A

Arcadis

Global design, engineering, consultancy for assets

Construction Inspector/Construction Manager

Full-TimeUpdated on 10/23/2026
$85k - $115k
Senior
Bachelor's, Associate's
Columbus, OH, USA
In PersonThe initial assignment is in Coshocton, Ohio; onsite presence is required for most of the approximately two-year construction phase.
Architecture & Civil EngineeringConstruction Management

About the job

Requirements
  • A minimum of 5 years of experience as a Resident Engineer or Construction Manager, with at least 2 years of water/wastewater facilities experience or similar experience.
  • An associate's degree in engineering, construction management, or a closely related field of study.
  • 10- or 30-hour OSHA Construction Safety Training.
  • Experience with the Microsoft Office Suite, particularly Outlook, Word, Excel, and Teams.
  • Experience with scheduling software such as Primavera P6 Professional Project Management and/or Microsoft Project.
  • Experience managing construction budgets and schedules, cost estimating, and change order negotiation.
  • Experience with construction document management software.
Responsibilities
  • Lead the construction phase of the assigned digester improvements project and be onsite for most of its construction duration while overseeing construction management tasks.
  • Monitor contractor, subcontractor, and supplier performance and overall site safety, and regularly relay issues, plan changes, and deviations to clients.
  • Observe and inspect wastewater construction work performed by contractors and conduct punch list inspections.
  • Review drawings, specifications, and other technical documents; prepare detailed daily activity and progress reports; and participate in project schedule and contractor invoice reviews.
  • Maintain quality assurance requirements and monitor code compliance issues.
  • Inspect work for deviations from general compliance with Contract Documents and clearly and professionally inform contractors of required corrections.
  • Attend and participate in construction, safety, and project site coordination meetings.
  • Monitor and document contractor labor, materials, and equipment utilization for field changes and time-and-material work, and assist with negotiating basic field construction changes.
  • Apply knowledge of cost trends, change management, claims, and other construction-related matters to support project delivery while maintaining company standards and specifications.
  • Lead and conduct progress, project, safety, scheduling, and other contract administration meetings with clients, contractors, local agencies, and the community.
  • Recommend improvements to reduce project costs or shorten schedules.
  • Review and process contractor submittals, shop drawings, requests for information, and change orders.
  • Liaise with design staff to obtain field information and answer design questions through contractor requests for information.
  • Serve as the communication and coordination focal point among the general contractor, owner, and engineer.
Desired Qualifications
  • A bachelor's degree in engineering, construction management, or a closely related field of study.
  • Client experience and knowledge in the greater Columbus area.
  • Active participation in a regional or national professional association.
  • Construction-related credentials such as Certified Construction Manager (CCM).
  • Professional Engineer or Engineer-in-Training certification with intent to earn Professional Engineer licensure.
  • Inspection certifications such as AWS/CWI, ICC, ACI, and/or NACE.
  • Confined Space Entry Training.

About the company

Arcadis is a global design, engineering, and consultancy firm that creates and manages natural and built assets. It operates across the Americas, Europe, the Middle East, and the Asia Pacific, serving governments, public agencies, and private companies. Its four business areas—Places, Mobility, Resilience, and Intelligence—cover sustainable buildings and urban development, transportation infrastructure, climate adaptation, and data-driven digital solutions to optimize asset performance. The company earns fees for its integrated services that combine planning, design, engineering, and advisory work. Arcadis differentiates itself through its global reach and its integrated, multi-disciplinary approach that links physical design with data analytics and digital insights to deliver high-value solutions. Its goal is to help clients create and maintain sustainable, resilient, and efficient assets while improving decision-making and performance across complex projects.

Company Size

10,001+

Company Stage

IPO

Headquarters

Watermael-Boitsfort, Belgium

Founded

1888

Get referred to Arcadis

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • Arcadis and Autodesk expanded collaboration on September 28, 2026, accelerating AI-enabled delivery.
  • Virginia Beach picked Arcadis for the Windsor Woods pump station on September 30, 2026.
  • Arcadis targets mid-single-digit growth and mid-to-high-teens EBITDA by 2029.

What critics are saying

  • Arcadis will divest most architecture and China, risking revenue loss and integration distraction.
  • Management cut 1,000 FTEs for 2027 after 1,100 2025 cuts, signaling chronic margin weakness.
  • WSP's September 2026 takeover approach shows Arcadis remains a potential break-up target.

