B

Bloom Energy

Hydrogen fuel cell-based microgrid provider

Senior Staff Field Quality Engineer

Full-Time
$134.5k - $193.5k
Senior
Bachelor's, Master's
Seattle, WA, USA+2 moreMore locations: San Jose, CA, USA | Bend, OR, USA
HybridPrimarily supports customers in the West Coast region.
Manufacturing Quality & TestQuality Engineering
Company Does Not Provide H1B Sponsorship

About the job

Requirements
  • A Bachelor of Science degree in Mechanical Engineering, Electrical Engineering, Construction Management, or a related field, or 10 years of relevant work experience.
  • At least 5 years of field experience constructing, installing, and commissioning complex power systems.
  • Ability to read, understand, and clearly communicate civil and electrical designs and standards to internal and external partners and respective verticals.
  • Ability to operate with significant autonomy and clearly communicate schedules and top priorities, document and escalate emerging issues to internal and external business partners.
  • Ability to use organizational roles and responsibilities to hold process owners accountable for established design and workmanship standards and national and regional code requirements.
  • Ability to respond professionally in customer-facing situations, attend critical milestone activities with customer representatives, and communicate company expectations when identifying deficiencies or contract deviations.
  • Experience with Microsoft Suite and Salesforce or a similar platform.
Responsibilities
  • Audit and support site construction and product installations to ensure they meet design requirements and enable safe, reliable, on-time commencement of operations.
  • Inspect site construction and product installations and confirm design intent is met or exceeded before projects proceed to product commissioning.
  • Document, track, and drive resolution of cross-functional and external EPC process deficiencies from site design through commencement of operations.
  • Perform safety and environmental audits of sites throughout construction, installation, and commissioning.
  • Establish 8D problem-solving expectations with internal and external process owners, ensuring critical quality, safety, reliability, and serviceability issues are contained, analyzed for root causes, and addressed with short- and long-term corrective measures.
  • Respond rapidly to early-life field failures involving construction, installation, and product manufacturing issues using the 8D process.
  • Support Field Replacement Unit exchanges and product upgrades at operational sites with Field Service and Operations organizations.
  • Drive continuous improvement, value-added engineering, and cost reduction using observations and collected performance data.
Desired Qualifications
  • A Master of Science degree is desirable.
  • Oracle experience is desirable.
  • International project experience is desirable.

About the company

Bloom Energy provides on-site clean power for businesses and data centers using hydrogen fuel cells in microgrids. The core idea is to convert hydrogen into carbon-free electricity, while the system can also produce clean hydrogen and a pure CO2 stream for energy-efficient carbon capture. It offers fuel-flexible options and initiatives to use greenhouse gases for clean energy, reducing dependence on dirty fuels and strengthening decarbonization. The goal is to deliver reliable, affordable energy, lower emissions, and support decarbonization through hydrogen and carbon capture solutions.

Company Size

1,001-5,000

Company Stage

IPO

Headquarters

San Jose, California

Founded

2001

Get referred to Bloom Energy

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • Bloom raised Q2 2026 revenue 166% to $1.065 billion on AI data-center demand.
  • Bloom acquired Fremont's 158,000-square-foot plant, targeting 2 gigawatts annual capacity by year-end 2026.
  • Bloom joined the S&P 500 in September 2026, boosting institutional demand and credibility.

What critics are saying

  • Pomerantz filed a securities class action on September 24, 2026 over supply-chain disclosures.
  • Hunterbrook's July 8, 2026 report alleges Chinese scandium dependence, attacking Bloom's supply chain.
  • Oracle's Project Jupiter force majeure exposed customer concentration and project-timing fragility.

What makes Bloom Energy unique

  • Bloom Energy ships on-site solid-oxide fuel cells, cutting data-center power lead times.
  • Oracle approved Bloom systems in July 2025, validating fast deployment for hyperscalers.
  • Brookfield expanded its Bloom partnership to $25 billion, signaling differentiated project-finance scale.

Help us improve and share your feedback! Did you find this helpful?

Benefits

Flexible Work Hours

Growth & Insights and Company News

Headcount

6 month growth

-1%

1 year growth

-2%

2 year growth

-3%
Yahoo Finance
Oct 12th, 2026
Bloom Energy vs NextEra: 37% revenue growth against 25% net margin in 2026 stock pick

Bloom Energy and NextEra Energy offer investors very different bets on clean power, according to a comparison of their FY 2025 results. Bloom, which makes on-site fuel cell systems for data centres, grew revenue 37.3% to nearly $2.0 billion. It posted a net loss of about $88.4 million and free cash flow of roughly $57.2 million. NextEra, which runs Florida Power & Light and a large renewables business, reported revenue of about $27.5 billion, up 11%. Net income was nearly $6.8 billion, and free cash flow was almost $3.2 billion. NextEra trades at a forward price-to-earnings ratio of 19.1x against Bloom's 107.9x, and pays a 3.2% dividend. Bloom pays none.

