Full-Time

Earned Value Management/Principal Earned Value Management

Posted on 11/1/2025

Northrop Grumman

Northrop Grumman

10,001+ employees

Diversified defense and space systems integrator

Compensation Overview

$73.9k - $110.9k/yr

+ Overtime + Shift Differential + Discretionary Bonus + Annual Bonuses + Long Term Incentives

Northridge, Los Angeles, CA, USA

In Person

Relocation assistance available; travel up to 25%.

Category
Accounting (3)
, ,
Required Skills
Sales
Financial analysis
Word/Pages/Docs
Data Analysis
Excel/Numbers/Sheets
PowerPoint/Keynote/Slides
Requirements
  • Bachelor’s degree and 2 plus years’ experience or a Master’s degree with 0 plus years’ experience or a High School diploma / Equivalent with 6 years’ experience may be considered in Lieu of degree
  • Understanding of program cost control, including Earned Value Management
  • Financial analysis and/or reporting experience
  • Knowledge of FAR/DFARS
  • Experience with Microsoft Office applications (Excel, PowerPoint, Word)
  • Skilled in preparing and analyzing data
  • Ability to obtain and maintain an Active U.S. Department of Defense (DoD) Secret security clearance
Responsibilities
  • Assists with the maintenance of an Earned Value Management (EVM) baseline that interfaces with an MS Project schedule
  • Works with Program Management, IPTs, CAMs, and functional business analysts to perform detailed cost/schedule planning, Earned Value variance analysis, identification of cost/schedule problems, and developing corrective action plans.
  • Timely and accurate Estimate at Completion development, analysis, and reporting
  • Financial reporting to include creating of AOP and monthly financial forecasts, cash flow and material forecasts, and invoiced/unbilled analysis.
  • Performs financial analyses such as funding profiles, Sales & OM outlook, and variance analysis
  • Interface with program and functional management to provide financial support and analysis to meet program requirements.
  • Assists in preparing for internal and external audits and/or compliance reviews
Desired Qualifications
  • +3 years’ experience with Earned Value Management and/or EVMS Software
  • Working knowledge of Earned Value Management principles and EVMS software (Deltek Cobra/MPM)
  • U.S. Federal Government contracting regulations experience – to include working knowledge of FAR/DFARS
  • Active DoD Secret security clearance

Northrop Grumman designs and builds advanced aerospace and defense systems across aeronautics, space, mission systems, and electronic defense. It delivers complex, integrated platforms—aircraft, spacecraft, sensors, and software—through large national programs and long-term contracts. It differentiates itself by its long history of strategic acquisitions and breadth across air, sea, space, and cyber domains, enabling end-to-end solutions. Its goal is to strengthen national security and extend global reach by developing and fielding advanced capabilities such as stealth bombers, space systems, missiles, and cyber defenses while maintaining scale and a robust backlog.

Company Size

10,001+

Company Stage

IPO

Headquarters

Falls Church, Virginia

Founded

1939

Simplify Jobs

Simplify's Take

What believers are saying

  • $95.61 billion backlog ensures revenue visibility through 2030s.
  • Q1 2026 revenue hit $9.88 billion, up 4.4% year-over-year.
  • Australian deal establishes domestic rocket motor production for allies.

What critics are saying

  • Space Force terminates $3B OPIR Polar program in FY2027 budget.
  • Baltimore layoffs hit Mission Systems from contract reductions now.
  • Supply chain delays block $95.61B backlog conversion by 2027.

What makes Northrop Grumman unique

  • Northrop Grumman maintains B-2 stealth bomber fleet as prime contractor.
  • Northrop Grumman builds James Webb Space Telescope for cosmic exploration.
  • Northrop Grumman develops B-21 Raider for U.S. strategic modernization.

Help us improve and share your feedback! Did you find this helpful?

Benefits

Health Insurance

Life Insurance

Disability Insurance

Paid Vacation

Paid Holidays

Relocation Assistance

Performance Bonus

Company News

Defence Leaders Limited
Apr 14th, 2026
Northrop Grumman and U.S. Air Force push Sentinel ICBM programme toward 2027 first flight.