What makes Arcadis unique

  • Arcadis combines engineering judgment with Autodesk AI and MCP workflows, retaining client-owned knowledge.
  • Its resilience franchises win climate adaptation work, including Virginia Beach's 2026 flood-control program.
  • The firm spans design, consultancy, and environmental services across 30-plus countries.

Help us improve and share your feedback! Did you find this helpful?

Benefits

  • Hybrid Work Options

Growth & Insights and Company News

6 month growth

9%

1 year growth

10%

2 year growth

10%
Construction Buzz
Oct 22nd, 2026
Arcadis and Tetra Tech appointed to £519M irish Rail framework.

Arcadis and Tetra Tech appointed to £519M irish Rail framework. October 22, 2026 Arcadis and Tetra Tech have been appointed to a five-year Iarnród Éireann (Irish Rail) framework for rail infrastructure projects, which has an estimated value of up to £519M (€600M). The joint venture is one of five selected suppliers on the Multi-Party Framework for Project MDC PMP Phases 1-5. The framework will run for five years, with the option of three one-year extensions. It will provide access to opportunities to deliver advisory and design services across all stages of the project lifecycle and support delivery of the All Island Strategic Rail Review. Arcadis and Tetra Tech, alongside supply chain partners including Idom, will provide design and engineering, environmental, advisory, programme management and project management services. The framework will support projects aimed at decarbonising transport, improving connectivity and accessibility, and developing a more sustainable and integrated transport system. The programme is intended to help transform Ireland's rail network by providing faster, more reliable and accessible services. It will also support decarbonisation through electrification, making rail a more attractive alternative to private car travel. Arcadis and Tetra Tech were selected following an evaluation process that highlighted "the joint venture's expertise, local knowledge and track record in delivering complex rail programmes", said a statement for the firms.

Yahoo Finance
Oct 13th, 2026
GDS Associates appoints Gary Cooley as Chief Financial Officer.

GDS Associates appoints Gary Cooley as Chief Financial Officer. MARIETTA, Ga., October 13, 2026-(BUSINESS WIRE)-GDS Associates, Inc. ("GDS" or the "Company"), a leading provider of power consulting and advisory services to the U.S. utility industry, today announced that Gary Cooley has joined the Company as Chief Financial Officer. In this role, Mr. Cooley will lead GDS' financial, accounting, and operations management functions. Mr. Cooley brings more than three decades of financial leadership experience across engineering, consulting, and advisory firms. Most recently, he served as Chief Corporate Development Officer and CFO of Anser Advisory, where he oversaw the firm's financial management and led its mergers, acquisitions, and integrations, including its acquisition by Accenture. "Gary has spent his career successfully scaling professional services firms with discipline and steady leadership, and we are pleased to welcome him to the team," said Miki Deric, CEO of GDS. "His track record of executing and integrating acquisitions, along with his broader financial acumen, will be instrumental to GDS' ability to invest in our people, broaden the services we provide to our clients nationwide, and create new growth opportunities." "GDS has built a business with a tremendous reputation for technical excellence, reflecting the strength and dedication of its team," said Mr. Cooley. "I look forward to working alongside Miki and the entire team to build on that legacy and execute on the opportunities for growth at GDS." Earlier in his career, Mr. Cooley spent a decade at Arcadis North America, first as division CFO and later as Senior Vice President of Corporate Development, where he oversaw strategic partnerships, acquisitions, and divestitures. Previously, he was CFO and a board member of PinnacleOne, which he helped lead through its sale to Arcadis. He holds an MBA from San Diego State University and a bachelor's degree in finance from the University of San Diego. GDS has taken multiple strategic steps over the past year to expand capabilities, enhance client service, and broaden service offerings. In September 2026, GDS named Miki Deric as CEO, and in April 2026, Daniel Powers joined as Chief Development Officer to lead the Company's acquisition strategy. Earlier this year, GDS partnered with Littlejohn & Co. to support the Company's long-term growth strategy. About GDS Associates Founded in 1986, GDS Associates is a consulting and engineering firm dedicated to serving the electric utility industry. GDS provides advisory and technical services supporting planning and analysis, rates and regulatory strategy, energy efficiency, and transmission and distribution engineering. Headquartered in Marietta, Georgia, with offices across the United States, GDS is recognized for its technical expertise, integrity, and collaborative culture. Learn more at www.gdsassociates.com.

