S

STV

Infrastructure engineering and design consultancy

Geotechnical Lab and Field Services Intern

Winter 2026Posted on 10/26/2026
$50.2k - $57.1k
Internship
Bachelor's, Master's
Glasgow, KY, USA
HybridHybrid position requiring at least 3 days per week in the office; occasional out-of-town stays may be required for drilling operations.
Architecture & Civil EngineeringGeotechnical Engineering
No H1B Sponsorship

About the job

Requirements
  • Currently pursuing a bachelor's or master's degree in Geotechnical Engineering, Civil Engineering, or a related field at an ABET-accredited university or NCEES equivalent.
  • Must be able to lift 50 pounds while assisting with day-to-day laboratory and field services operations.
  • Drilling operations may require out-of-town stays.
Responsibilities
  • Perform soil and rock laboratory testing in accordance with the respective American Association of State Highway and Transportation Officials and American Society for Testing and Materials methods.
  • Support engineering staff in developing geotechnical investigation report deliverables, including boring layouts, laboratory data compilation, and initial site research.
  • Assist in the field with materials testing, geotechnical drilling support, and sample pickup and delivery as needed.
  • Perform field work in various weather conditions and around significant construction equipment, with exposure to dirt, grease, and oils.
  • Walk over varied terrain, from low-lying swampy areas to mountainous, rugged terrain, and spend significant time bending or kneeling each day.
Desired Qualifications
  • Knowledge of Geotechnical Data Reports.
  • Experience with PLAXIS 2D and 3D and ITASCA software, including FLAC 2D and UDEC.
  • Experience in rock and soil logging, rock tunnel mapping, and subsurface investigations.
  • Experience in the architecture, engineering, and construction management industry.

About the company

STV provides professional services for the infrastructure that keeps society running. It designs, engineers, and manages projects in transportation systems, building design, water systems, and other essential infrastructure for public and private clients. Its work combines multidisciplinary expertise to plan and deliver infrastructure projects that meet local needs, using national knowledge to solve local challenges. Unlike firms that specialize in a single area, STV offers a full range of services across the project lifecycle—from planning and design to delivery and construction management—across multiple sectors. Its goal is to make communities better both now and in the future by delivering reliable, well-planned infrastructure.

Company Size

1,001-5,000

Company Stage

N/A

Total Funding

N/A

Headquarters

Pennsylvania

Founded

1912

Get referred to STV

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • Dallas ISD's $6.2 billion bond program should drive multi-year PMO and controls demand.
  • Edmond's 40,000-connection lead-pipe program and MTA Hudson Line design win expand 2026 backlog.
  • Recent rail systems hires and the CHAMPS acquisition position STV for electrification and resilience spending.

What critics are saying

  • STV depends on public owners like MTA, Dallas ISD, and Edmond for 2026-2037 revenue.
  • Fixed-fee megaproject work will compress margins when scopes change, especially before 2029 construction starts.
  • CHAMPS integration can distract leadership while transit and education commissions stay politically and budgetarily fragile.

What makes STV unique

  • STV sells integrated rail, water, and program-controls execution, not standalone design.
  • Its 2026 hires deepen CBTC, signaling, and project-controls expertise for complex public megaprograms.
  • CHAMPS acquisition adds substation engineering, expanding STV beyond transportation into utility power.

Help us improve and share your feedback! Did you find this helpful?

Benefits

  • Health Savings Account/Flexible Spending Account
  • Health Insurance
  • Dental Insurance
  • Vision Insurance
  • Disability Insurance
  • Life Insurance
  • 401(k) Plan
  • Retirement Counseling
  • Employee Assistance Program
  • Paid Time Off
  • Paid Holidays
  • Back-Up Dependent Care

Company News

STV
Oct 22nd, 2026
First battery-electric trainset arrives in Chicago.

