Simplify Logo
Archirodon Group

Archirodon Group

International EPC contractor delivering complex infrastructure

Mechanical QC Engineer

Full-Time
No salary listed
Senior, Expert
Bachelor's
Abu Dhabi - United Arab Emirates
In Person

About the job

Requirements
  • A bachelor's degree in Mechanical, Metallurgical, or another relevant Engineering discipline is required.
  • A minimum of 8 years of experience is required, including at least 8 years as a QC Engineer in Oil & Gas projects.
  • Strong experience in construction-phase projects is required.
  • ISO 9001 Internal Auditor certification is required.
  • ASNT Level II certification in radiographic testing, ultrasonic testing, magnetic particle testing, and penetrant testing is required.
  • CSWIP 3.1 or AWS Certified Welding Inspector certification is required.
  • Hands-on experience in welding, non-destructive testing, and painting/coating is required.
  • Knowledge of codes and standards, ADNOC specifications, and Shell DEP is required.
  • Familiarity with site fabrication, construction, and erection activities is required.
  • Good command of project quality auditing practices is required.
  • Good communication, organizational, independent working, professional judgment, and coordination skills are required.
Responsibilities
  • Assist with preparing quality documentation, including Inspection and Test Plans, and review construction documents for compliance with project quality requirements related to mechanical works.
  • Monitor design, procurement, construction, and final handover processes for mechanical works.
  • Monitor implementation of method statements and Inspection and Test Plans and ensure timely generation of required records.
  • Manage inspection and testing of mechanical works, including monitoring QC inspectors under the role's authority.
  • Monitor closeout of punch lists for incomplete mechanical works.
  • Monitor measurement and testing instruments used for mechanical works to ensure they are functional and calibrated.
  • Witness, review, and approve welder qualifications and Welding Procedure Specifications and Procedure Qualification Records.
  • Liaise and coordinate with third-party testing and inspection companies as required.
  • Perform statistical analysis and evaluation of mechanical-work test data.
  • Prepare, file, and maintain test, inspection, and other quality records.
  • Assist construction personnel in identifying and resolving problems and actual or potential nonconformances related to mechanical works.
  • Advise the QC Manager of nonconformances, raise Nonconformance Reports when necessary, and monitor corrective-action closeout and effectiveness.
  • Assist the QC Manager with periodic audits of subcontractors and suppliers, including technical compliance audits in the area of specialization.
  • Witness all specified non-destructive testing and mechanical testing, including hydrostatic and pneumatic testing.
  • Attend and witness client verification of site work inspections and tests and coordinate closeout of outstanding issues related to civil works.
  • Assist with preparation of final certification documents when required.
  • Assist with systems commissioning when required.
  • Manage site interfaces with implementation-contractor and client QC personnel and coordinate QC inspectors.
Desired Qualifications
  • ADNOC experience is an advantage.

About the company

Archirodon is an international engineering, procurement, and construction (EPC) contractor that manages large-scale infrastructure projects across more than 30 countries. It covers the full project lifecycle by engineering designs, sourcing materials, and executing construction for sectors such as industrial facilities, marine works, and transportation systems, all while prioritizing health, safety, and environmental respect. The company works through a client-centric approach, coordinating multiple teams and partners to meet stakeholders’ needs and deliver projects on time and to specification. Unlike some competitors, Archirodon emphasizes its global footprint, transparent communication, and a track record of reliable project delivery as core differentiators. Its primary goal is to successfully complete complex EPC projects for a diverse client base, contributing to economic growth and maintaining high standards of safety and environmental responsibility.

Company Size

N/A

Company Stage

N/A

Total Funding

N/A

Headquarters

N/A

Founded

N/A

Simplify Jobs

Simplify's Take

What believers are saying

  • KNPC awarded Archirodon a $523 million Shuaiba Oil Pier contract in October 2025.
  • MEED recognized Archirodon’s Jeddah South Terminal Phase 1 expansion in 2025.
  • USACE awarded Aici-Archirodon JV an $8.5 million Kuwait microgrid contract in 2025.

What critics are saying

  • NEOM cancelled Archirodon’s $1 billion tunnel JV on March 13, 2026.
  • Iraq’s $120 million Al-Faw dispute shows prolonged client-payment and arbitration exposure.
  • Heavy project concentration in Saudi Arabia and Kuwait ties revenue to a few clients.

What makes Archirodon Group unique

  • Archirodon wins complex marine EPC jobs, like Shuaiba Oil Pier in October 2025.
  • It still lands mega-project consortia, including NEOM and Samsung C&T partnerships.
  • Boskalis sold its 40% stake, leaving Archirodon more independently controlled.

Help us improve and share your feedback! Did you find this helpful?

Company News

Tunnels & Tunnelling
Mar 18th, 2026
Neom cancels The Line tunnels contracts.

Neom cancels The Line tunnels contracts. The 170km-long linear city is being redesigned as data centres. Neom has cancelled the contracts related to the construction of the tunnel sections of The Line in north-west Saudi Arabia, T&TI's sister publication, MEED, reports. In a stock exchange announcement filed on March 13, South Korean contractor Hyundai E&C said that Neom cancelled its contract on December 29 last year. Hyundai E&C was executing the drill-and-blast section of The Line's tunnels in a joint venture with Greece's Archirodon and South Korean counterpart Samsung C&T. The firm said its share of the joint venture was about 35%, amounting to $483m. Neom awarded contracts for constructing the mountain tunnel sections of The Line in June 2022. The drill-and-blast works were split into four packages, with two contracting teams winning two packages each. The other joint-venture team comprised Spain's FCC, the local Shibh Al-Jazira Contracting Company (Sajco) and Beijing-based China State Construction Engineering Corporation. The tunnels formed part of the infrastructure backbone of Neom's 170km The Line development, launched in January 2021. What began as Crown Prince Mohammed Bin Salman's defining symbol of a post-oil Saudi Arabia unravelled with quiet finality over roughly two years. By April 2024, planners were reportedly being forced to cut the initial phase to just 2.4km by 2030. By July last year, with the sovereign wealth fund facing tightening liquidity, the kingdom was reported to have conducted a "strategic review" to determine whether The Line was feasible - a process described as a "recalibration" of Vision 2030. Resources are now being directed to projects essential for the Fifa World Cup 2034, Expo 2030, and critical housing, healthcare and education targets. According to media reports, the government has pivoted towards repositioning what remains of Neom as an industrial and data centre hub, leveraging the Red Sea coastline's access to seawater cooling for AI infrastructure. This news article was first reported by T&TI's sister publication, MEED. Give your business an edge with its leading industry insights.