V

Valar Atomics

Manufactures nuclear fission reactors for hydrocarbons

Construction Quality Inspector

Full-Time
$32 - $40/hr+ Equity ownership
Entry
Associate's
Orangeville, UT, USA
In Person
No H1B Sponsorship
US Citizenship Required

About the job

Requirements
  • A high school diploma or equivalent is required.
  • Ability to read and interpret basic engineering drawings, specifications, work instructions, and controlled documentation.
  • Strong attention to detail and organizational discipline, with willingness to operate within regulated procedural environments.
  • Ability to work in active industrial construction environments, including outdoor conditions, elevated structures, confined spaces, industrial noise, dust, vibration, and changing environmental conditions, while following all safety requirements.
  • Basic computer proficiency and ability to work within digital documentation and record management systems.
  • Flexible availability to support demanding project schedules, including extended hours, weekends, and field execution activities when required.
Responsibilities
  • Support inspection and verification activities across construction, fabrication, assembly, installation, testing, and controlled field execution operations.
  • Verify that construction activities are performed in accordance with approved drawings, specifications, procedures, travelers, work packages, and controlled documentation.
  • Assist with inspection hold points, witness points, turnover documentation, material traceability verification, and controlled work execution activities.
  • Maintain inspection records, verification documentation, traceability records, and quality documentation for completeness, accuracy, and audit readiness.
  • Identify and escalate discrepancies, missing documentation, workmanship concerns, material issues, and execution deviations to Construction Quality leadership.
  • Work directly with subcontractors, craft labor, engineers, and field personnel to support technically disciplined and operationally effective construction execution.
  • Support field walkdowns, documentation reviews, status verification, and controlled material identification activities.
  • Learn and apply construction quality standards, procedural requirements, traceability expectations, and inspection methodologies within regulated technical environments.
Desired Qualifications
  • Associate degree, technical certification, trade school training, military technical experience, or coursework in construction, engineering, manufacturing, welding, industrial technology, or related technical disciplines.
  • Prior experience supporting industrial construction, manufacturing, fabrication, field operations, quality inspection, or technical trades.
  • Familiarity with construction drawings, fabrication drawings, material traceability, inspection processes, or controlled work execution environments.
  • Experience working in nuclear, power generation, aerospace, semiconductor, defense, heavy industrial, or similarly regulated technical environments.
  • Mechanical aptitude and willingness to develop technical inspection and verification capability.
  • Familiarity with dimensional measurement tools, basic inspection equipment, and technical documentation systems.

About the company

Valar Atomics focuses on mass manufacturing nuclear fission reactors that are designed to synthesize abundant, low-cost hydrocarbons to power the global economy and lower energy costs. Its product concept combines a fleet of reactors with a chemical production pathway that uses the energy from fission to drive hydrocarbon synthesis, aiming to create a scalable, inexpensive energy and fuel supply. The company differentiates itself by pursuing an unproven commodities market tied to its reactors and hydrocarbon production, seeking to build a broad customer base across industries and economies in need of affordable energy. The short-term goal is to attract engineers and secure funding to advance development, with a longer-term objective of providing a sustainable and cost-effective energy solution at large scale.

Company Size

51-200

Company Stage

Debt Financing

Total Funding

$1.8B

Headquarters

El Segundo, California

Founded

2023

Get referred to Valar Atomics

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • NVIDIA partnership demoed reactor electricity powering a Blackwell system and a website in July 2026.
  • Project Beehive targets 9.6 gigawatts, matching Utah's grid-scale demand expansion by 2032.
  • DOE pilot programs accelerated Valar’s permitting path and fuel-supply work through 2026.

What critics are saying

  • The NRC has not approved Ward 250, blocking commercial deployment outside pilot frameworks.
  • Project Beehive faces BLM NEPA review, public opposition, and state-land negotiations through 2027.
  • Failure to secure NRC approval kills the fleet thesis and Valar's commercialization by 2030.