The Construction Index
Oct 12th, 2026
Egis UK & Ireland picks energy director.

Egis UK & Ireland picks energy director. 1 hour Egis UK & Ireland has appointed Mark Docherty as energy director, with a focus on the grid and renewables. Docherty joins from Arcadis. Based in Edinburgh, Docherty brings 38 years of experience in the energy sector. At Arcadis, he was global offshore wind practice lead and partner, as well as UK sector leader for networks and energy. He has also held senior leadership roles at several key industry players, including Turner & Townsend, SSE and Scottish Power. In his new role, Docherty will lead the expansion of Egis's energy offering across the UK and Ireland, while helping to support the firm's wider global energy ambitions. Covering grid and renewables, he will focus on building team capacity and supporting clients and communities through the challenges of energy transitions, electrification, digitalisation and security of supply. Docherty's appointment comes as governments and network operators across the UK and Ireland place greater priority on energy security, increasing demand for grid and renewables expertise. Joanne Moran, sustainable resources director, UK & Ireland, said: "Energy is an important part of our business in the UK and Ireland, and Mark's appointment gives us the leadership to accelerate its growth. His experience across offshore wind, networks and major infrastructure programmes will strengthen the support we offer our clients, while his strong track record of building teams and securing new business will be central to our plans."

BD Online
Oct 6th, 2026
Arcadis to sell most of its architecture business and cut 1,000 staff following WSP's failed takeover bid.

Arcadis to sell most of its architecture business and cut 1,000 staff following WSP's failed takeover bid. World's third biggest employer of architects to focus on sectors 'where structural demand is strongest' The Curv, a 60-storey passivhaus tower in Vancouver designed by Arcadis' architecture business Arcadis is planning to sell most of its architecture business and cut 1,000 full-time staff from its wider business as part of a restructure following a failed takeover bid by WSP. The consultant said it is "actively changing its portfolio" by concentrating investment in sectors and markets where "structural demand is strongest". Arcadis is currently ranked as the world's third biggest employer of architects, with 1,781 architects on its payroll out of a total headcount of around 34,000, according to this year's WA100 list of the world's biggest practices. It claimed its "rightsizing" strategy will see mid-single-digit revenue growth and increase its operating EBITDA margin by around 100 basis points to approximately 14.5% by 2027-2029. Arcadis unveiled plans for the restructure in its home city of Amsterdam at the end of last month, just a week after WSP formally abandoned its intended takeover of the firm. WSP said on 23 September that it had been "unable to engage" with Arcadis after having two bids that valued the Dutch consultant at around £3.8bn turned down over the summer. Sectors which Arcadis said it wants to focus on include transportation and energy and water, which account for a combined 53% of net revenues. It is targeting net revenue growth of mid to high single digits for transportation and high single digits for energy and water. The firm is also seeking high single digit growth in high-growth sectors such as industrial manufacturing and technology, which account for 21% of revenues. The sector includes data centres, life sciences and semiconductor manufacturing. But it plans to divest "non-core" assets including the majority of its architecture business and China operations including its activities in real estate and development, which account for 26% of its net revenues. Arcadis chief executive Heather Polinsky said the restructure is "designed to translate our strategic strengths into stronger growth, higher margins and cash generation". "We are building a more focused, higher-performing Arcadis that delivers sustainable value for shareholders, our people and our clients," Polinsky said. Chief financial officer Simon Crowe added: "The financial rationale is compelling: a more focused portfolio, a structurally lower cost base and disciplined capital allocation will support higher margins, stronger cash generation and sustainable shareholder returns." Arcadis' entry into the architecture sector stared with its acquisition of US practice RTKL in 2007, followed by its acquisition of Seattle-based Callison in 2014. It merged the two practices to form CallisonRTKL in 2015 with the business later referred to as CRTKL. Arcadis has long considered selling its architecture arm, first tabling the move in 2017 before recommitting to the sector before acquiring Canadian multi-disciplinary firm IBI Group in 2022. Arcadis then combined CRTKL and IBI Group to create its Architecture and Urbanism division. Most commented. No comments yet. You're not signed in.

Mexico Business News
Oct 5th, 2026
WIFA advances Northern Gulf of California Desalination project.

