive
N

NextEra Energy

Runs a Florida utility and builds wind and solar farms

Nuclear Engineer 2 - Civil / Structural

Structural EngineeringPosted on Aug 6
Full-timePalo, IA, USANo salary listed

About the Job

Requirements

  • Bachelor's degree in Engineering from an ABET-accredited program.
  • At least 2 years of experience.
  • No prior nuclear experience is required.

Responsibilities

  • Contribute to plant restoration, system recommissioning, and operational readiness by applying structural engineering principles.
  • Support preparation of design change products, including engineering analyses, technical evaluations, and documentation, in accordance with established nuclear engineering processes.
  • Assist with project implementation, field support, and turnover activities.
  • Support vendor engineering coordination.
  • Apply applicable codes, standards, and regulatory requirements in engineering work.
  • Perform engineering and analytical tasks to develop reliable, cost-effective recommendations.
  • Use advanced computer models to develop and study solution feasibility.
  • Prepare engineering documentation and assist with technical support for licensing and other regulatory proceedings.
  • Ensure procured materials and services meet engineering specifications.
  • Perform other job-related duties as assigned.

Desired Qualifications

  • Familiarity with the industry standard design process (SDP), 10 CFR 50.59, or related nuclear industry experience.

About the Company

NextEra Energy

Runs a Florida utility and builds wind and solar farms

NextEra Energy owns Florida Power & Light, the regulated utility that supplies electricity to much of Florida, and NextEra Energy Resources, which builds and runs wind, solar, battery storage and nuclear plants across the United States. The company calls itself the world's largest generator of renewable energy from the wind and sun. FPL earns returns set by Florida regulators on the power plants and grid lines it builds, while Energy Resources sells power to utilities, technology companies and other large buyers under long-term contracts. NextEra Energy was formed in 1984 as the holding company for Florida Power & Light, which dates to 1925, and is based in Juno Beach, Florida.

Company size
10,001+
Company stage
IPO
Headquarters
Juno Beach, FL
Founded
1984

Recently Posted Jobs

Explore more opportunities at NextEra Energy

See more jobs