I

Iberdrola Group

Global utility generating renewable energy

Lead Engineer - Energy Control Systems

Full-TimeUpdated on 10/23/2026Deadline 10/31/26
$116.6k - $145.8k+ Performance-based bonuses + 12% 401(k) match
Senior
Bachelor's, Master's
Vestal, NY, USA
In PersonOn site in Vestal, NY five days a week.
Electrical EngineeringControls & Automation Engineering
Company Does Not Provide H1B Sponsorship

About the job

Requirements
  • Knowledge and understanding of gas transmission and distribution systems.
  • Understanding of energy flow, gas circuit analysis, contingency analysis, state estimation, and billing.
  • Experience configuring, commissioning, and testing remote terminal units (RTUs), including field-testing methodology and developing test plans.
  • Ability to interpret control system architecture drawings, P&IDs, electrical control and loop diagrams, and engineering specifications.
  • Understanding of relevant compliance regulations and policies, including NERC-CIP and 49 CFR Part 192.631 Control Room Management requirements.
  • Working understanding of NERC-CIP ECS requirements.
  • Understanding of databases, including Microsoft SQL and Oracle, and ability to query, configure, and edit them.
  • Understanding of networking, security, computer hardware, software applications, data communication equipment, network diagrams, firewall rules, ports, and services.
  • Ability to make sound decisions under pressure and work outside normal hours, including storm or emergency conditions for 24x7x365 system support.
  • Ability to work independently and contribute proactively to achieve results.
  • Ability to develop business cases for system enhancements.
  • Ability to educate, assign tasks, direct other engineers, and review less experienced engineers' work to ensure quality on complex tasks and projects.
  • Ability to work safely in gas distribution stations and understand station devices and variables including flow, pressure, and temperature.
  • Working knowledge of PHMSA Control Room Management requirements and gas measurement fundamentals.
  • Ability to create a script or compiled application that interacts with the SCADA application API and libraries.
  • For lead engineers, ability to influence and guide department engineers, provide technical leadership on complex, wide-impact projects, mentor and develop the team technically, collaborate across departments, and liaise with or direct contractors on company policy, standards, and best practices.
  • Bachelor of Science in Electrical Engineering (BSEE) with at least 7 years of technical experience, or a technical-related master's degree with at least 3 years of technical experience.
  • Theoretical engineering knowledge in planning, operations, engineering design, analysis, modeling, calculations, and the business model; values cross-functional collaboration and developing organizational relationships.
  • Practical engineering experience in planning, operations, engineering design, and construction, including field experience, standardization, economic analysis of engineering alternatives, and developing and defending business cases to stakeholders.
  • Ability to document and interpret engineering documentation adequately.
  • Ability to review and approve engineering work by others for compliance with company standards, specifications, and contract requirements.
  • Knowledge of local, state, and federal regulatory standards and requirements.
  • Computer operating system administration and support, including Unix, Linux, and Windows.
  • ECS NERC-CIP compliance support, including CIP-005, CIP-007, CIP-009, CIP-010, and CIP-011.
  • ECS support across multiple environments, including databases such as AQL, SQL, and Oracle; ECS-specific applications such as OASyS DNA; specialty control system applications; access administration such as LDAP, Kerberos, and Active Directory; protocols such as DNP, ROC/ROC Plus, TCP/IP, and Modbus; environment navigation tools such as RDP, PuTTY, FTP, and VNC; and specialty calculation programming such as Matlab and ABB Calc.
  • Gas field engineering and support, including programming RTUs and data concentrators at gas stations or customer facilities using tools such as Emerson Field Tools, Roclink 800, and Roclink for Windows.
  • Understanding of support requirements for 24x7x365 Control Room Operations.
  • Advanced technical documentation skills, including operational procedure maintenance for ISO and TO and control systems standards.
  • Ability to work with other departments and working knowledge of other business areas.
  • ECS historian application support, including PI Interface for multiple environments and Application Server PI Interface.
  • Understanding of control system software, hardware, and network design, including application and hardware high availability and redundant networking.
  • Advanced troubleshooting skills and ability to troubleshoot control system issues independently.
  • SCADA and DSS database administration, including CIM, SDM, DBNETD, SQL, and IDDUG files.
  • Computer language programming and development environments, including Java, C, C#, .NET, Perl, Python, VBScript, JavaScript, KSH, BSH, SqlPlus, HTA, HTML, NetBeans, and Visual Studio; gas SCADA RTU configuration.
Responsibilities
  • Provide support for the AVANGRID Energy Control Systems used to operate gas distribution systems, including SCADA, DSS, and back-office platforms.
  • Define and maintain SCADA databases and definitions; maintain telemetry data and evaluate and maintain accurate information in the Energy Control Systems.
  • Provide RTU configuration, software, testing, and commissioning support.
  • Support specification, design, testing, and development of Energy Control Systems to meet changing functional requirements.
  • Design enhancements to Energy Control Systems to improve the user interface.
  • Coordinate safe and orderly commissioning of new and redesigned PACs, RTUs, instrumentation, and other systems and components in gas gate and distribution stations and interconnecting facilities.
  • Monitor and ensure systems and components are designed, installed, tested, operated, and maintained according to operational requirements and safety and reliability standards.
  • Document and review commissioning procedures, provide operational assistance, and troubleshoot.
  • Work within the Control Center environment and support cybersecurity requirements for Control Center operations.
  • Maintain and create documentation for supported platforms and systems to meet regulatory requirements and standards.
  • Design and implement novel control system components and optimize system components.
  • Provide input to system design and assist in creating time-saving standardization.
  • Work independently with little supervision.
Desired Qualifications
  • Experience with the OASyS DNA SCADA system.
  • Experience with Emerson Fisher ROC and FloBoss RTUs.

