Full-Time

Senior HVDC Verification & Validation Product Specialist

Updated on 9/3/2026

GE Vernova

GE Vernova

1,001-5,000 employees

Global energy provider: power, wind, electrification

No salary listed

Stafford, UK

In Person

Relocation assistance is provided.

Bachelor's

Category
QA & Testing
Required Skills
Software Testing
Quality Assurance (QA)
JIRA
DevOps

Get referred to GE Vernova

See people who can refer or advise you

Requirements
  • A degree in Electronics or Electrical Engineering or a related field is required.
  • Significant demonstrated experience in power generation, systems design, development, and operation of control systems is required.
  • Demonstrated technical leadership experience is required.
  • Experience with HVDC control systems is required.
  • Competence in HVDC control, protection, and sequencing strategy is required.
  • Competence in PSCAD, MATLAB-SIMULINK, and RTDS applications is required.
  • Competence in HVDC dynamic performance studies is required.
  • Proven technical leadership in a complex systems engineering development environment is required.
  • Knowledge of control and protection cubicle circuit diagrams, field cabling, protection relays, high-voltage, medium-voltage, and low-voltage switchgear, intelligent electronic devices, and distributed control systems is required.
  • Knowledge of test-driven design techniques, including continuous integration, unit testing, and automated regression testing, is required.
  • Knowledge of requirements management is required.
  • Knowledge of change control and issue tracking, including change control boards and Jira, is required.
  • Fluency in English is required.
Responsibilities
  • Provide strategic and tactical direction for verification and validation of HVDC control and protection systems in collaboration with Grid and HVDC technology groups.
  • Establish processes to assess, review, and record the testing needs and boundaries of each project so that the control system is verified to the maximum extent possible before leaving the factory.
  • Lead the generation of plans, procedures, and specifications for development of integration system tests, full system tests, factory acceptance tests, and commissioning tests at site.
  • Develop, maintain, and prepare test management plans and solutions.
  • Participate from the requirements phase to ensure requirements are SMART and testable.
  • Coordinate HVDC testing and validation process steps from lab testing through factory system testing and site system testing to customer acceptance of the HVDC control and protection system.
  • Maintain an overview of HVDC NTI, NPI, and project life cycles to de-risk product development by defining testing needs to validate requirements.
  • Perform technical validation of processes and test specifications.
  • Drive the continuous improvement process in collaboration with other HVDC control and protection engineering teams.
  • Ensure sufficient de-risking is included in product plans to avoid quality problems caused by introducing new technologies into projects.
  • Enforce engineering discipline, established processes, company policies, quality procedures, and work instructions through activities such as training and technical reviews.
  • Review the verification and validation department's skills, identify shortfalls and skills gaps, and ensure necessary training, guidance, and mentoring of engineers are in place.
  • Serve as approver for technical reviews, quality gates, and project milestones.
  • Support the new technology intellectual property strategy by identifying opportunities for new intellectual property development.
  • Support customer communications to define project quality and testing expectations from project kick-off through final sign-off.
  • Represent the organization in industry working groups as a key content contributor.
Desired Qualifications
  • Ability to understand and communicate customer requirements, own technical discussions with customers, and develop client relationships.
  • Advanced oral and written communication skills.
  • Exceptional interpersonal and leadership skills.
  • Ability to analyze and resolve problems.
  • Demonstrated ability to lead programs and projects.
  • Ability to document, plan, market, and execute programs.
  • Established project management skills.
  • Experience proactively serving on cross-functional leadership teams and making decisions independently.
  • Experience with tools such as Mathcad, EMTP-RV, and DIgSILENT is an advantage.

GE Vernova is a global energy company created in 2024 to support the electricity grid and the energy transition, with three focuses: Power, Wind, and Electrification. It sells large-scale equipment, signs long-term service agreements, and provides software to utilities, independent power producers, grid operators, and large industrial energy users. Its products include H-Class gas turbines that can burn natural gas with blends of hydrogen toward 100% hydrogen, Haliade-X offshore wind turbines up to 14.7 MW, and GridOS software that unifies grid data to help manage networks and integrate renewables. By combining hardware, services, and software under GE heritage, it aims to meet rising electricity demand while accelerating decarbonization across global energy systems.

Company Size

1,001-5,000

Company Stage

N/A

Total Funding

$17.6M

Headquarters

Cambridge, Massachusetts

Founded

2022

Get referred to GE Vernova

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • Q2 2026 orders rose 88% to $24.2 billion, led by Power and Electrification.
  • Backlog hit $176 billion in July 2026, with gas equipment expected to reach 125 GW.
  • August 2026 JV with LS Electric expands GE Vernova in Korea's HVDC market.

What critics are saying

  • Vineyard Wind sued GE Vernova in April 2026; blade failures damaged offshore credibility.
  • Wind execution remains fragile after the 2024 blade break and court-ordered project continuation.
  • If gas-turbine production slips below 20 GW in 2026, backlog monetization stalls.

