T

T1 Energy

Battery cell producer for EVs

Senior Diffusion Process Engineer

Full-Time
No salary listed
Senior
Bachelor's, Master's, PhD
Austin, TX, USA
In PersonOccasional travel to the G2 facility may be required.

About the job

Requirements
  • Experience working in a clean room setting.
  • Strong understanding of thermodynamics, transport phenomena, vacuum systems, electron-hole physics including the Hall effect, and thin-film characteristics.
  • Deep experience with high-temperature (500 C+) high-volume manufacturing equipment using silicon or glass material inputs.
  • Experience with chemical characterization, crystal lattice chemistry, quantum field effects, and oxidation/reduction principles in gaseous environments.
  • Experience with III-V, GaAs, PERC, TOPCon, or other silicon-based solar cells.
  • A bachelor's degree or higher in Chemical Engineering, Materials Science, Electrical Engineering, Physics, or a related field.
  • At least 5 years of process engineering experience in semiconductor, photovoltaic, or advanced manufacturing environments.
  • Hands-on experience with high-temperature diffusion toolsets.
  • Strong working knowledge of ion implantation processes and diffusion thermal tools.
  • Experience with Design of Experiments methodology, statistical process control, micron-level physical inspection, and optical/electrical characterization.
  • Proficiency with Python, SQL, JMP, and Excel for process monitoring and optimization.
  • Strong documentation skills and experience reviewing Piping and Instrumentation Diagrams, leading change-order processes, writing standard operating procedures, process specifications, and engineering reports.
  • Ability to support a fab environment, including occasional travel to the G2 facility as needed.
Responsibilities
  • Support thermal doping process integration across the G2 solar cell fab while working with equipment, facility, quality, and yield engineering teams.
  • Drive process characterization, Design of Experiments execution, and data analysis to improve dopant uniformity and throughput.
  • Troubleshoot process excursions and equipment issues on diffusion tools and sub-inspection modules, identify root causes, and implement corrective actions.
  • Collaborate with equipment engineers and tool vendors to qualify new tool integrations, execute preventive maintenance reviews, and maintain process baselines.
  • Develop and maintain detailed process documentation, including recipes, standard operating procedures, and control plans.
  • Optimize process performance through statistical process control and lead original equipment manufacturer work-inspection development integration.
  • Support technology transfer from development to high-volume manufacturing, ensuring processes are robust, repeatable, and scalable.
  • Partner with core equipment engineering, material procurement, and manufacturing operations teams to meet cell-efficiency and production targets.

About the company

FREYR Battery makes battery cells for electric vehicles (EVs) and energy storage systems (ESS) using a Nordic supply chain and large-scale production in Mo i Rana, Northern Norway. The cells store chemical energy for repeated charge-discharge cycles and FREYR uses automated cathode casting to improve production efficiency and consistency, targeting longer cycle life, higher depth of discharge, better round-trip efficiency, and lower levelized cost of storage. Differentiators include a Nordic renewable-energy cluster and full regional supply chain that reduce costs, combined with scale and automation, plus plans to expand into the United States to broaden capacity and market reach. The goal is to provide high-quality, cost-effective battery cells for EVs and ESS while expanding production capacity and geographic reach with a focus on sustainability and profitability.

Company Size

201-500

Company Stage

IPO

Headquarters

Austin, Texas

Founded

2018

Get referred to T1 Energy

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • Clearway’s 641MW module contract validates T1’s domestic-content strategy in August 2026.
  • Statnett granted 50MW at Mo i Rana in March 2026, accelerating data center monetization.
  • Q2 2026 production hit 935MW, supporting management’s high-end full-year guidance.

What critics are saying

  • G2_Austin needs more debt after September 2026’s $50 million note bridge.
  • First Solar patent suits and ITC actions threaten TOPCon imports and Q1 2027 ramp.
  • If financing stalls or injunctions hit, T1 cannot finish Phase 1 and survives poorly.

What makes T1 Energy unique

  • T1 Energy controls U.S. solar manufacturing, from cells to modules, with G2_Austin.
  • Mo i Rana’s 50MW grid allocation lets T1 pivot into European AI data centers.
  • Acquired TOPCon intellectual property in 2026, cutting future licensing costs and dependence.

