G

GE Vernova

Builds equipment and software for electric power

Production Technician

Product AssemblyConfirmed live in the last 24 hours
Part-timeGrand Forks, ND, USA$22.88 - $27.50In-person

About the Job

Requirements

  • Ability to lift or carry objects or materials up to 40 pounds.
  • Ability to push and pull heavy objects.
  • Ability to stand for extended periods on concrete floors.
  • Ability to work with hands for an extended period.
  • Ability to operate basic hand tools, power tools, and heavy machinery.
  • Ability to work individually and as part of a team.
  • Must wear a respirator.

Responsibilities

  • Perform closing tasks according to work instructions.
  • Wear all required personal protective equipment and follow health and safety instructions regarding chemical usage.
  • Remove infusion bags from shells using a crane.
  • Transport shells from one mold to the closing area using a crane.
  • Repair, cut, and grind laminate defects.
  • Prepare shells for closure by vacuuming debris, side-grinding the flange area, applying brackets, and marking all areas.
  • Apply glue to the flanges and web after shells are repaired and prepared, and use a crane to lift the mold closed.
  • After the mold has been closed, remove the root plate and fasten the root ring to the root of the finished mold using stay bolts.

Desired Qualifications

  • Previous manufacturing experience.
  • Previous experience working with wind turbine blades or composites.

About the Company

GE Vernova

Builds equipment and software for electric power

GE Vernova makes equipment and software that generate and manage electricity for utilities, power producers, and industrial customers. Its Power, Wind, and Electrification businesses span gas turbines, wind generation, and the systems that move electricity across grids. The company supplies generators, grid equipment, and controls, while its software coordinates network operations and integrates changing sources of power. Customers buy equipment and enter service agreements for maintenance, upgrades, and technical support over its operating life, alongside purchases of software and related services. GE Vernova became an independent company in 2024 after separating from GE and is headquartered in Cambridge, Massachusetts.

Company size
10,001+
Company stage
N/A
Total funding
$17.6M
Headquarters
Cambridge, MA
Founded
2024

Recently Posted Jobs

Explore more opportunities at GE Vernova

See more jobs