What makes GE Vernova unique

  • GE Vernova controls Power, Wind, and Electrification across generation and grids worldwide.
  • Its gas turbine backlog reached 116 GW in Q2 2026, supporting long-duration demand.
  • GridOS, HVDC, and gas turbines position GE Vernova for AI-driven electrification buildouts.

Help us improve and share your feedback! Did you find this helpful?

Benefits

Health Insurance

Dental Insurance

Vision Insurance

Life Insurance

Disability Insurance

401(k) Retirement Plan

401(k) Company Match

Paid Vacation

Paid Parental Leave

Mental Health Support

Relocation Assistance

Performance Bonus

Company News

Yahoo Finance
Sep 10th, 2026
Big Tech burns $13.5B as AI buildout sends Treasury yields to 4.79%

US Treasury yields near 4.79% reflect strong corporate borrowing for AI investments rather than economic weakness, according to analysts Joel Litman and Rob Spivey. They argue that context matters more than absolute rate levels. Companies borrowing at 5% to fund projects returning 30-40% benefit from current rates, whilst those earning less than borrowing costs face pressure. The analysts note that AI-related corporate debt issuance reached roughly $1.5 trillion this year, driving yields higher. Alphabet posted its first negative free cash flow since 2004, burning $5.9 billion in Q2 as capital expenditure hit $44.9 billion. Amazon swung to negative $7.6 billion on a trailing basis. However, negative cash flow can signal productive investment rather than distress, the analysts suggest.

Yahoo Finance
Sep 4th, 2026
GE Vernova and Quanta Services poised to weather market crash with strong backlogs and AI-driven growth

GE Vernova and Quanta Services are positioned as resilient stocks that could withstand market volatility, according to a new analysis. Both companies are benefiting from surging demand for electrical infrastructure driven by AI and data centre expansion. GE Vernova, spun off from General Electric in 2024, has seen its stock rise more than sixfold since debut. The company's backlog expanded 37% year over year to $176.3 billion at the end of Q2 2026, nearly four times its projected annual revenue of $46.2 billion. Quanta Services, an energy infrastructure builder, reported a backlog of $53.4 billion in Q2 2026, up 49% year over year. The company's revenue is projected to grow 39% in 2026. Analysts expect GE Vernova's revenue and adjusted EBITDA to grow at compound annual growth rates of 17% and 60% respectively from 2025 to 2028.

Fortune
Sep 1st, 2026
GE Vernova hires Rivian CFO Claire McDonough, leaving EV maker without clear successor

GE Vernova has hired Claire McDonough as CFO, effective 1 January, leaving electric vehicle maker Rivian to find her successor. McDonough joined Rivian in January 2021 and helped take the company public through a $13.7 billion IPO that November. She also negotiated Rivian's technology joint venture with Volkswagen, which agreed to invest up to $5.8 billion. Rivian shares fell more than 6% following the announcement, whilst GE Vernova shares declined about 3%. Analysts cited Rivian's lack of a clear succession plan as a factor weighing on its shares. Derek Mulvey, Rivian's VP of finance, is expected to serve as interim CFO after McDonough's departure. McDonough will join GE Vernova in November, succeeding Kenneth Parks, who is retiring.

Yahoo Finance
Aug 31st, 2026
SpaceX builds turbine foundry to break AI power bottleneck, cut GE Vernova wait times by 18 months

Elon Musk's SpaceX is building a foundry in Bastrop, Texas, to manufacture blades and vanes for industrial gas turbines, according to The Information. Musk confirmed the move on X, saying in-house casting could accelerate natural gas turbines coming online by up to 18 months. The initiative targets the same supply chain bottleneck GE Vernova has flagged to investors. GE Vernova CEO Scott Strazik said the company pushed suppliers to add capacity in 2024, sometimes providing capital for new furnaces. GE is mostly sold out through 2030 and aims to increase annual turbine production from 20 gigawatts this year to 30 GW by decade's end. SpaceX has committed over $2.8 billion to gas turbines over three years to support its Colossus data centres near Memphis. The move addresses growing power demand from AI infrastructure expansion.

Yahoo Finance
Aug 29th, 2026
GE Vernova and LS Electric form JV to target South Korea's HVDC market

GE Vernova has formed a joint venture with LS Electric to strengthen its position in the high-voltage direct current sector. Announced at the CIGRE 2026 event in Paris, the partnership will focus on South Korea's voltage source converter-based HVDC projects, which are crucial for transmitting renewable energy from the southwestern region to greater Seoul. The venture combines GE Vernova's VSC-HVDC technology with LS Electric's local capabilities and market presence. The companies also plan to pursue HVDC opportunities in other global markets. The move aligns with GE Vernova's strategy to capitalise on growing power infrastructure demand. During Q2, the company's Power orders jumped 135% year-over-year, whilst Electrification revenue grew 68%. However, the joint venture faces execution risks and may take time to generate meaningful revenue.