Help us improve and share your feedback! Did you find this helpful?

Benefits

Flexible Work Hours

Hybrid Work Options

Growth & Insights and Company News

Headcount

6 month growth

↑ 9%

1 year growth

↑ 3%

2 year growth

↓ -10%
Kalkine Media
Sep 29th, 2026
T1 Energy raises $50M in convertible notes to fund G2_Austin solar fabrication plant

T1 Energy has raised $50 million through convertible notes to fund its G2_Austin solar cell fabrication facility. The company entered into a note purchase agreement on 28 September 2026 for 4.75% Convertible Senior Notes due 2031, with expected gross proceeds of $50.4 million. The proceeds will finance construction and equipment purchases for Phase 1 of G2_Austin and general corporate purposes. Following this issuance, T1 Energy's total outstanding notes will reach $170 million. The notes carry an initial conversion price of approximately $4.46 per share and cannot be redeemed before 6 August 2029. They mature on 1 August 2031. The company described the funding as a bridge to a comprehensive financing solution for remaining capital expenditures.

Simply Wall St
Sep 10th, 2026
T1 Energy raises $160M at $4.96 per share, secures Norway data centre rezoning

T1 Energy raised approximately $160 million through a follow-on share sale at roughly $4.96 per share, shortly after securing rezoning approval for a potential data centre project in Mo i Rana, Norway. The company's share price has fallen 37.37% year to date and 42.03% over three months in 2026, despite delivering a one-year total shareholder return of 162.57%. The stock now trades around $4.91, well below the most followed analyst fair value estimate of $10.25 per share. Analysts point to US electricity demand growth driven by AI infrastructure, transport electrification, and manufacturing onshoring as key drivers for T1's solar modules and storage solutions business. However, the company faces risks from reliance on US policy incentives and intensive capital requirements for projects including G2_Austin.

Yahoo Finance
Aug 27th, 2026
T1 Energy gets approval to convert Norwegian facility into 50 MW data center

T1 Energy announced that local officials in Mo i Rana, Norway, have approved rezoning of part of its Giga Arctic facility for data center development. The company expects a 50 MW data center could become operational in 2027, with potential for expansion. T1 holds a position in the grid capacity queue for 396 MW total. The municipal committee approved a permit allowing 161,000 square feet of the campus to be rezoned for industrial use or data center operations. The site benefits from access to low-cost electricity supplied primarily by hydropower. T1 holds a 50-year lease on the location within an industrial park in northern Norway. The company is in discussions with multiple parties regarding the project as part of its value optimisation initiative for European assets.

Yahoo Finance
Aug 19th, 2026
Why Is T1 Energy (TE) Raising Fresh Capital Through A Follow On Offering?

T1 Energy (NYSE: TE) announced a follow-on equity offering, adding new shares to its existing stock base. The transaction is expected to affect the company’s capital structure and funding mix once completed. Management signaled that proceeds are intended to support T1 Energy’s next phase of growth and investment plans. This type of capital raise highlights how equity funding can reshape risk and return, and there are many other companies with similar exposure to consider through 79...

Yahoo Finance
Aug 13th, 2026
T1 Energy secures 641MW deal, raises $120M in convertible notes amid G2 Austin financing delays

T1 Energy reported second-quarter 2026 results, producing 935 megawatts of solar modules at its Dallas facility. The company posted a gross margin of 19.5%, up 300 basis points from the previous quarter, and adjusted EBITDA of $10.7 million. T1 Energy raised $120 million in August through convertible notes due in 2031. The company ended the quarter with $149 million in cash and equivalents. The firm secured a 641-megawatt supply agreement with Clearway Energy Group, adding to its existing 900-megawatt Treaty Oak contract. T1 Energy expects full-year production to reach the high end of its 3.1-to-4.2-gigawatt guidance range. Construction of the Austin facility remains on schedule, with first cell production expected in the first quarter of 2027. The company acquired Topcon intellectual property to eliminate future licensing costs.