Operations Project Scheduler
Venture Global LNG
Operations Project Scheduler
Venture Global LNG
Develops and operates LNG export facilities
Venture Global LNG (“Venture Global”) is a long-term, low-cost provider of American-produced liquefied natural gas. The company’s Louisiana-based export projects service the global demand for North American natural gas and support the long-term development of clean and reliable North American energy supplies. Using reliable, proven technology in an innovative plant design configuration, Venture Global’s modular, mid-scale plant design will replace traditional designs as it allows for the same efficiency and operational reliability at significantly lower capital cost.
We are seeking qualified applicants for the position:
Operations Project, SchedulerLocated:
CameronSummary
The Operations Projects, Scheduler reports to the Shutdown Turnaround Outage (STO) Director and is responsible for managing the STO scheduling processes of work at Venture Global Calcasieu Pass Liquefied Natural Gas (CP2LNG) facility. The Operations Projects, Scheduler will require interface and work in collaboration, but not limited to, with Operations, Maintenance (Planning and Execution), Engineering, Warranty, Project Departments.
General Description Duties & Responsibilities
Qualifications
Required experience
Skills:
Venture Global LNG is an Equal Opportunity Employer. We do not discriminate on the basis of race, religion, color, sex, gender identity, sexual orientation, age, non-disqualifying physical or mental disability, national origin, veteran status or any other basis covered by appropriate law.
Develops and operates LNG export facilities
Venture Global LNG produces and exports liquefied natural gas (LNG) from North America for global customers. It turns natural gas into a liquid by cooling it, enabling easier storage and transport through large export facilities. The company differentiates itself by operating multiple high-capacity terminals to lower production costs and by signing long-term contracts that provide predictable revenue. Its goal is to deliver low-cost, reliable, and cleaner energy to customers worldwide through efficient, scalable LNG exports.
Explore more opportunities at Venture Global LNG