I

IREN

Operates renewable-powered AI GPU cloud infrastructure

Project Manager

Full-TimeUpdated on 10/23/2026
No salary listed
Mid, Senior
Bachelor's
Kiowa, OK, USA
In PersonOn-site daily at the Kiowa project site; travel to other IREN sites as needed.
Architecture & Civil EngineeringConstruction Management

About the job

Requirements
  • The candidate must have 3 to 6 years of experience in construction project engineering, project coordination, or project controls.
  • The candidate must have qualifications in an engineering discipline, construction management, or a related field, or demonstrable experience in data center or industrial construction.
  • The candidate must be able to read and interpret construction drawings and specifications.
  • The candidate must demonstrate the ability to document and communicate project risks, schedule, and budget clearly and consistently in written reports and in person to project leadership.
  • The candidate must have experience in a fast-paced growth environment and a flexible approach to work hours and site-based work.
  • The candidate must have OSHA 30.
  • The candidate must have strong working knowledge of Microsoft Suite, including Project, Excel, Word, and Outlook.
  • A clear criminal record check is required.
  • The candidate must provide their own steel-toed work boots; other personal protective equipment is supplied.
  • The candidate must be able to reliably commute to the project site daily or plan to relocate before starting work.
  • A flexible approach to work hours is required, with travel to other IREN sites as needed.
Responsibilities
  • Maintain schedule updates, budget tracking, and cost-to-complete inputs for the building in coordination with project controls.
  • Maintain accurate and timely resource records for labor, timesheets, materials, and subcontractors, along with records of completed work.
  • Prepare weekly and monthly project reports for Senior Project Manager and Project Director review, presenting a consistent summary of risks, schedule, and budget.
  • Present project status, risks, and recommendations in project control meetings and to the Project Director.
  • Keep the building risk register current and track mitigation actions to completion.
  • Manage construction-document storage and distribution so contractor scope and contract obligations are clear to project personnel.
  • Maintain the RFI database, submittal logs, meeting minutes, and action-item registers, and drive timely turnaround.
  • Support design and constructability reviews through IFC by tracking review comments and close-out.
  • Prepare change-order packages with supporting documentation for Senior Project Manager approval.
  • Review contractor pay applications against completed work and the schedule of values.
  • Support purchase-order and long-lead equipment tracking, including delivery dates against the schedule.
  • Log non-conformances and defects, track rectification to completion, and report status to Senior Project Managers.
  • Assemble handover manuals, as-built and commissioning documentation, and project records for Operations handover, and archive them according to company guidelines.
  • Attend and support project control meetings, publish the project meetings schedule, and follow up on actions with contractors and suppliers.
  • Support inductions and training records for all personnel, including subcontractors, in line with company requirements.
  • Support a zero-harm culture and quality conformance on site, log safety observations, and comply with IREN’s Risk, QA, and HSE management systems.
  • Work alongside one or more Senior Project Managers on their trades and contracts to build the technical and contractor-management skills required for the Senior Project Manager role.
  • Complete an agreed trade development plan covering field time, contractor exposure, design and submittal review, and commissioning participation.
  • Progressively coordinate the assigned trade in the field under Senior Project Manager direction.
  • Make administrative and process decisions within the role’s authority.
  • Promptly escalate trade, commercial, and HSE issues to the Senior Project Manager or Project Director with a recommendation.
  • Communicate clearly in writing through reports, minutes, and action items that others can act on without follow-up.
  • Work collaboratively with contractors, consultants, procurement, and engineering.
  • Contribute to project performance evaluations and lessons-learned workshops at building close-out.
  • Identify and implement improvements to project controls, documentation, and reporting practices.
Desired Qualifications
  • Electrical trade knowledge, including medium- and low-voltage distribution, switchgear, generators, UPS, and battery systems.
  • Mechanical trade knowledge, including chillers, cooling towers, CRAH/CRAC units, hydronic and process piping, liquid cooling, HVAC, and plumbing.
  • Civil or structural trade knowledge, including site development, grading and drainage, foundations, structural steel, concrete, pavements, and site utilities.
  • Controls and commissioning knowledge, including BMS/EPMS, SCADA, controls, commissioning documentation, and participation in integrated systems testing.
  • Data center or mission-critical project exposure.
  • A PM certification such as CAPM, PMP, or equivalent.
  • Experience with project controls and document management tools such as Primavera P6, Procore, or similar; SAP familiarity is also beneficial.
  • A trade background, such as an apprenticeship, journeyman license, or technical qualification relevant to one of the listed trades.

About the company

IREN provides renewable-powered, vertically integrated AI cloud and digital infrastructure by building and operating data centers and GPU clusters. Its cloud gives enterprises and AI developers access to high-performance NVIDIA GPUs and AI training and inference infrastructure. The company powers its compute with grid-connected land and renewable energy assets across North America, delivering scalable AI, ML, and HPC capacity. By owning energy assets and tightly integrating compute with renewables, IREN aims to deliver reliable, scalable AI compute for customers with sustainable workloads.