What makes Valar Atomics unique

  • Ward 250 reached criticality at Utah San Rafael Energy Lab on June 18, 2026.
  • Valar combines reactor manufacturing, fuel production, waste storage, and data centers in Project Beehive.
  • Sequoia’s August 3, 2026 round and Shaun Maguire board seat validate elite backing.

Help us improve and share your feedback! Did you find this helpful?

Benefits

Company Equity

Health Insurance

Meal Benefits

Growth & Insights and Company News

Headcount

6 month growth

↑ 2%

1 year growth

↓ -5%

2 year growth

↓ -3%
Data Center Dynamics
Oct 1st, 2026
9.4GW SMR-powered data center campus proposed in Utah.

9.4GW SMR-powered data center campus proposed in Utah. Valar Atomics aims to get first reactor live in 2028 October 01, 2026 Plans have been revealed for a multi-gigawatt data center campus powered by nuclear small modular reactors (SMRs) in Utah. First reported by NPR and the Salt Lake Tribune, Valar Atomics is planning a development known as Project Beehive on more than 9,000 acres of land held under the Bureau of Land Management near Price in Carbon County, some 199 miles southeast of Salt Lake City. The campus would include data centers and some 456 small nuclear reactors (SMRs), along with a facility to produce nuclear fuel and others for storing nuclear waste, according to a proposal from the company to federal regulators seen by NPR. The SMRs could potentially total 9.6GW of electrical capacity, and produce thermal heat for potential reuse. Construction could reportedly start as soon as the end of the year, with the first reactors coming online in 2028 and fully built out by 2032. Though multiple companies are working on their own designs, no company has yet put an SMR into commercial operation. Some 650 acres of the project would be state land, as well as federal land. Some details of Valar's proposals were included in a land use agreement shared in a recent Utah Trust Lands Admistration meeting. The Bureau of Land Management's Utah office confirmed it had received an application from the company. "We are currently reviewing the application for completeness," the bureau told NPR. As the application moves through the required National Environmental Policy Act process, "we will make sure the public has meaningful opportunities to provide input," it added. "No construction begins before permits and approvals, and the public process leads along our internal targets set the pace," Valar told NPR. Founded in 2023, Valar Atomics is developing a Generation IV high-temperature gas reactor (HTGR). Valar Atomics' 5MW advanced reactor design, Ward 250, completed a zero-power fueled criticality demonstration at the Utah San Rafael Energy Lab in Emery County in June. The company is aiming to deploy 25MW reactors at Project Beehive. In July, the company powered up the test reactor and used a simple thermoelectric system to run a single Nvidia GPU. Jurassic Spark. The Tribune also reported that Altigen Energy, which develops natural gas-power plants for data centers, is targeting an area east of Wellington for its 1,200-acre "Jurassic Spark" project. The site would initially feature 250MW of natural gas capacity, eventually scaling to 3GW. Wellington is a city in Carbon County, around six miles south of Price. Aligen filed an application for the project with Carbon County back in March. More in construction & site selection.

NPR
Sep 30th, 2026
Valar Atomics plans 456 reactors generating 9.6GW for data centre on Utah public land

Valar Atomics is planning to build a massive nuclear-powered data centre on over 9,500 acres of federal land in Utah. The project, called "Project Beehive," would include 456 small nuclear reactors producing around 9.6 gigawatts of power, along with facilities for fuel production and waste storage. The company aims to begin non-nuclear construction by year-end, with the first reactors online by 2028 and full completion by 2032. Valar's CEO Isaiah Taylor achieved a milestone in July when the company's test reactor produced electricity for the first time. Local activists have raised concerns about the unprecedented use of public lands for such a facility. The Bureau of Land Management confirmed receiving the application and said the public will have opportunities to provide input during the environmental review process.

WDC TV News
Sep 30th, 2026
Nuclear company plans reactor-powered data center on federal land: NPR.