WIFA advances Northern Gulf of California Desalination project. By Fernando Mares | Journalist & Industry Analyst - Mon, 10/05/2026 - 13:27 DIA assistant The Water Infrastructure Finance Authority of Arizona (WIFA) approved the appraisal scope for the 1.7 million m[3]/d Northern Gulf of California Desalination Plant, a cross-border project in Baja California led by a Sacyr-headed consortium. This initiative establishes a binational water exchange mechanism to alleviate severe regional drought while bypassing rigid delivery constraints under the 1944 Water Treaty, which triggered tariff threats and diplomatic disputes during the 2020-2025 delivery cycle. The project directly impacts infrastructure developers, municipal water authorities, and agricultural producers across northern Mexico and the southwestern United States navigating transboundary water security. The Water Infrastructure Finance Authority of Arizona (WIFA) Board of Directors approved the appraisal scope for the Northern Gulf of California Desalination Plant project on Sept. 16, 2026, marking another step in Arizona's evaluation of potential long-term water augmentation opportunities. The proposed cross-border water infrastructure project is led by Spanish group Sacyr as a partner within the EPCOR Water Innovation Partners team, in consortium with Arcadis and Plenary Americas US Holdings. The proposed project entails the construction of a seawater desalination facility in Baja California, Mexico, alongside a conveyance pipeline connecting to the Morelos Dam at the Mexico-US border. Under the proposed operational structure, the project would integrate desalinated water into the Colorado River system for distribution within Mexico. In exchange, a portion of Mexico's designated Colorado River water allocation would be redirected to Arizona. Preliminary engineering estimates indicate that the system could supply Arizona with up to 1.7 million m[3]/d between 2034 and 2039. The proposal aims to provide long-term resource diversification for Arizona, where prolonged drought conditions continue to strain traditional water sources. "Arizona must continue exploring a range of potential water supply solutions to meet the needs of future generations. Approving this project appraisal scope allows us to deepen our understanding of this proposal while maintaining our commitment to a thoughtful, transparent, and financially prudent evaluation process," said Jonathan Lines, Board Chair, WIFA. Within the consortium structure, Arcadis will be the lead engineering firm, while Sacyr will oversee construction, operation, and maintenance. Financial development will be managed jointly by Sacyr and Plenary Americas. The proposal is among several projects reviewed under WIFA's Long-Term Water Augmentation Fund, following the Aug. 19, 2026, approval of the South Bay Potable Reuse and California Groundwater Recovery projects. WIFA utilizes a phased evaluation framework where the initial phase involves preliminary studies covering the technical, financial, environmental, cultural, and regulatory viability of the plant and pipeline. WIFA's approval authorizes only this early step to gather data and reduce uncertainty; future funding requests will be considered separately based on study results. Mexico-US Bilateral Water Challenges The push for alternative cross-border water delivery mechanisms comes as the underlying framework governing binational water sharing, the 1944 Water Treaty, faces heightened political and hydrological friction. Under the agreement, Mexico is required to deliver a minimum of 431.7 million m[3] of water per year over five-year cycles, totaling 2,158.6 million m[3] from the Rio Grande basin. However, persistent drought over the past years constrained availability, leaving Mexico at just 29.2% of its required delivery volume near the end of the 2020-2025 cycle, as reported by MBN. This shortfall sparked diplomatic tensions throughout 2025, with US President Donald Trump raising the prospect of tariffs and sanctions over pending deliveries, while Mexican President Claudia Sheinbaum urged diplomatic resolution and highlighted regional drought constraints. Bilateral discussions yielded temporary agreements in late 2025 and a commitment in February 2026 for Mexico to supply at least 432 million m[3] annually to ensure predictable delivery flows. A study by University of Michigan researchers Vianey Rueda and Andrew Gronewold published in the Journal of Water Resources Planning and Management notes that while the Colorado River framework has been dynamically adapted through subsequent negotiations, the treaty's Rio Grande provisions remain structurally rigid. Historical resimulations show that Mexico can only fulfill these fixed obligations without harming local communities during prolonged periods of above-average streamflow. As climate volatility and regional demand strain traditional river basins, flexible binational arrangements, such as the Sacyr-led desalination exchange at the Morelos Dam, offer a pragmatic model to decouple long-term water security from rigid historical treaty allocations.