Full-Time

Electrical Engineer

Development

Orenda

Orenda

1-10 employees

Develops and deploys battery storage systems.

Compensation Overview

$120k - $170k/yr

+ Bonus

New York, NY, USA

In Person

In-office at Brooklyn headquarters; regular travel to NYC-area project sites.

Bachelor's

Category
Electrical Engineering
Required Skills
Communications

Get referred to Orenda

See people who can refer or advise you

Requirements
  • Education: Bachelor’s degree in Electrical Engineering (preferred) or a related field (or equivalent experience).
  • Experience: 5+ years in electrical engineering supporting complex projects (energy, utility, industrial, EPC, or comparable).
  • Electrical codes: Working knowledge of applicable electrical codes and standards (e.g., NEC and relevant local/amendment requirements) and ability to apply them across design development, permitting packages, and field-driven clarifications.
  • Electrical equipment fluency: Comfortable reviewing MV electrical equipment and related interfaces (protection/controls, metering CT/PT, grounding/bonding, communications, commissioning support) and spotting scope/interface risk early.
  • RFI discipline: Proven ability to run structured RFI / technical clarification cycles (comment logs, turnaround targets, closure tracking) with auditable traceability of assumptions and approvals.
  • Rigor + ownership: Low tolerance for ambiguous scope, undocumented commitments, or drifting baselines; uses logs, timestamps, and explicit assumptions to keep teams aligned.
  • Cross-functional execution: Comfortable operating across Construction, Pre-construction, Procurement, Finance, and Legal without overstepping authority.
  • Communication: Strong writing and exec-ready communication skills (clear issue statements, options, and recommendations).
  • Tools: Comfortable adopting engineering/procurement workflows in systems like Kahua, Procore, Bluebeam/PlanGrid, BIM 360, or similar.
Responsibilities
  • Design Standards + Milestone QA/QC: Review EOR design packages at 30%/60%/90%/IFC against Orenda Site Design Specifications (single-lines, layouts, grounding/bonding, labeling, key interfaces). Issue crisp comment logs, run closure to zero, and prevent downstream rework.
  • Constructability + Field Feedback Loop: Participate in constructability reviews (typically 60% and 90%). Capture recurring field issues and design clarifications and convert them into durable standards updates with the Principal Engineer.
  • RFIs + Design-Change Triage: Own intake, triage, and coordination of technical RFIs and submittals that involve (or may trigger) a design change. Maintain an auditable RFI/comment log with timestamps, assumptions, and approvals; coordinate responses with the EOR + Principal Engineer for fast, clean closure.
  • Vendor Clarifications + Submittal Reviews: Sanity-check vendor submittals (switchgear, transformers, protection/controls, metering CT/PT, communications) for interface completeness and spec alignment. Run clarification cycles to closure and keep every decision traceable to the design baseline.
  • Interface Management: Coordinate electrical interfaces across BESS/PCS/MV gear, metering, protection, SCADA/EMS, and fire/life safety — surface integration risk early, before it becomes field pain.
  • Decision Packages + Document Control: Produce decision-grade redlines/memos. Maintain clean baselines, revision history, and closure evidence so scope doesn’t change silently.
  • Cross-Functional Coordination: Keep Development PMs, Preconstruction, Procurement, and Construction aligned to schedule + readiness needs; escalate crisply with issue statement, impact, options, and a recommendation.
Desired Qualifications
  • BESS / PCS / protection schemes experience (battery OEM, PCS, switchgear/protection, communications).
  • Cross-functional design experience coordinating with civil, structural, and architectural disciplines.
  • NYC / dense-urban delivery constraints experience (tight delivery windows, rigging constraints, AHJ/utility interface).
  • Experience working with EORs and driving comment-resolution cycles on accelerated schedules.

