Zachry Group

Zachry Group

Turnkey engineering and construction services

Carpenter

Full-Time
No salary listed
Mid
Pasadena, TX, USA
In Person

About the job

Requirements
  • A minimum of 4 years of experience working as a carpenter or carpenter helper in an industrial setting.
  • Ability to read blueprints, plans, sketches, and drawings proficiently.
  • Knowledge of materials, tools, and processes involved in basic building techniques and concrete form construction.
  • Ability to perform basic arithmetic functions and measure, mark, and cut equipment and materials to specification.
  • Current and valid Transportation Worker Identification Credential (TWIC) card.
  • Current required tools and reliable transportation.
  • Ability to meet the physical requirements, including standing, walking, bending, squatting, sitting, lifting, climbing ladders and stairways, and working at heights with appropriate fall protection.
  • Ability to work in all weather conditions while wearing required personal protective equipment.
  • Ability and willingness to follow all safety rules, company rules, and site regulations.
  • Ability to work a full schedule and additional overtime as needed.
Responsibilities
  • Construct, dismantle, and repair wooden and metal objects and concrete forms.
  • Read blueprints and specifications to determine the scope of work, including material locations, quantities, and sizes.
  • Identify the tools required for assigned tasks.
  • Identify safety risks and the precautions required to eliminate those risks.
  • Measure, mark, and cut wooden and metallic materials to required specifications.
  • Construct, reinforce, and dismantle pre-constructed concrete forms.
  • Build and construct wooden forms.
  • Perform miscellaneous construction projects, including building decks, steps, bulletin boards, and other wooden structures.
  • Clean and maintain work areas.
  • Assist other crafts and perform additional duties when not performing primary carpentry duties.
  • Use arms and hands to signal, grab, hold, turn, push, and pull objects, materials, controls, and tools.
  • Lift, carry, and move items weighing up to 50 pounds.
  • Wear required personal protective equipment, including a hard hat, safety glasses or spoggles, ear plugs, masks or respirators, high-visibility safety vest, leather gloves, and leather steel-toed work boots.
Desired Qualifications
  • Current Zachry or Zachry ROF'ed employee status.
  • Former experience working with Zachry Industrial, Inc.
  • National Center for Construction Education and Research certification for Industrial Journeyman Carpenter.
  • Experience working with concrete and rebar.

About the company

Zachry Group provides turnkey engineering, construction, maintenance, turnaround and fabrication services for the energy, chemicals, power, manufacturing and industrial sectors in North America. It covers the full project lifecycle by helping customers plan, build and renew critical facilities, often as a single‑point provider responsible for the entire scope. The company executes projects through engineering, procurement, fabrication and on-site construction with a strong emphasis on safety and reliable delivery. What sets Zachry Group apart is its long history (since 1924), a purpose‑driven culture and a consistent focus on safety, quality and meeting customers’ immediate and long-term goals across diverse sectors. Its goal is to help clients achieve their objectives by delivering the best possible outcomes while maintaining high safety standards.

Company Size

5,001-10,000

Company Stage

N/A

Total Funding

N/A

Headquarters

San Antonio, Texas

Founded

1924

Get referred to Zachry Group

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • NiSource awarded Zachry a 2025 EPC contract for a 2,600-megawatt Indiana project.
  • Zachry Maintenance Services won 10-year Cheniere renewal on March 30, 2026.
  • Chevron Phillips extended Zachry Maintenance Services five years on February 2, 2026.

What critics are saying

  • Zachry's May 2024 Golden Pass bankruptcy exposed brutal project overruns and liquidity strain.
  • July 30, 2026 Sabine Pass worker death triggered wrongful-death litigation against Zachry and Cheniere.
  • Texas operations still carry labor and safety overhangs after 4,000-plus layoffs and WARN scrutiny.

What makes Zachry Group unique

  • Zachry's 100-plus gas plants and 60,000-megawatt pedigree wins utility EPC work.
  • Zachry's 2026 nuclear push, including Terrestrial Energy and new nuclear leaders, broadens optionality.
  • Quanta joint venture on NiSource pairs Zachry engineering depth with stronger field execution.

