C

Crusoe

Builds AI data centers near cheap energy

Senior Staff Commissioning Engineer - Electrical

Full-Time
$175k - $215k+ Bonus + Restricted Stock Units
Expert
Bachelor's
San Francisco, CA, USA+2 moreMore locations: Dallas, TX, USA | Denver, CO, USA
In PersonTravel to project sites is required 50% of the time.
Electrical Engineering

About the job

Requirements
  • At least 10 years of experience in data center commissioning, construction, or critical infrastructure delivery, including demonstrated ownership at the campus, region, and program levels.
  • A bachelor's degree in Electrical Engineering or a related field; equivalent commissioning experience is considered, and CxA certification is a plus.
  • Mastery of the full commissioning lifecycle from L0 through L6, including documentation, testing, and governance requirements at each phase.
  • Recognized subject matter expertise in electrical systems, including power distribution, EPMS, protection, and controls, with complete understanding of design, construction, and testing principles within the discipline, including power generation systems and their interaction with data center loads.
  • A proven track record developing, deploying, and governing commissioning programs, standards, and processes adopted across multiple projects or an organization.
  • Demonstrated commercial and contractual fluency in quoting, bid leveling, vendor scope and change order management, and program-level CxA performance management.
  • Experience managing and holding trade partners, CxAs, OEMs, and general, electrical, and mechanical contractors accountable to scope, schedule, and quality across concurrent projects.
  • Ability to present independently to senior leadership and clients and translate technical complexity into clear, data-driven business narratives.
  • A track record of mentoring and developing engineers, with measurable elevation of team performance.
  • Understanding of safety, compliance, and regulatory requirements within active construction and commissioning environments.
  • Willingness to travel to project sites as required, approximately 50% of the time.
Responsibilities
  • Provide high-level commissioning oversight and direction across multiple campuses, ensuring operational alignment, cohesive strategy, and exceptional client relations across the portfolio.
  • Drive consistency in commissioning execution across sites by identifying cross-project patterns, recurring issues, and systemic risks, and translating lessons learned into program-level change.
  • Represent Crusoe Commissioning in cross-functional governance forums, leadership reviews, and client-facing engagements, translating technical complexity into clear business impact.
  • Serve as the electrical systems discipline authority for high-impact, technically complex decisions shaping site outcomes, including energization readiness, acceptance testing, and risk-based deviations.
  • Act as the recognized escalation authority for complex technical issues across all project phases, resolving problems spanning disciplines, vendors, and project boundaries.
  • Own technical sign-offs across project boundaries and maintain customer communication that builds confidence in Crusoe's delivery.
  • Maintain comprehensive understanding of building systems, including power distribution, EPMS, controls, mechanical interfaces, and power generation systems and their interactions with data centers.
  • Own development and continuous improvement of the commissioning program by creating, piloting, deploying, and validating processes, standards, and governance documents, including the FWT program, deficiency management, and script library governance.
  • Conduct quality assurance audits and drive root cause analysis on systemic issues; establish frameworks for measuring and improving program quality.
  • Define standards across the L0–L6 lifecycle and drive adoption of improvements across the Crusoe portfolio.
  • Support commissioning quoting activities, leading financial accuracy, bid leveling, and strategic pursuit of new business.
  • Manage program-level CxA and vendor commercial outcomes, including scope development, change order review, and performance-based accountability.
  • Apply contractual and risk understanding in vendor negotiations and commissioning scope decisions to protect the business.
  • Manage and analyze trade partner and third-party commissioning agent execution to ensure high standards, accountability, and continuous improvement.
  • Set CxA performance expectations across the program and drive vendor accountability through structured performance management, deliverable tracking, and data-driven scorecards.
  • Build long-term, trust-based partnerships with key external partners, including clients, vendors, and OEMs, at senior level.
  • Coach and develop team members across the organization, helping bridge the gap between current and exceptional performance.
  • Mentor engineers across all levels, develop next-level talent, and elevate the team to a high performance standard.
  • Anchor calibration and growth conversations in specific, observable behaviors and build the technical bench needed to scale with company growth.
Desired Qualifications
  • CxA certification is a plus.

About the company

Crusoe builds and runs data centers for artificial intelligence, placing them near cheap or otherwise wasted energy and handling everything from the power supply to the cloud software. It developed the flagship campus in Abilene, Texas, for Stargate, the AI infrastructure project backed by OpenAI and Oracle. AI companies rent its GPU servers on demand or under longer contracts through Crusoe Cloud to train and run their models, while larger customers lease entire campuses that Crusoe develops and operates for them. The company was founded in 2018, when it began running computers at oil fields on natural gas that would otherwise have been burned off, and it is based in Denver.