First battery-electric trainset arrives in Chicago. Published October 22, 2026 STV's team recently joined Metra and transit industry leaders at the American Public Transportation Association (APTA) TRANSform & Expo for the unveiling of the agency's first battery-electric multiple unit (BEMU) trainset, giving attendees a first look at the vehicle being developed for one of North America's first battery-electric commuter rail programs. The unveiling offered APTA attendees a first look inside the new train, which runs entirely on battery power and can travel an estimated 45 to 50 miles on a single charge. For the STV team supporting the program, it also made visible years of procurement, engineering review, manufacturing quality oversight and other technical work required to introduce battery-electric technology into commuter rail operations. "This is the first chance for many people to see the train up close. For the team behind it, it makes years of work tangible as we help prepare this new technology for future service," said Austin Longshore, senior project manager for STV in Chicago and a member of the vehicles team. STV is supporting Metra with the interconnected vehicle, testing and infrastructure requirements needed to prepare the trainsets for future operations. The team's work spans procurement and design reviews through manufacturing quality and testing oversight, while helping Metra plan for the charging infrastructure the new fleet will require. Battery-stored energy will power the trainsets, with each train featuring a centrally located power car housing the battery propulsion energy storage system. STV's work also includes assisting Metra with charging requirements for this new fleet and collaborating on its infrastructure strategy to support and maintain future BEMU operations on the Beverly Branch. Stadler Rail, the BEMU's manufacturer, also highlighted the partnership that helped bring the trainset to fruition. "I'd like to thank STV as the consultant who collaborated with us to bring a quality product here to APTA," said Sebastian Traechsel, commercial project manager at Stadler Rail. "Seeing the train here at APTA makes years of planning and collaboration tangible, while marking another step toward future service in the Chicago region," Longshore said. "Battery power gives agencies a new way to think about how they provide cleaner, more efficient rail service while maintaining the flexibility their networks demand."

STV
Oct 15th, 2026
STV strengthens transportation leadership with three SVP promotions.

STV strengthens transportation leadership with three SVP promotions. Published October 15, 2026 NEW YORK, NY - STV today announced the promotion of Iris Giboyeaux, Alexander Houseal and Rafael Ruffo to senior vice president, reinforcing leadership across project delivery, engineering and operations as transportation agencies throughout New York, New Jersey and Pennsylvania advance increasingly complex infrastructure investments. Together, these three leaders collectively bring decades of experience across project delivery, transportation engineering and operational leadership. Their work supports some of the region's most significant infrastructure initiatives while helping clients address growing demands for resilient, efficient and connected networks. "Transportation agencies are being asked to deliver larger, more complex programs on tighter schedules than ever before," said Marcos Díaz González, regional transportation president at STV. "Iris, Alex and Rafael consistently help clients navigate that complexity while building stronger teams and delivering critical infrastructure. Their leadership will be instrumental as we continue to support the next generation of transportation investments across the Northeast." In their expanded leadership roles, Giboyeaux will drive project operational excellence and performance across STV's local transportation teams throughout the North Region; Houseal will advance transportation engineering operations and growth throughout Pennsylvania and New Jersey; and Ruffo will lead integrated design and construction delivery for projects across New York. The appointments support STV's continued focus on accelerating growth across key markets, expanding technical expertise and strengthening client partnerships. About STV. STV is one of the top infrastructure-focused professional services firms in North America. Founded in 1912, STV advises, plans, designs, engineers and delivers the infrastructure that powers local economies, including transportation systems, buildings, water and other facilities. The company has more than 65 offices and 3,400 employees who reimagine the solutions and structures that connect its communities. The firm is ranked 32nd in Engineering News-Record's Top 500 Design Firms survey and is 10th in its transportation category. Learn more at stvinc.com.

STV
Sep 28th, 2026
STV promotes Craig Phelps to lead project controls strategy.

