Simplify Logo
Crusoe

Crusoe

Climate-aligned HPC powered by wasted energy

Master Electrician

Full-Time
$55/hr

+ Bonus + Restricted Stock Units

Expert
Brighton, CO, USA
In Person

About the job

Requirements
  • A valid and current Master Electrician license is required.
  • Significant experience as a Journeyman and Master Electrician is required, demonstrating deep understanding of electrical systems and best practices.
  • Advanced proficiency with electrician tools, techniques, and testing equipment is required.
  • Comprehensive knowledge of relevant electrical codes and regulations is required.
  • The ability to lead, mentor, and train other electricians is required.
  • Exceptional analytical and problem-solving skills are required to address complex electrical challenges.
  • Adherence to all safety requirements and Occupational Safety and Health Administration guidelines is required.
  • Excellent written and verbal communication skills are required to interact with team members, contractors, and other stakeholders.
  • The ability to perform the physical demands of the role, including lifting, bending, and working in various positions, is required.
  • Participation in the drug and alcohol program is required because the position is safety-sensitive.
Responsibilities
  • Oversee the installation of complex electrical systems in manufactured buildings while ensuring adherence to codes and specifications.
  • Diagnose and resolve electrical problems using effective and durable solutions.
  • Develop and implement preventive maintenance programs for electrical systems to ensure reliability and optimize performance.
  • Ensure electrical work complies with relevant codes and regulations and conduct inspections to verify adherence to standards.
  • Interpret complex electrical schematics and blueprints and develop detailed plans for electrical projects.
  • Provide guidance and mentorship to other electricians and contribute to their professional development.
  • Promote a strong safety culture within the team and ensure adherence to safety requirements and Occupational Safety and Health Administration guidelines.
  • Manage electrical projects, including planning, resource allocation, and timeline management.
Desired Qualifications
  • Experience in a manufacturing environment.
  • Valid Occupational Safety and Health Administration 30 certification.
  • Experience with programmable logic controller programming or automation systems.
  • Certifications related to specific electrical systems or technologies.
  • Project management experience.
  • Experience with high-voltage systems.
  • Knowledge of the National Electrical Code and other relevant standards.

About the company

Crusoe Energy Systems uses wasted, stranded, or clean energy sources to power high-performance computing and AI workloads. It turns otherwise unused energy into scalable computing resources and offers technical support to enterprises in AI and data-intensive fields. Unlike traditional data centers, Crusoe colocates infrastructure at energy sources to capture excess energy and convert it into computer power, reducing emissions. Its goal is to help the energy transition by providing climate-aligned, reliable computing while boosting resource efficiency.

Company Size

1,001-5,000

Company Stage

Series F

Total Funding

$19.6B

Headquarters

Denver, Colorado

Founded

2018

Get referred to Crusoe

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • September 2026 raised $3.9 billion at $30.9 billion valuation, funding aggressive expansion.
  • Crusoe reported over $140 billion contracted value and more than 6 gigawatts contracted.
  • Perplexity and Jane Street deals diversify demand while Tulsa production speeds deployments.

What critics are saying

  • Texas TCEQ hearings on Abilene emissions can delay permits through late 2026.
  • ERCOT and PUCT curtailment disputes threaten Crusoe's behind-the-meter economics and project timelines.
  • If power, permitting, or capital markets tighten, Crusoe's 40GW pipeline becomes unfinanceable.

What makes Crusoe unique

  • Crusoe vertically integrates power, data centers, and cloud, unlike pure neoclouds.
  • September 17, 2026 Series F showed NVIDIA, QIA, and Mubadala backing its model.
  • It pairs stranded-energy origins with factory-built infrastructure and in-house manufacturing in Tulsa.

Help us improve and share your feedback! Did you find this helpful?

Benefits

Industry competitive pay

Health insurance package options that include HDHP and PPO, vision, and dental for you and your dependents

Paid life insurance, short-term and long-term disability

Parental leave

Stock options in a fast-growing, well-funded technology company

Pet-friendly offices

Teladoc

401(k) with a 4% match

Unlimited time off

Cell phone reimbursement

Tuition reimbursement

Company paid commuter benefit; $100 per month

Calm

Growth & Insights and Company News

Headcount

6 month growth

0%

1 year growth

-1%

2 year growth

2%
The Wall Street Journal
Sep 17th, 2026
The Startup That Built OpenAI’s Biggest Data Center Is Now Making Tiny Ones

Crusoe raised $3.9 billion at a valuation of nearly $31 billion, as it bets on factory-built data centers.

Yahoo Finance
Sep 15th, 2026
Crusoe signs multiyear Perplexity cloud deal for Nvidia AI chips

Crusoe has signed a multiyear cloud agreement to supply Perplexity with Nvidia AI chips for model training and inference, Bloomberg reported Tuesday. The deal's financial terms and capacity were not disclosed. Under the agreement, Crusoe will manage the technology throughout its operating life. More than 1,800 Crusoe employees will receive access to Perplexity's Enterprise Max product, which provides AI-powered search tools. The contract adds to Crusoe's growing cloud business, which recently secured a five-year agreement with Jane Street worth roughly $13 billion. In June, Crusoe reported 4.9 GW of contracted AI infrastructure capacity across its data centre projects and cloud platform, with a development pipeline exceeding 40 GW. Crusoe opened a 400,000-square-foot manufacturing plant in Tulsa, Oklahoma, on Monday.

Yahoo Finance
Sep 14th, 2026
Crusoe opens second Tulsa facility, doubles workforce to 300 for AI infrastructure manufacturing

Crusoe has opened its second manufacturing facility in Tulsa, Oklahoma, adding 400,000 square feet to its operations and bringing its national manufacturing footprint to roughly 1 million square feet. The AI infrastructure company has hired more than 300 local workers across its two Tulsa sites, up from the 100 initially expected when the first facility opened in 2024. The facilities produce electrical equipment for AI infrastructure, including medium-voltage switchgear, low-voltage switchboards, electrical enclosures, industrial controls, and custom-fabricated copper busbar. The company has supplied more than 2,500 switchboards to its Stargate Project site in Abilene, Texas. Crusoe now employs more than 1,800 people, with 15,000 skilled workers across its sites. The company manufactures components in-house to reduce production time and maintain quality control.

Bloomberg Law
Sep 3rd, 2026
Crusoe Raises Over $3 Billion in Round at $30 Billion Valuation

Crusoe, a cloud-computing provider and data center developer doing business with OpenAI, Microsoft Corp. and Meta Platforms Inc., has raised over $3 billion in a funding round that values the startup at roughly $30 billion, according to people familiar with the situation.

Yahoo Finance
Jul 31st, 2026
Crusoe plans $1B expansion of Google-linked Texas data centre with two new buildings

Crusoe has registered two additional data-centre buildings at its Goodnight campus near Claude, Texas, with estimated construction costs totalling $1 billion, according to state filings. The buildings would add approximately 1.61 million square feet to the Armstrong County development, also known as Project Llano. Each single-storey structure is planned at roughly 805,380 square feet, with multiple data halls, office space and support areas. Public reporting has linked Google to the campus development through intermediary Ensign Infrastructure. Building 3 is scheduled for completion on 1 August, whilst Building 4 has a March 2027 completion date. Power plans include grid-supplied electricity and potential on-site generation, with a natural-gas plant proposal for up to 933 MW capacity. Separately, Crusoe announced a partnership with Aalo Atomics to examine modular nuclear generation for future data centres.