Orenda Power designs and delivers battery storage systems for residential and commercial use to store energy from renewables and other sources. The systems use smart software to manage charging and discharging, helping stabilize grids and ensure reliable power. It differentiates itself with a global deployment model paired with local development across 11 locations, supported by a team of 50 engineers and a track record of 35 million deployments and 100,000 customers, along with advisory services and partnerships. Its goal is to provide dependable clean energy at scale by delivering proven storage technology and comprehensive support to help customers integrate storage into their energy systems.

Company Size

1-10

Company Stage

N/A

Total Funding

$1.5M

Headquarters

New York City, New York

Founded

N/A

Get referred to Orenda

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • Ultra Capital's July 2026 investment finances faster NYC deployment and team expansion.
  • NYC reliability deficits through 2036 create urgent demand for distributed storage solutions.
  • Orenda's 2026 pipeline of 920 MW and 2.7 GWh signals large near-term project volume.

What critics are saying

  • Con Edison's August 2025 two-part test inflated upgrade costs from millions to tens of millions.
  • Orenda's 250 MW pre-August queue faces stranded economics unless PSC reverses Con Edison soon.
  • Execution depends on New York City approvals; a prolonged queue freeze kills the 920 MW pipeline.

What makes Orenda unique

  • Orenda leads Con Edison SIR queue with 176 active applications and 33% capacity.
  • Its 2026 Ultra Capital round added board support for dense-urban battery execution.
  • North Sky backed over 40 sites and 200 MW, validating downstate New York focus.

Help us improve and share your feedback! Did you find this helpful?

Benefits

Phone/Internet Stipend

Wellness Program

Professional Development Budget

Unlimited Paid Time Off

Company News

Orenda
Jul 15th, 2026
Orenda closes growth equity investment from Ultra Capital.

Orenda closes growth equity investment from Ultra Capital. Investment to expand distributed battery storage in New York. New York, NY, July 15, 2026 - Orenda, a New York-based renewable energy developer, today announced the closing of a growth equity investment from Ultra Capital, an investment firm focused on sustainable infrastructure and energy transition. The investment will support Orenda's strategy to scale the deployment of distributed battery storage across New York City and the downstate region. New York City's grid is strained. High demand, limited transmission, and constrained generation have raised power prices, blocked new load, and left little reserve margin during peak demand or outages. Orenda's distributed battery storage addresses this directly, adding reliability and flexibility to the grid while lowering costs across the system. With strong state and city policy behind clean energy and grid resilience, New York City is one of the most attractive battery storage markets in the country right now. "Grid infrastructure is aging, energy costs are rising, and battery manufacturing is ramping up fast across the country. Those forces are converging right now," said Bill Grinstead, Chief Executive Officer of Orenda. "Ultra Capital brings deep experience in energy infrastructure and a track record of scaling operating platforms. This investment lets us expand the capabilities of our team and move faster to bring battery storage online across New York City." In conjunction with its investment, Mike Reynolds, Partner at Ultra Capital, has joined Orenda's Board of Directors. "Orenda has assembled a highly experienced team with a strong track record in project development, execution, and navigating complex urban power markets," said Reynolds. "The company's growing pipeline and disciplined approach position it to establish market-leading intellectual property in distributed battery storage. We believe Orenda is uniquely positioned to build and scale a best-in-class platform for deploying batteries at the distribution level in urban environments, and we are excited to support the team's next phase of growth." About Orenda Orenda develops, builds, owns, and operates battery energy storage projects in dense urban environments, with a development pipeline of 920 MW and 2.7 GWh across Downstate New York. Founded in 2020, the company pairs this infrastructure with proprietary asset management technology to close the gap between renewable generation and electricity demand. Orenda's mission is to make the grid more resilient and sustainable in Downstate New York. About Ultra Capital Ultra Capital provides equity capital to best-in-class management teams focused on the energy transition. Orenda invest growth equity and asset capital in companies with a successful track record of deploying demonstrated solutions in various sectors including solar, battery storage, distributed generation, EV charging, and fleet electrification. Orenda bring value to its partnerships through its experience as former developers, constructors, operators, and financiers of infrastructure assets.