Northrop Grumman and U.S. Air Force push Sentinel ICBM programme toward 2027 first flight. Image: Northrop Grumman Northrop Grumman and the U.S. Air Force are reporting significant progress on the LGM-35A Sentinel intercontinental ballistic missile programme, with first flight targeted for 2027 and initial operational capability expected in the early 2030s. A restructured acquisition strategy is driving faster development of America's next-generation ground-based nuclear deterrent, according to Northrop Grumman. Hardware testing, supply chain expansion and infrastructure prototyping are all advancing in parallel, compressing timelines without sacrificing performance standards. Replacing the Minuteman III Sentinel is designed to replace the ageing Minuteman III ICBM, the ground-based leg of the U.S. nuclear triad. The system will span more than 32,000 square miles across five states, requiring new launch silos, command infrastructure and transport systems. The programme draws on lessons from the B-21 Raider stealth bomber, with Sentinel designed entirely within a digital ecosystem to boost collaboration and engineering efficiency. Its three-stage booster uses solid rocket motors made from composite materials 70% lighter than those in the Minuteman III, increasing payload capacity, range and accuracy for what Northrop describes as "no-fail ICBM missions." Hardware Milestones The missile has moved from digital blueprints into active prototyping, assembly and testing. Northrop Grumman has assembled the first complete three-stage Sentinel booster, verifying design integrity and manufacturing processes. Solid rocket motors for the first five flight tests are already in production. Two Interstage Separation Tests confirmed the missile can cleanly shed spent first and second-stage motors during flight. A shroud fly-off test validated the protective cover housing the missile's payload. An initial mass model sled test subjected the Navigation Inertial Measurement System to flight-representative stress conditions. Passing the test confirms the guidance hardware can survive the environmental forces of actual flight, which is critical to Sentinel's accuracy and mission reliability. Infrastructure and Command Systems Alongside missile development, supporting infrastructure is progressing at pace. Northrop broke ground on a prototype Sentinel Launch Silo tube to validate structural design and construction methods. The new modular silo architecture is expected to cost less than refurbishing existing Minuteman III silos while improving performance and long-term maintainability. Mission-critical transport systems cleared a cross-country road test, confirming high-value assets can be safely moved between facilities. The Launch Support System, a digital command and control network, completed its critical design review, clearing the way for build, test and qualification phases. Industrial Scale More than 500 supply chain partners and upwards of 10,000 professionals support Sentinel across the country. Northrop Grumman has invested $13.5 billion in infrastructure and research and development over the past five years across critical national security programmes. Of that total, $2 billion went specifically toward expanding solid rocket motor capacity, directly supporting Sentinel's ability to scale production. Sarah Willoughby, vice president and general manager for strategic deterrent systems at Northrop Grumman, said the programme "exemplifies what's possible when a bold acquisition approach meets relentless innovation," adding that its workforce and partner network were "united by a common purpose to field the Sentinel weapon system with speed and scale." Long-Term Deterrence The programme is designed to serve U.S. strategic deterrence requirements through 2075, making design resilience and long-term adaptability central engineering priorities. Northrop and the Air Force are also engaging with communities surrounding missile wings, gathering data to support construction planning, fielding and future operations. With 2027 approaching, programme momentum is set to become more publicly visible as construction of critical facilities begins and the first Sentinel flight test draws near.

Business Insider
Apr 13th, 2026
Northrop Grumman and U.S. Air Force accelerate Sentinel program momentum.