STV promotes Craig Phelps to lead project controls strategy. Published September 28, 2026 FRANKLIN, TN - STV today announced the promotion of Craig Phelps to vice president, project controls director, where he will lead strategies that support both design and project management efforts that enhance financial and operational oversight. The promotion strengthens STV's ability to deliver integrated project controls solutions as infrastructure grows in scale and complexity, with 37% of engineering and construction leaders reporting missed budget or schedule targets due to ineffective risk management. "Project controls are becoming a strategic function that helps owners make faster, more confident decisions throughout the life of a program," said John Dumas, senior vice president, project controls at STV. "Craig's experience bridging project delivery, technology and operational performance positions us to deliver greater predictability for clients managing complex infrastructure investments." Phelps brings more than 25 years of experience developing, implementing and managing project systems across the full lifecycle of a project. His expertise spans project planning, work breakdown structure development, budgeting, earned value management, document management, team coordination and performance reporting for large-scale infrastructure programs. Phelps earned a Bachelor of Science degree in business administration and management from California State University, Fullerton. STV's project controls team integrates cost, schedule and risk management into a unified delivery strategy to improve project performance and predictability. Comprised of specialists in scheduling, estimating, cost engineering, risk management, document control, procurement and value engineering, the team's key projects include the New York Police Academy, the Delta Sky Way Program at Los Angeles International Airport and the MBTA's Green Line Light Rail Extension in Boston. About STV. STV is one of the top infrastructure-focused professional services firms in North America. Founded in 1912, STV advises, plans, designs, engineers and delivers the infrastructure that powers local economies, including transportation systems, buildings, water and other facilities. The company has more than 65 offices and 3,400 employees who reimagine the solutions and structures that connect its communities. The firm is ranked 32nd in Engineering News-Record's Top 500 Design Firms survey and is 10th in its transportation category. Learn more at stvinc.com.

STV
Sep 24th, 2026
STV, City of Edmond launch lead pipe replacement initiative.

STV, City of Edmond launch lead pipe replacement initiative. Published September 24, 2026 The program covers 40,000 water supply connections serving approximately 100,000 residents. OKLAHOMA CITY, OK - STV today announced the City of Edmond, Oklahoma, has selected the firm to lead a program to replace aging lead pipes and protect drinking water under the EPA's 2024 final Lead and Copper Rule Improvements (LCRI). The program will cover 40,000 water supply connections serving nearly 100,000 residents and will be conducted over a three-year period starting in 2026. Building on the city's service line inventory completed in October 2024, STV and teaming partner Carollo Engineers will develop replacement plans, update sampling programs and advance public education efforts. The team will use advanced GIS mapping and predictive modeling to prioritize areas based on pipe age, materials, neighborhood characteristics and historic water quality data, among other factors. "Edmond is taking decisive action to protect public health and its water system," said John Bannen, water/wastewater senior operations manager at STV. "This initiative goes beyond replacing pipes and reflects a commitment to transparency, trust and long-term water safety." LCRI requires cities to begin replacing old lead pipes that connect homes and businesses to the water system by 2027 and be completed by December of 2037, as these pipes can allow harmful metals into drinking water, a risk especially dangerous for children. With more than 80 childcare facilities and 27 schools in Edmond's service area, updated sampling plans will include stricter monitoring protocols for homes, schools and childcare facilities to ensure compliance and protect vulnerable populations. STV will also develop a replacement plan designed to minimize disruption in historic neighborhoods and underserved areas. STV will also lead a comprehensive public engagement program that includes proactive communication with affected households, coordinated outreach to schools and childcare facilities as well as regular updates on inventory status and replacement schedules. Residents will have access to multilingual resources, neighborhood workshops and a digital portal for real-time updates. This work positions Edmond to meet EPA's LCRI deadlines to submit its replacement plan by 2027 and complete all lead service line removals by 2037. Supported by federal funding through the Infrastructure Investment and Jobs Act (IIJA) and additional allocations from Oklahoma's Drinking Water State Revolving Fund, the initiative ensures cost-effective implementation for taxpayers. For more than 45 years, STV has delivered integrated management strategies for water, wastewater, water resources and resource recovery projects for clients nationwide and is ranked 18th for Water Transmission Lines and Aqueducts in Engineering News-Record's Top 500 Design Firms. Key projects include the Second Atoka Pipeline in Coalgate, OK, the award-winning Vista Ridge Regional Supply Project in San Antonio, Texas; the Owasso Wastewater Treatment Plant in Owasso, Oklahoma; the Walnut Hill Pump Station in Dallas, Texas and the Red Hook Wastewater Resource Recovery Facility in New York City. About STV. STV is one of the top infrastructure-focused professional services firms in North America. Founded in 1912, STV advises, plans, designs, engineers and delivers the infrastructure that powers local economies, including transportation systems, buildings, water and other facilities. The company has more than 65 offices and 3,400 employees who reimagine the solutions and structures that connect its communities. The firm is ranked 32nd in Engineering News-Record's Top 500 Design Firms survey and is 10th in its transportation category. Learn more at stvinc.com.