Yahoo Finance
Oct 12th, 2026
Bloom Energy shares are still 19% below their record after a 53% slide, despite $1.07B quarterly revenue

Bloom Energy's stock has fallen 20% or more five times since September 2025. It recovered from four of those drops within about a month, but not the latest. Shares closed at a record $345.85 on June 22, then fell 53% to $163.75 by July 29. They have since risen about 71% to roughly $280, still about 19% below the peak. The slide came despite record results. Second-quarter revenue rose 166% year over year to about $1.07 billion, the first time the fuel cell maker passed $1 billion in a quarter. It raised its 2026 adjusted earnings-per-share forecast from $1.33-$1.48 in February to $2.55-$2.85. Valuation and short seller claims may explain the lag. Hunterbrook Media, which said it could profit from a fall in the stock, questioned Bloom's accounting and supply of scandium oxide on July 8. Bloom "categorically rejects" the claims.

Yahoo Finance
Oct 11th, 2026
Bloom Energy's Q2 revenue tops $1B as stock surges 200%, but is it too late to buy?

Bloom Energy's stock has risen more than 200% since last October and over 1,400% in five years. The company sells solid oxide fuel cells that generate power on site at data centres, letting AI developers skip long waits for a grid connection. Second-quarter product revenue hit $935 million, up about 215% year over year. Total revenue passed $1 billion for the first time, while operating expenses rose only to about $173 million from $111 million. Bloom swung from a $3.5 million operating loss to a $182 million operating profit. About 73% of revenue came from a single buyer, which could make growth less durable. Bloom plans a microgrid at the Fremont, California, campus of server maker miTAC Computing. The deal hints at expansion beyond data centres into the wider AI supply chain.

Tech News Tube
Oct 8th, 2026
Hear from Ambrosia Energy and Bloom Energy execs on where the AI infrastructure boom is creating opportunity at TechCrunch Disrupt 2026.

Hear from Ambrosia Energy and Bloom Energy execs on where the AI infrastructure boom is creating opportunity at TechCrunch Disrupt 2026. * TechCrunch By TechCrunch EventsOct 8, 2026, 11:00 am Read Tech News 81 ptsTrending Ambrosia Energy CEO Ben Longmier and Bloom Energy SVP Bill Thayer join the Smart Systems Stage at TechCrunch Disrupt. Register now to save up to $100. Grab a second of the same pass to save 50%. Read Article Share Article * email * x.com * facebook * pocket * reddit * tumblr * linkedin * pinterest Tech News Tube is a real time news feed of the latest technology news headlines. Follow all of the top tech sites in one place, on the web or your mobile device.

AZBEX
Oct 7th, 2026
Grande Valley Data Center Campus gets permit approval.

Grande Valley Data Center Campus gets permit approval. In its Oct. 1 meeting, the Casa Grande Planning and Zoning Commission approved a conditional use permit request that will allow development of a new 954-acre data center campus south of Montgomery Road and Maricopa-Casa Grande Highway. The request from owner LKY Development Company Inc. is part of the 2,250-acre Grande Valley Industrial master planned area approved last year. AZBEX was the first outlet to report on the master plan. (AZBEX; Oct. 15, 2024) A DATABEX project database update from last month reports LKY is looking for a buyer to purchase the Grande Valley Industrial site and take over development. The narrative for the Grande Valley Data Center Campus, prepared and submitted by Colliers Engineering & Design, says, "The Property is located within the Grande Valley Industrial area and is currently zoned General Industrial (I-2). If approved, the requested CUP will allow the development and operation of a data center campus with accessory on-site electrical generation and utility distribution infrastructure (the "Project"). The Project will provide digital infrastructure to meet growing computing demand and support technological and economic advancement at the regional and national levels. The Project has been designed with consideration for Arizona's arid climate and the importance of responsible resource stewardship, incorporating low- to zero ongoing water consumption cooling technologies, sustainable building practices, and low-emission/de minimis on-site electrical generation." The site is currently vacant and used for agricultural purposes, as is the land to the west. The Cactus Mine is situated to the north, while the Ivanhoe Mine lies to the east and south. The project will feature multiple data center buildings, on-site natural gas power generation and a battery energy storage system. The power component is planned as California-based Bloom Energy's first Arizona installation. The company has more than 1,000 installations around the U.S., according to a local news report. The narrative says, "The campus is designed to include dedicated on-site power generation to support each phase of development. Power will be supplied through a connection to the existing gas pipeline located directly adjacent to the southern boundary of the Property, which will provide fuel for the Project's on-site generation system. As currently designed, the campus is not anticipated to rely on a traditional electric grid connection for primary power service." The data centers will incorporate now-standard closed-loop cooling systems to minimize water use and environmental impacts. Development is planned in two phases. The article reported several members of the public and anti-data center activists spoke against the proposal. Opposition comments included concerns about water and power use, increased utility rates, community impact and project scale. The Commission voted 6-1 in favor of the CUP approval. LKY Development Company Inc. is the owner. Planning and entitlement are by Colliers Engineering & Design. Gammage & Burnham is the land use counsel.