Northrop Grumman and U.S. Air Force accelerate Sentinel program momentum. Apr. 13, 2026, 09:00 AM FALLS CHURCH, Va., April 13, 2026 (GLOBE NEWSWIRE) - Northrop Grumman and the U.S. Air Force are achieving substantial progress across the Sentinel program, advancing toward first flight in 2027 and initial capability in the early 2030s. From missile testing and infrastructure prototyping to supply chain readiness, Sentinel is accelerating development enabled by a transformed acquisition approach. In close partnership with the U.S. Air Force, Northrop Grumman is focused on achieving the earliest possible initial capability for the Sentinel weapon system. With rigorous systems engineering and an incremental approach to development and fielding, the Sentinel team is advancing capability through a series of phases that prioritize speed to make the system operational as quickly as possible. This allows testing and validation to occur earlier, lessons learned to be applied in real time and capability to be fielded faster while maintaining rigorous performance standards. Sentinel is a new system to replace the aged ground-based leg of the nuclear triad, spanning more than 32,000 square miles across five states. With elements of the updated acquisition approach already in motion, the Sentinel government-industry team has made significant progress testing critical hardware, fortifying the supply chain - a massive industrial base of more than 500 partners - and augmenting the nationwide workforce of more than 10,000 dedicated professionals. Over the past five years, Northrop Grumman has invested $13.5 billion in infrastructure and R&D for critical national security programs, including $2 billion dedicated to solid rocket motor capacity and capabilities that benefit Sentinel's ability to accelerate and scale production. The Sentinel program continues to gain momentum - and Northrop Grumman is dedicated to delivering warfighter capabilities that balance breakthrough technology, affordability and speed. "The Sentinel program exemplifies what's possible when a bold acquisition approach meets relentless innovation," said Sarah Willoughby, vice president and general manager, strategic deterrent systems, Northrop Grumman. "Our dedicated workforce and extensive partner network are united by a common purpose to field the Sentinel weapon system with speed and scale while delivering enhanced capability to the U.S. Air Force." From Digital Designs to Verified Hardware Leveraging lessons learned from the B-21 Raider, the LGM-35A Sentinel intercontinental ballistic missile (ICBM) was designed in a digital ecosystem - increasing speed, efficiency and collaboration. The new three-stage booster design bolsters accuracy and flexibility for no-fail ICBM missions. Sentinel's solid rocket motors are made of strong and corrosion-resistant composite materials which are 70% lighter than Minuteman III's - increasing payload capacity and range. The missile has already moved from digital designs into early prototyping, assembly and testing, paving the way for the first flight test and initial capability. Examples of the missile's progress include: * Every propulsive element of the Sentinel missile has been prototyped and tested. Northrop Grumman has assembled the first three-stage Sentinel booster, verifying design, processes and technologies, and solid rocket motors for the first five flight tests are already in production. * Two Interstage Separation Tests were conducted to demonstrate the ability of the missile to cleanly separate the spent solid rocket motor stages one and two from the rest of the vehicle. A shroud fly-off test tested and validated the design of the shroud, which is a protective cover for the missile's payload. * The Guidance and Control Hardware - the brains of the missile - was stress tested through an initial mass model sled test which exposed the Navigation Inertial Measurement System (NIMS) hardware to flight-like conditions to evaluate performance. Passing this test means the hardware will survive the environmental stresses induced during the missile's flight, critical for Sentinel's accuracy and overall mission success. First fully assembled Sentinel ground test booster, including stages-one, -two and -three solid rocket motors and both interstage mechanisms. (Photo Credit: Northrop Grumman) Sentinel's Guidance and Control (G&C) hardware has passed an initial mass model sled test conducted by Northrop Grumman Corporation and the U.S. Air Force. (Photo Credit: U.S. Air Force) Sentinel replaces existing launch silos with a new modular silo design and supporting infrastructure. The new architecture saves costs and improves performance and maintenance - positioning Sentinel to meet today's requirements while staying adaptable to meet future needs. Alongside the missile development, the Sentinel program has seen significant progress in maturing other crucial elements of the complex weapon system. * Northrop Grumman broke ground on a prototype of the Sentinel Launch Silo tube, which will test and validate the structural design and construction approach. The new design is a key enabler in accelerated fielding of the system and is expected to control costs for the program when compared to refurbishing Minuteman III's silos. * Sentinel's mission-critical transport systems were verified through a cross-country road test, ensuring high-value assets will be protected during transit. * The Launch Support System (LSS) - a digital command and control infrastructure - completed its critical design review, paving the way for system build, test and qualification phases. Proving Today, Building for What's Next The Sentinel weapon system is one of the most rigorous and thoroughly tested defense programs in modern history - ensuring each component meets requirements and is resilient for the warfighter from initial capability through 2075. This program momentum will become even more visible in 2027 as digital designs translate into critical facilities, infrastructure and the first Sentinel flight test. Northrop Grumman is partnering with the U.S. Air Force and industry teammates to support and inform local communities at the missile wings, collecting critical data and insights that lay the foundation for successful construction, fielding and future operations. Northrop Grumman and its partners will continue prototyping and testing the cornerstones of the new system - including the missile, Launch Silo and Launch Center - on the path to certifying each design, flight testing and eventually reaching initial capability. Together, Northrop Grumman and the U.S. Air Force will deliver the world's most powerful ICBM system, ensuring strategic deterrence that withstands the test of time - with unmatched reliability and undisputed credibility. Photos accompanying this announcement are available at Markets Insider and Business Insider Editorial Teams were not involved in the creation of this post. Sponsored Financial Content