FingerLakes1.com
Sep 24th, 2026
MTA awards $19.7 million design contract for Hudson Line flood protections.

MTA awards $19.7 million design contract for Hudson Line flood protections. * September 24, 2026 4:05 AM * Staff Report The Metropolitan Transportation Authority has awarded a $19.7 million design contract for work intended to protect a vulnerable stretch of Metro-North's Hudson Line from flooding, runoff and mudslides. The planned improvements would cover rail infrastructure between Spuyten Duyvil and Hastings-on-Hudson, including a segment used by 25,000 Metro-North riders on a typical weekday. Gov. Kathy Hochul announced the award during Climate Week. It advances a $270 million project within a broader $800 million Hudson Line resilience effort in the MTA's 2025-2029 capital plan. The contract pays for design, not completed construction; the MTA expects construction to begin in 2029. The project reaches beyond New York City into the lower Hudson Valley. The line runs along the Hudson River, with steep slopes to the east. Heavy rain can send water and debris toward the tracks, while high tides and coastal flooding threaten the shoreline side. The MTA said recent floods and mudslides have disrupted service on the corridor, which also carries Amtrak and freight trains. Geographic Reference Drainage, slopes and shoreline in the design. The design work will address retaining walls and slopes, expand culverts and drainage along the tracks, rehabilitate shoreline structures and consider flood protection for tracks where feasible. Those are different defenses for different sources of water: runoff from the slopes, river-side flooding and drainage failures along the right of way. Discover more News Article Syndication Engineering firms STV and WSP will carry out the design as a joint venture. The project will also produce a resilience blueprint to guide future investments elsewhere on the Hudson Line, according to the governor's office. The MTA tied the work to vulnerabilities identified in its 2024 Climate Resilience Roadmap and repair needs in its 2025-2044 Twenty-Year Needs Assessment. The announcement describes the broader effort as focused on a 20-mile stretch from Riverdale to Croton-Harmon, while the newly awarded design contract centers on the more specific Spuyten Duyvil-to-Hastings-on-Hudson segment. The $270 million project figure is the planned project scope; $19.7 million is the design award. Neither figure means the protective construction has already been finished. MTA Construction & Development President Jamie Torres Springer said the contract is a step toward safeguarding service rather than an end to the line's weather risks. Metro-North President Justin Vonashek said the railroad is taking a series of steps to protect the corridor over time. Earlier work and another project in design. The Hudson Line has already received more than $400 million in resilience work since Superstorm Sandy, the MTA said. That work improved power, communications and signal systems along a 30-mile section from the Bronx to Croton-Harmon. The new project focuses more directly on the physical infrastructure that manages water and stabilizes the rail corridor. Discover more Regional Information Hub Streaming Content Access Local News A separate $20 million project between Glenwood and Greystone stations is also in design. Funded in the state's 2025 budget, it is intended to stabilize steep slopes and improve stormwater infrastructure. Senate Majority Leader Andrea Stewart-Cousins, who helped secure that funding, said the work responds to concerns from communities that depend on the line. Hastings-on-Hudson Mayor Thomas Drake said the design award moves forward protections for riders and communities exposed to runoff and tidal flooding. The MTA has not announced a completion date for the new construction; for now, the engineering work and the expected 2029 construction start are the next stated milestones. FingerLakes1.com is the region's leading all-digital news publication. The company was founded in 1998 and has been keeping residents informed for more than two decades. Have a lead? Send it to [email protected].