Nuclear company plans reactor-powered data center on federal land: NPR. 6 4 minutes read A Valar Atomics microreactor is seen on a C-17 aircraft, without nuclear fuel, at March Air Reserve Base in California on Feb. 15. The reactor was transported from March Air Reserve Base to Hill Air Force Base in Utah. Matthew Daly/AP hide caption toggle caption Matthew Daly/AP A startup whose founder has vowed to "make nuclear great again" is planning to place hundreds of reactors on federal land in Utah, according to documents reviewed by NPR. Valar Atomics is planning what it calls "Project Beehive" on over 9,000 acres of land held under the Bureau of Land Management near Price, Utah. The facility would include data centers and some 456 small nuclear reactors, along with a facility to produce nuclear fuel and others for storing nuclear waste, according to a proposal from the company to federal regulators. In aggregate, the reactors would produce around 9.6 gigawatts of power for the data centers and even more thermal heat for other industrial applications. Currently, the entire state of Utah produces only around 4 gigawatts of electricity on average (though its peak capacity in summer can reach around 10 gigawatts). The project's timeline calls for nonnuclear construction to begin as soon as the end of this year, with the first reactors coming online sometime in 2028. Valar has also sought the use of around 650 acres of state land as part of the same project, according to state records. The Salt Lake Tribune first reported on the project's use of state land last week, but not the much larger proposed use of federal lands. The project has raised alarm among local activists, who are already facing a slew of data center proposals in the state. "It's concerning to see that the Trump administration, with the support of the state of Utah, is pushing this forward on significant acreage of public lands," said Neal Clark, wildlands director at the Southern Utah Wilderness Alliance, a Utah-based nonprofit that seeks to protect public lands. "The coalition of people who are concerned about these things completely transcends political lines," added Lexi Tuddenham, the executive director of the Healthy Environment Alliance of Utah, which has tracked nuclear-related industries in the state. Tuddenham said that at the moment her primary goal is to raise awareness. "The biggest thing we can do right now is to let people know about it."

Raw Story
Sep 18th, 2026
Locals blindsided by Trump's secretive plans for public lands: 'Unholy alliance'

Locals blindsided by Trump's secretive plans for public lands: 'Unholy alliance' September 18, 2026 7:23AM ET The Trump administration is quietly working to hand over vast stretches of America's public lands to billionaires and technology companies - and the scale is bigger than known, according to a Friday investigation by The Washington Sun. According to locals who would be affected, they have been kept completely in the dark. The Bureau of Land Management is reviewing at least "12 data center and infrastructure proposals covering more than 17,600 acres" across six Western states - Arizona, Idaho, Nevada, Oregon, Utah and Wyoming - the outlet reported, citing public right-of-way records. Many of the proposals have never been publicly disclosed and aren't easily found on BLM's own website. In Utah, nuclear startup Valar Atomics is reportedly pushing two data centers powered by small nuclear reactors, including a sprawling 10,200-acre site near Green River. Arizona has four proposed projects that could gobble up more than 3,000 acres of public land. The catch: local officials in several states told the Sun they had no idea the deals were even on the table, raising transparency concerns among conservation advocates. According to Lexi Tuddenham, executive director of HEAL Utah, an environmental advocacy group, no one saw this coming. "It's really, really hard to find information about this stuff, and I think it's representative of the way the industry in general is operating with a lack of transparency that I think is really deeply concerning," she told the Sun. "Both the AI industry and the nuclear industry, which seem to be in this unholy alliance right now." "If there are places where communities think it is appropriate to build data centers, focus on those," Aaron Weiss, director of the Center for Western Priorities, told the Sun. "The Trump administration needs to stop cutting the public out of public land management. The solution is more public notice and more opportunities for stakeholders to shape projects on the front end." It's the latest flashpoint in Trump's AI infrastructure push, which has already sparked fury after the administration moved to gut public comment periods on data center pollution permits. Polling shows 70% of Americans oppose data centers landing in their backyards, yet the buildout barrels forward, often in the dark. For customer support contact [email protected]. Report typos and corrections to [email protected].