The White House
Apr 9th, 2026
Advancing the United states-hungary bilateral partnership.

Advancing the United states-hungary bilateral partnership. The White House April 9, 2026 On his historic trip to Budapest, Vice President JD Vance reinforced a new era of U.S.-Hungary bilateral cooperation in energy, technology, and security. The achievements outlined below advance a shared bilateral agenda rooted in innovation, strategic stability, and long-term economic and security partnership. Strengthening Energy Cooperation * U.S. Crude Oil Purchases: Hungary's energy company, MOL Group, purchased 510,000 tons of crude oil worth $500 million from the United States and American energy companies to deepen its strategic energy partnership. * Small Modular Reactor (SMR) Study: Under the Intergovernmental Agreement focused on civil nuclear energy, the United States is supporting a front-end engineering and design (FEED) study to facilitate the deployment in Hungary of a new U.S. SMR, ensuring Hungary's role as a key partner in European energy security. The FEED study paves the way for Hungary to move forward with the purchase and construction of up to 10 U.S. SMRs, with a potential total value of $20 billion. Several U.S. companies including GE Vernova, Holtec, and Westinghouse signed MOUs with Hungary's electricity provider, MVM, on SMR collaboration. * Lifetime extension of Paks1: Westinghouse and MVM signed MOUs to explore the use of Westinghouse technology to extend the lifetime use of the Paks 1 nuclear power plant and to collaborate on SMR technology. This MOU, which builds on the November 2025 agreement for Westinghouse to supply nuclear fuel, will further bolster Hungary's energy security through U.S. cooperation. Deepening Commercial Ties and AI Cooperation * GE Healthcare and Semmelweis University signed an MOU to create an Oncology Center of Excellence in Hungary that leverages U.S. medical technology and AI-based innovation to improve cancer care for Hungarian patients and expand access to advanced American healthcare solutions. * Microsoft Corporation, the Government of Hungary, and Gábor Dénes University signed an MOU to bring digital and AI training solutions for small and medium-sized enterprises to boost technological readiness. * Microsoft and the Government of Hungary signed an MOU to secure digital infrastructure for public institutions through Sovereign Cloud solutions. Advancing Regional Peace, Security, and Defense Cooperation * Procurement of U.S. High Mobility Artillery Rocket Systems (HIMARS): Hungary announced plans to procure $700 million worth of U.S. HIMARS and integrate them into its defense planning, enhancing Hungary's ability to deter aggression while supporting American manufacturing jobs and strengthening NATO's collective defense posture along the Eastern Flank. * Secure Communications MOU: L3 Harris and 4iG signed an MOU seeking to incorporate L3 Harris communication technology into Hungary's HIMARS program, ensuring interoperability with NATO and U.S. forces. * Space and Defense Cooperation Agreement: Northrop Grumman and 4iG announced a new joint effort to develop a geosynchronous satellite capability for Hungary, with the objective of advancing national security, space, resilience, and helping to maintain and expand the U.S. industrial base for geosynchronous satellites.

Tech in Asia
Apr 4th, 2026
Impulse Space, Anduril to develop space interceptor prototypes.