Company Size

501-1,000

Company Stage

IPO

Headquarters

Sydney, Australia

Founded

2018

Get referred to IREN

See people who can refer or advise you

Benefits

  • Health Insurance
  • Dental Insurance
  • Vision Insurance
  • Life Insurance
  • Disability Insurance
  • Paid Vacation
  • Paid Holidays
  • Flexible Work Hours
  • Relocation Assistance
  • 401(k) Company Match
  • Company Equity

Growth & Insights and Company News

6 month growth

-6%

1 year growth

-6%

2 year growth

-9%
Yahoo Finance
Oct 22nd, 2026
Neoclouds explained: GPU providers behind the AI boom face a $3.5T impairment risk

Neoclouds, specialist providers that rent out GPU capacity for AI training and inference, have gone from unknown startups to listed companies with contracts worth billions of dollars. CoreWeave, Nebius and IREN lead the listed group; Lambda, Crusoe and Fluidstack remain private. Their shares fell hard in October 2026. CoreWeave dropped 29%, leaving it valued at about $34 billion against a 2025 peak of about $90 billion; Nebius fell 27% and IREN 32%. CoreWeave's unsecured debt yielded about 15%. On October 14, 2026, Gartner predicted that more than 80% of neocloud providers will stop operating independently by 2030. It also warned that more than $3.5 trillion of AI infrastructure spending could face impairment. Demand remains strong. CoreWeave co-founder Brannin McBee said nearly all of its 2027 capacity is sold.

Associated Press
Oct 21st, 2026
IREN launches European arm and secures licence for 300MW Spanish AI campus

IREN has set up IREN Europe and secured the civil works license for a planned AI data center in Badajoz, Extremadura, Spain. The company announced the news on October 21, 2026, at NVIDIA GTC Berlin. The campus is planned to deliver about 300MW of capacity, with initial operations targeted for 2028. IREN plans to offer AI cloud services there, including managed services, for customers with data residency needs in Europe. Ángel Corcóstegui, a former Banco Santander chief executive officer, will chair the IREN Europe board. Roberto Purcaro, formerly of Macquarie Capital, becomes executive director for Europe. IREN entered Europe in June 2026 by acquiring Spain-based developer Nostrum Group. It holds more than 5GW of grid-connected power across North America, Europe, and Asia-Pacific.

The Mirror Democrat and Savanna Times-Journal
Oct 21st, 2026
IREN to Advance Europe's Sovereign AI Ambitions with 300MW Spanish Campus.