Help us improve and share your feedback! Did you find this helpful?

Benefits

Hybrid Work Options

Company News

Business Wire
Oct 30th, 2025
Zachry Group Awarded Engineering, Procurement, and Construction (EPC) Contract for NiSource's Combined Cycle Generation Project

Zachry Group awarded Engineering, Procurement, and Construction (EPC) contract for NiSource's Combined Cycle Generation Project. SAN ANTONIO-(BUSINESS WIRE)-Zachry Group (Zachry) has been awarded the Engineering, Procurement, and Construction (EPC) contract for NiSource Inc.'s Combined Cycle Generation Project, a major infrastructure project located near Wheatfield, Indiana. The facility will support NiSource's delivery of electricity to a third-party customer and includes two nominal 1,300-megawatt gas-fired combined cycle units in a 2 x 2 x 1 configuration. A subsidiary of NiSource Inc. will own and operate the facility. The EPC contract will be executed by a joint venture between Zachry Group and Quanta Services, Inc. (Quanta). Zachry will lead engineering, procurement, project management, construction planning, and commissioning, drawing on its five decades of experience designing and building over 100 gas-fired facilities totaling more than 60,000 megawatts. Quanta will contribute field-level leadership and craft workforce management through its operating companies. This collaborative approach is designed to enhance execution certainty, optimize labor resources, and deliver cost-effective, high-quality infrastructure. "We are honored to partner with NiSource Inc. on this landmark project that reflects our shared commitment to delivering reliable, efficient, and sustainable energy solutions," said John B. Zachry, Chairman and CEO of Zachry Group. "Working alongside Quanta, we're combining our complementary strengths to execute a project of this scale with precision and innovation. Together, we're proud to support the region's energy future." "NiSource is committed to advancing transformative growth while ensuring that customer affordability remains at the heart of our strategy," said Lloyd Yates, President and Chief Executive Officer of NiSource. "Through this collaboration with Zachry and Quanta, we are expanding generation and grid infrastructure in a way that supports economic development and innovation while protecting customers from the costs of infrastructure investment. We are excited to partner with Zachry and Quanta to meet the evolving energy needs of our customers and communities." "We're proud to collaborate with Zachry Group, a company that shares Quanta's commitment to safety, performance, and delivering results that matter," said Duke Austin, Quanta's President and Chief Executive Officer. "We have respected Zachry's capabilities for decades, and together, we look forward to delivering this critical infrastructure project for NiSource." About Zachry Group Zachry Group is North America's pacesetter in turnkey engineering, construction, maintenance, turnaround and fabrication services to the energy, chemicals, power, manufacturing and industrial sectors. We work with customers to plan, build, and renew their most critical facilities, so they can achieve their immediate and long-term goals, all at the highest safety standards. Since 1924, we have been a purpose-driven organization, united by a shared set of values and the desire to deliver the very best outcome for our customers. Visit www.zachrygroup.com for more information.

MySA
May 27th, 2025
How a 101-year-old San Antonio company began climbing out of bankruptcy

Shortly after the company pulled away from the natural gas project, the Zachry Holdings subsidiary (Zachry Industrial Inc.) laid off more than 4,000 workers.

12NewsNow
Jul 9th, 2024
Zachry Holdings lays off 126 more workers

BEAUMONT, Texas - Zachry Holdings has once again found itself facing scrutiny, after laying off 126 more people between Beaumont, Orange, Sabine Pass, and Baytown.

Natural Gas Intelligence
Jun 27th, 2024
Plaquemines Export Project Receives Feed Gas as Testing Continues - Three Things to Know About the LNG Market

As the lead contractor in charge of staffing construction activities, Zachry's financial issues and ongoing bankruptcy proceedings have prevented the remaining contractors from resuming large-scale construction.

12NewsNow
Jun 18th, 2024
Zachry Holdings faces lawsuit, accusation of violating federal law in mass layoffs at Golden Pass LNG

Zachry Holdings faces lawsuit, accusation of violating federal law in mass layoffs at Golden Pass LNG.