Document Controller
Start Campus
Document Controller
Start Campus
Operates AI-ready HPC data campus infrastructure
As a Document Controller, you will play a critical role in managing and safeguarding all technical, design, construction, and compliance documentation across a fast-growing hyperscale data center program.
You will ensure that every drawing, model, report, specification, contract, and change document is accurate, traceable, and aligned with strict internal, client, and regulatory requirements. You will act as the gatekeeper of the project’s single source of truth, enabling coordination across engineering, construction, commissioning, quality, operations, consultants, and contractors.
This role is essential to maintain transparency, compliance, and governance as we expand our portfolio and scale our project delivery capabilities.
Key Responsibilities
Document Management
System Administration & Tools
Project Coordination
Quality & Compliance
Requirements
Strongly Preferred
Equal Opportunity Employer:
Start Campus is an equal opportunity employer. We are committed to building a diverse, inclusive and respectful workplace where everyone feels they belong and can thrive.
We make hiring decisions based on merit, experience, skills and potential, and do not discriminate on the basis of race, ethnic origin, religion, gender, gender identity or expression, sexual orientation, age, disability, marital status, nationality, or any other characteristic protected by applicable law.
Personal data submitted as part of your application will be processed in accordance with our Privacy Policy.
If you think you have what it takes for this position and are looking for a new professional challenge send your application.
Operates AI-ready HPC data campus infrastructure
Start Campus operates the SINES Data Campus in Sines, Portugal, delivering AI-ready infrastructure for high-density workloads such as HPC and cloud. It provides powered-shell, turnkey and build-to-suit data-center solutions with global connectivity, using 100% renewable energy and seawater cooling on a repurposed power-station site to reach a PUE of 1.1 and a WUE of 0. Its master plan envisions up to 1.2 GW of capacity, with SIN01 live at 37.5 MW and SIN02 planned at 200 MW, and it pursues large GPU deployments through partnerships like its expanded collaboration with Nscale and Microsoft. The goal is to offer scalable, sustainable, AI-ready infrastructure and enable large-scale GPU compute deployments through strategic partnerships and rapid capacity expansion.
Explore more opportunities at Start Campus