Company Size

1,001-5,000

Company Stage

Series F

Total Funding

$13.8B

Headquarters

Denver, Colorado

Founded

2018

Get referred to Crusoe

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • Room to grow: Crusoe listed 358 open roles in October 2026, from cloud engineering to factory work.
  • Equity has a path to cash: Crusoe was meeting IPO banks, including Goldman Sachs and JPMorgan, in August 2026.
  • Steady work ahead: Crusoe reported over $140 billion in signed customer contracts in September 2026.

What critics are saying

  • Projects aren't safe until built: Google asked Crusoe to leave a 1.8-gigawatt Wyoming campus, then took over in July 2026.
  • The hard part is ahead: only 1 of the 6-plus gigawatts Crusoe had signed was running in September 2026.
  • Less upside for new hires: Crusoe's valuation hit $30.9 billion in September 2026, triple its October 2025 level.

What makes Crusoe unique

  • It makes its own electrical gear instead of waiting on suppliers: two Tulsa factories have built over 2,500 switchboards.
  • Its own MemoryAlloy software lets GPUs share memory, so AI answers start up to 9.9 times faster in Crusoe's tests.
  • Its power-ready land is in demand: Microsoft leased 900 megawatts at Abilene in March 2026 after OpenAI and Oracle passed.

Help us improve and share your feedback! Did you find this helpful?

Benefits

Industry competitive pay

Health insurance package options that include HDHP and PPO, vision, and dental for you and your dependents

Paid life insurance, short-term and long-term disability

Parental leave

Stock options in a fast-growing, well-funded technology company

Pet-friendly offices

Teladoc

401(k) with a 4% match

Unlimited time off

Cell phone reimbursement

Tuition reimbursement

Company paid commuter benefit; $100 per month

Calm

Growth & Insights and Company News

Headcount

6 month growth

2%

1 year growth

2%

2 year growth

2%
Yahoo Finance
Sep 23rd, 2026
Thinking Machines Lab signs $65M deal with Crusoe for AI inference infrastructure

Crusoe, a vertically integrated AI infrastructure provider, has signed a $65 million annual agreement with Thinking Machines Lab to power inference for the lab's open models on Crusoe Cloud. Through Crusoe Managed Inference, Thinking Machines Lab will serve production workloads including its Inkling models, GLM 5.2 and 5.3, on NVIDIA HGX B200 systems connected with NVIDIA Quantum-2 InfiniBand networking. The service enables Thinking Machines Lab to scale without managing its own inference stack. The companies plan to expand into batch inference for large-scale synthetic data generation. Thinking Machines Lab joins other clients that have taken Crusoe Managed Inference past $100 million in contracted annual recurring revenue less than a year from launch.

The Wall Street Journal
Sep 17th, 2026
The Startup That Built OpenAI’s Biggest Data Center Is Now Making Tiny Ones

Crusoe raised $3.9 billion at a valuation of nearly $31 billion, as it bets on factory-built data centers.

Yahoo Finance
Sep 15th, 2026
Crusoe signs multiyear Perplexity cloud deal for Nvidia AI chips

Crusoe has signed a multiyear cloud agreement to supply Perplexity with Nvidia AI chips for model training and inference, Bloomberg reported Tuesday. The deal's financial terms and capacity were not disclosed. Under the agreement, Crusoe will manage the technology throughout its operating life. More than 1,800 Crusoe employees will receive access to Perplexity's Enterprise Max product, which provides AI-powered search tools. The contract adds to Crusoe's growing cloud business, which recently secured a five-year agreement with Jane Street worth roughly $13 billion. In June, Crusoe reported 4.9 GW of contracted AI infrastructure capacity across its data centre projects and cloud platform, with a development pipeline exceeding 40 GW. Crusoe opened a 400,000-square-foot manufacturing plant in Tulsa, Oklahoma, on Monday.

Yahoo Finance
Sep 14th, 2026
Crusoe opens second Tulsa facility, doubles workforce to 300 for AI infrastructure manufacturing

Crusoe has opened its second manufacturing facility in Tulsa, Oklahoma, adding 400,000 square feet to its operations and bringing its national manufacturing footprint to roughly 1 million square feet. The AI infrastructure company has hired more than 300 local workers across its two Tulsa sites, up from the 100 initially expected when the first facility opened in 2024. The facilities produce electrical equipment for AI infrastructure, including medium-voltage switchgear, low-voltage switchboards, electrical enclosures, industrial controls, and custom-fabricated copper busbar. The company has supplied more than 2,500 switchboards to its Stargate Project site in Abilene, Texas. Crusoe now employs more than 1,800 people, with 15,000 skilled workers across its sites. The company manufactures components in-house to reduce production time and maintain quality control.

Bloomberg Law
Sep 3rd, 2026
Crusoe Raises Over $3 Billion in Round at $30 Billion Valuation

Crusoe, a cloud-computing provider and data center developer doing business with OpenAI, Microsoft Corp. and Meta Platforms Inc., has raised over $3 billion in a funding round that values the startup at roughly $30 billion, according to people familiar with the situation.