About the company

Iberdrola is a Spanish multinational electric utility focused on clean energy. It generates, transmits, distributes, and sells electricity from wind, solar, hydro, and hydrogen, and it offers energy services like smart grids and energy efficiency for homes and businesses. It differentiates itself through its large geographic footprint and commitment to decarbonization, sustainable investments, and development of new grid technologies. Its goal is to lead the transition to a low-carbon economy by expanding renewable generation and modernizing grids.

Company Size

10,001+

Company Stage

IPO

Headquarters

Bilbao, Spain

Founded

2008

Get referred to Iberdrola Group

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • H1 2026 net profit rose 22% to €4.34 billion on network investment.
  • Iberdrola added 100,000 Spanish customers through Contigo Energía, strengthening retail scale.
  • The EIB-backed green financing and 2026 capacity mechanism support near-term project execution.

What critics are saying

  • Vineyard Wind’s GE dispute keeps Iberdrola exposed to U.S. offshore construction and contract friction.
  • Spain’s 7.09% renewable return and Brazil’s tariff resets squeeze project economics.
  • The Neoenergia buyout concentrates capital in Brazil, increasing regulatory and FX exposure.

What makes Iberdrola Group unique

  • Iberdrola’s 2028 plan targets €37 billion for grids and €58 billion total.
  • It operates 1.29 million kilometers of lines and 38.2 million supply points.
  • Neoenergia gives Iberdrola Brazil scale across distribution, transmission, and customer service.

Help us improve and share your feedback! Did you find this helpful?

Benefits

  • Paid Vacation
  • 401(k) Company Match
  • Health Insurance
  • Dental Insurance
  • Life Insurance

Company News

Europe Says
Oct 4th, 2026
Iberdrola invests $10.7M in EV charger maker Wallbox to boost profitability push

Wallbox has raised €9.5 million in a financing round led by Iberdrola through its subsidiary Inversiones Financieras Perseo. Madrid-based Orilla Asset Management, linked to Francisco Riberas' family, participated alongside Wallbox CEO Enric Asunción and existing investors. The New York Stock Exchange-listed company will use the funds to strengthen its financial position and expand its global presence in electric vehicle charging. Wallbox recorded losses exceeding €100 million in 2023. CEO Enric Asunción said the investment reinforces the company's mission to make EV charging more accessible whilst driving operational efficiency. Iberdrola's David Mesonero stated the round will strengthen Wallbox's liquidity to execute its business plan. The investment comes amid slower-than-expected electric vehicle growth, though efforts are increasing across Europe to boost charging infrastructure.

Levante-EMV
Sep 28th, 2026
Iberdrola acquires Contigo Energía, adding 100,000 electricity customers in Spain

Iberdrola has agreed to acquire the electricity retail business of Contigo Energía from Gesternova Group, adding 100,000 power customers in Spain. This marks the first acquisition of a retail electricity supplier by Iberdrola in its home market. The transaction, subject to customary closing conditions, forms part of Iberdrola's growth strategy in Spain's retail segment. The company views commercialisation as a key lever to accelerate electrification of homes and businesses. Contigo Energía will continue operating independently within the Iberdrola Group, similar to its subsidiary Niba, launched in June 2025 as a fully digital energy retailer. The deal covers only the electricity retail business and customer portfolio. Iberdrola leads Spain's market with nearly 9.8 million supply points, ahead of Endesa with over 9 million and Naturgy with almost 4.4 million.

Europe Says
Jul 24th, 2026
Project Finance Brief: Iberdrola Receives $160 Million for Wind and Solar Projects - Spain

Iberdrola, a Spanish multinational electric utility, received a €150 million (~$160 million) green loan agreement from the European Investment Bank to develop

PR Newswire
Jun 29th, 2026
Iberdrola picks ICEYE's SAR satellites to protect grid from extreme weather

Iberdrola has selected ICEYE to strengthen its electricity grid against extreme weather events using synthetic aperture radar satellite technology and near real-time data. The solution will help anticipate risks including floods, fires and strong winds, assess damage quickly and minimise impact on electricity supply. The initiative won a New-Tech Challenge within Iberdrola's PERSEO innovation programme, receiving over 40 proposals from ten countries. The 12-month pilot will launch in Spain, with ICEYE's Flood Solutions Suite providing forecasting, rapid impact assessment and flood insights. The deployment also includes wind damage assessment solutions for Iberdrola's assets in the United States and Australia. ICEYE's SAR technology can capture high-resolution imagery through smoke and storm clouds, enabling continuous monitoring in all weather conditions day or night.

World-Energy
Apr 2nd, 2026
Iberdrola Signs a Loan of 150 Million Euros With the Eib for Solar and Wind Energy in Italy - World-Energy

The loan will be used to build 400 MW of a portfolio of wind and photovoltaic projects in various locations in Italy. These will be Iberdrola’s first renewable plants in ItalyThe projects will make a significant contribution to Italy’s security of ene