Impulse Space, Anduril to develop space interceptor prototypes. Impulse Space is working with Anduril Industries on prototype space-based interceptors for President Donald Trump's Golden Dome shield, people familiar with the matter said. Impulse Space is a California spacecraft startup led by Tom Mueller, a founding member and employee No. 1 at SpaceX. The companies have been selected by the Pentagon to develop prototypes, the people said. In November, the US Space Force said it awarded multiple contracts of under US$9 million each to unnamed firms, with Impulse serving as a subcontractor to Anduril, the people said. The interceptors are meant to track and destroy missiles from orbit, but the technology does not yet exist, and Golden Dome could cost US$185 billion and show operational capability by 2028, General Michael Guetlein said in March. Food for thought. Implications, context, and why it matters. Tiny contracts open the door to a multi-billion dollar prize. * Anduril and Impulse Space are competing with Lockheed Martin, Northrop Grumman, and startup True Anomaly, which Reuters reported were among firms that received initial prototype awards 1. * A July Pentagon presentation seen by Reuters put the early awards at about $120,000 each, keeping them below the $9 million level that typically triggers public disclosure requirements 2, 1. * Those starter deals feed into a bigger contest with a $340 million prize pool for companies that complete an on-orbit test, based on the July presentation cited by Reuters 2. * Winners can then pursue production work estimated at $1.8 billion to $3.4 billion a year, which makes the small awards a high-pressure entry step 2. The Pentagon is setting up a showdown between defense giants and startups. * The Golden Dome approach pushes newer defense tech firms to compete head-to-head with traditional defense primes 3. * For startups like Anduril, an award can serve as proof of capability and help a shift from experimental vendor to potential prime contractor on a large weapons system 3. * For incumbents like Lockheed Martin, participating helps protect existing missile-defense business lines as attention moves to space-based systems meant to track and destroy missiles from orbit 3. * Software also sits at the center of the effort. Anduril and Palantir Technologies (a software company that sells data-analysis tools to governments and enterprises) are working together on Golden Dome software, according to a source familiar with the matter cited in a Reuters pickup 4. Stay updated on the go with our mobile app. Get latest insights with smoother, more personalized experience through TIA mobile app. How would you feel if you could no longer use Tech in Asia? Share, tag us, and land on our Wall of!

Yahoo
Apr 3rd, 2026
Morgan State University receives $2.4M grant to lead project converting nuclear radiation into electrical energy.

Morgan State University receives $2.4M grant to lead project converting nuclear radiation into electrical energy. Samantha Dorisca Fri, April 3, 2026 at 3:10 PM UTC * Morgan State University has been awarded a $2.4 million grant by DARPA to lead the Rads to Watts project, converting nuclear radiation into electrical energy. Morgan State University has received a grant to support an energy research project. According to a press release, the university's Department of Electrical and Computer Engineering (ECE) has been awarded a $2.4 million grant by the Defense Advanced Research Projects Agency, or DARPA, to lead Rads to Watts, a project that will convert nuclear radiation into electrical energy. Morgan State University becomes the first historically Black college and university (HBCU) to lead a project from the DARPA. "This award reflects the strength of our research and our ability to lead high-impact federally funded projects that address complex national challenges," said Oscar Barton Jr., dean of the Clarence M. Mitchell Jr. School of Engineering, in a press release. "It also highlights Morgan's continued growth as a leader in advanced engineering research and innovation." Dr. Michael Spencer, a professor of electrical and computer Engineering, leads the Rads to Watts project. "We are excited to participate in DARPA's project Rads to Watts... Our goal is to show that a scaled system can meet demanding performance, safety, and durability requirements, while laying the groundwork for future, even higher-power implementations," he said in the press release. Under his guidance, a team of researchers at Morgan State will partner with organizations that include Northrop Grumman, Widetronix, Omega Project, Pacific Northwest National Laboratory, and Applied Research Associates, according to the press release. Specifically, the project will use technology to generate electricity from radioactive emissions. Researchers from ECE will be working to develop Symphonee, a device backed by more than 20 years of research by scientists at Morgan State University. According to the news release, the device "is a multi-junction silicon carbide (SIC) PIN structure designed to operate with strontium-90 and yttrium-90 radioisotopes. If successfully developed and commercialized, the technology could generate kilowatts of power for remote locations such as the Arctic or space, with additional potential applications in implantable medical devices." The Rads to Watts project is initially funded for 15 months, per the release, but could receive additional funding options of $937,489 for nine months and $28,237 for six months. If all options are used, this would mean $3.3 million in total funding for the project.

INACTIVE