Utah Business
Sep 4th, 2026
Utah's deep-tech companies take center stage.

Utah's deep-tech companies take center stage. Recent deals in AI, robotics, medtech and nuclear are pushing the state well beyond its software roots. // Sept 4, 2026 This story appears in the September 2026 issue of Utah Business. Subscribe. Utah's technology landscape continues to move beyond its traditional software roots, with recent investment activity highlighting the state's growing presence in artificial intelligence, robotics, healthcare technology, entertainment software and advanced nuclear energy. Xenter raises $58.25M to accelerate TechMed platform. Draper-based Xenter closed a $58.25 million Series B financing on June 30, which the company announced in July. The company is developing what it calls a TechMed platform at the intersection of medical devices, healthcare data, wireless connectivity and artificial intelligence. The financing attracted existing shareholders, family offices and healthcare-focused investors. The company plans to use the new capital to support the commercial launch of its diagnostics business, expand manufacturing, advance clinical and regulatory initiatives and continue development of its Physical Intelligence platform. Quantizr raises $5M to bring AI to live entertainment. Park City-based Quantizr announced a $5 million seed round led by TTV Capital, with participation from music industry veterans Jonathan Azu, Chris Kappy and Andy Levine. Quantizr is building an AI-powered financial operations platform for the live entertainment industry, automating many of the manual processes involved in managing tours, budgets, expenses, contracts and settlements. The company's approach is notable in an industry where much of the AI conversation has focused on concerns about replacing creative work. Rather than using AI to replace artists, Quantizr is applying the technology to the business infrastructure surrounding them, which allows managers and teams to spend less time on administrative work and more time supporting artists and live experiences. Peppy raises pre-seed to make robotics more accessible. Salt Lake City robotics startup Peppy closed a pre-seed financing led by Element Ventures, with participation from Rock Creek Capital, Mana Ventures and Colin Gardiner of Yonder. The company did not disclose the size of the round. Peppy is developing what its founders call the "Lovable for Robotics," a platform designed to make robotic programming dramatically more accessible. Users can provide text prompts and generate working robotic code that can be tested in simulation and deployed in the physical world. Fluidx Medical Technology advances next-generation embolics. Salt Lake City-based Fluidx Medical Technology also announced the closing of a financing to support development and growth across its medical-device portfolio. The company did not disclose the size of the financing. Fluidx is developing embolic technologies for vascular and neurovascular applications. The new capital follows completion of the GPX IDE clinical trial and continued advancement of its ULTRA platform, while supporting development of IMPASS, a next-generation neurovascular embolic technology. Valar Atomics brings $1B nuclear bet to Utah. The biggest announcement with a significant Utah connection came from Valar Atomics, which closed a $1 billion Series B led by Sequoia Capital, alongside a $200 million credit facility led by Erebor Bank and supported by J.P. Morgan, Crescent Cove and Hercules Capital. Valar is headquartered in El Segundo, California, but its second campus and first small modular nuclear reactor are located in Orangeville, Utah, at the San Rafael Energy Labs. The company is pursuing a vertically integrated approach to nuclear power and recently achieved the first active SMR outside of a national lab at its Ward 250 reactor in Orangeville in June. Valar has also demonstrated the reactor generating electricity to power an NVIDIA Blackwell system and announced plans with NVIDIA for a waterless 30 MW AI factory. Deep tech on the rise. August's activity reinforces a broader shift in Utah's technology economy, but the sector mix is particularly interesting. The state's innovation story is increasingly moving from software alone to the intersection of software, AI, physical technology, energy and life sciences. AI is showing up as an enabling technology across different industries rather than as a standalone category, while life sciences and advanced technologies are attracting larger pools of capital. Particularly of note is the Valar raise. While this article series strives to capture deals headquartered in Utah, the Valar deal is flowing large amounts of capital into the state, putting us at the cutting edge of energy development and making us a leader in nuclear development. Angela Smith is the COO of the Nucleus Institute, Utah's hub for innovation.