C

Crusoe

Builds AI data centers near cheap energy

Senior Engineer - Load Integration and Model Development

Power Systems EngineeringConfirmed live in the last 24 hours
Full-timeRemote in USARemote

About the Job

Requirements

  • A master's degree in Power Systems and at least 3 years of experience, or a bachelor's degree and at least 7 years of experience in Power Systems.
  • Deep experience in grid planning, system modeling, and grid code compliance studies.
  • Strong working knowledge of MISO/SPP transmission topology and load interconnection methodologies.
  • Ability to identify points of interconnection that offer a suitable path for interconnecting large-scale loads.
  • Technical report writing and verbal communication skills.

Responsibilities

  • Perform and support comprehensive grid integration studies for large-load facilities within MISO and SPP.
  • Manage transmission injection processes and perform load deliverability studies to ensure grid stability and capacity.
  • Strategize points of interconnection based on evolving business needs and changing regulatory requirements.
  • Contribute to the technical development of the team by sharing expertise and best practices in grid integration and ISO/RTO navigation.
  • Work with internal teams to draft technical specifications and support Business Development on the technical aspects of project proposals.
  • Identify points of interconnection that suit business development needs while monitoring grid code compliance and transmission topology changes.

Desired Qualifications

  • Experience with other ISO/RTO markets, such as CAISO, ERCOT, WECC, or SERC.
  • Proficiency with power system simulation tools such as PowerWorld Simulator, ETAP, TSAT, or ASPEN OneLiner.
  • Working knowledge of scripting languages such as R or Python for data analysis and automation.

About the Company

Crusoe

Builds AI data centers near cheap energy

Crusoe builds and runs data centers for artificial intelligence, placing them near cheap or otherwise wasted energy and handling everything from the power supply to the cloud software. It developed the flagship campus in Abilene, Texas, for Stargate, the AI infrastructure project backed by OpenAI and Oracle. AI companies rent its GPU servers on demand or under longer contracts through Crusoe Cloud to train and run their models, while larger customers lease entire campuses that Crusoe develops and operates for them. The company was founded in 2018, when it began running computers at oil fields on natural gas that would otherwise have been burned off, and it is based in Denver.

Company size
1,001-5,000
Company stage
Debt Financing
Total funding
$14.5B
Headquarters
Denver, CO
Founded
2018

Recently Posted Jobs

Explore more opportunities at Crusoe

See more jobs