IREN to Advance Europe's Sovereign AI Ambitions with 300MW Spanish Campus. * 20 hrs ago * Planned 300MW Badajoz campus provides foundation for European AI Cloud capacity; initial operations targeted for 2028 * IREN establishes IREN Europe, with Roberto Purcaro appointed as Executive Director for Europe, and the European board chaired by former Banco Santander CEO Ángel Corcóstegui * Campus designed for compatibility with NVIDIA DSX AI Factory Platform; IREN to offer managed AI cloud services for customers with data residency and operational requirements BERLIN, Oct. 21, 2026 (GLOBE NEWSWIRE) - At NVIDIA GTC Berlin, IREN (NASDAQ: IREN) today announced that it has established IREN Europe and secured the civil works license for its planned AI data center in Badajoz, Extremadura, Spain. The project is planned to deliver approximately 300MW of capacity, with initial operations targeted for 2028. IREN plans to offer AI cloud services from Badajoz, including managed services, to customers seeking greater choice over where their AI workloads run and how their data and infrastructure are managed in Europe. The campus is part of IREN's announced portfolio of more than 5GW of grid-connected power across North America, Europe and Asia-Pacific, positioning IREN to serve customers with different data residency requirements in each region. "For customers in Europe, sovereign AI starts with two questions: where their data sits and who's running the infrastructure," said Daniel Roberts, Co-Founder and Co-CEO of IREN. "That's what IREN Europe is for: our own sites, run by our own people, with a board that's accountable in Europe. Ángel and Roberto have spent their careers building and financing infrastructure globally and in Iberia, and Badajoz is the first project in Europe." The Badajoz campus At Badajoz, IREN has secured grid-connected power and the civil works license for its planned 300MW campus. IREN continues to be in close consultation with local, regional and national authorities as the project advances. The campus is designed around closed-loop liquid cooling, which requires minimal water for cooling. It's also designed for compatibility with NVIDIA DSX AI Factory Platform. IREN establishes European leadership IREN has appointed Ángel Corcóstegui as Chair of the newly established board of directors of IREN Europe, the holding company for its European operations. Roberto Purcaro has been appointed Executive Director for Europe and joins the board. IREN entered Europe in June 2026 with the acquisition of Nostrum Group, a Spain-based data center developer, and its team of more than 60, led by Gabriel Nebreda, Chief Executive Officer of IREN Spain. Corcóstegui served as First Vice Chairman and Chief Executive Officer of Banco Santander, where he led the integration of Banco Santander and Banco Central Hispano. He co-founded Magnum Capital, a private equity firm focused on Spain and Portugal. His infrastructure and energy experience includes chairing the engineering group Eptisa, Magnum Capital's control of the Portuguese wind operator Iberwind from 2008 to 2015, and a current seat as independent director of Moeve. Purcaro brings more than 25 years of international experience in infrastructure, energy transition and digital infrastructure. Most recently, as Global Head of Complex Opportunities and Head of Italy at Macquarie Capital, he led the structuring of large-scale transactions involving multinational corporations, sovereign institutions and global investors. "Spain has exceptional conditions to become a European hub for AI digital infrastructure, thanks to its excellent connectivity and abundant, competitive renewable energy," said Corcóstegui. "It is an honor to chair IREN Europe and I look forward to helping execute our growth plans." "Badajoz is where IREN Europe begins," said Purcaro. "IREN develops its own sites and operates them directly, and that's how we'll work in Europe. Our focus from here is the campus and the customers who'll use it." Managed AI cloud services in Europe Following the completion of its acquisition of Mirantis, IREN's software capabilities, including k0rdent AI, can provision and manage AI infrastructure. These capabilities include workload isolation and operational controls that can help customers address data residency, security and governance requirements. k0rdent AI also integrates NVIDIA technologies, including NVIDIA Infra Controller (NICo) and NVIDIA Run:ai, into its unified platform. IREN intends to offer these capabilities alongside its European capacity as it comes online. About IREN IREN is a vertically integrated AI Cloud platform, delivering data centers, compute and software for AI training and inference. IREN's platform is underpinned by its expansive portfolio of land and grid-connected power in renewable-rich regions across North America, Europe and Asia-Pacific. Forward-Looking Statements This press release contains "forward-looking statements" within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended, that involve substantial risks and uncertainties. Forward-looking statements generally relate to future events or IREN's future financial or operating performance. Forward-looking statements include information concerning possible or assumed future results of operations, including descriptions of our business plan and strategies, expectations as to development and construction timelines, anticipated benefits of new board and executive appointments, expansion into new geographies, receipt of government permits and approvals, grid connections, availability of financing, and other trends we expect to affect our business. Forward-looking statements often include words such as "anticipate," "believe," "may," "can," "should," "could," "might," "plan," "possible," "project," "strive," "budget," "forecast," "expect," "intend," "target," "will," "estimate," "predict," "potential," "continue," "scheduled" "aim," or other similar terminology. Forward-looking statements may also be made, verbally or in writing, by members of its Board or management team in connection with this press release. These forward-looking statements are based on management's current expectations, plans, estimates, assumptions, and beliefs. These statements are neither promises nor guarantees, but involve and are subject to known and unknown risks, uncertainties and other important factors that may cause IREN's actual results, performance or achievements to differ materially from any future results performance or achievements expressed or implied by the forward-looking statements, including IREN's ability to successfully execute on its growth strategies and operating plans, including to commence operations of the Badajoz campus in 2028, deploy up to 5GW of NVIDIA DSX-aligned AI infrastructure and deliver AI cloud services in the European region, achieve its targeted annualized AI Cloud Services revenue, continue to develop its existing data center sites, design and deploy direct-to-chip liquid and air cooling systems, provide software, and operate and expand its AI Cloud Services business, along with other important factors discussed under the caption "Risk Factors" and "Management's Discussion and Analysis of Financial Condition and Results of Operations" in IREN's Annual Report on Form 10-K, filed with Securities and Exchange Commission (the "SEC") on August 27, 2026 and IREN's Quarterly Reports on Form 10-Q, filed with the SEC from time to time. These and other important factors could cause actual results to differ materially from those indicated by the forward-looking statements made in this press release. Any forward-looking statement included in this press release speaks only as of the date of such statement. Except as required by law, IREN disclaims any obligation to update or revise, or to publicly announce any update or revision to, any of the forward-looking statements, whether as a result of new information, future events or otherwise. Media gallery

Yahoo Finance
Oct 19th, 2026
Why Iren is the one AI stock to hold through a bubble scare, with a $4B revenue target

Iren (NASDAQ: IREN), an AI cloud provider, is drawing bullish attention despite recent bearish headlines. Gartner projects 80% of neoclouds will cease independent operations by 2030, which could make Iren's capacity more valuable through supply constraints. CoreWeave's bonds have reached 15% yields, but Iren's balance sheet is stronger. Its current ratio is 3.55, against CoreWeave's 0.46. Iren has a 5.8-gigawatt pipeline and expects to deliver 300 megawatts by 2026 and 800 megawatts by the end of 2027. Customer prepayments cover 45% to 55% of GPU capital expenditures, and the company targets $4 billion in annual recurring revenue by year-end. Iren reports earnings in November, after major tech companies report in late October.

BITNEWSBOT
Oct 14th, 2026
Redbank could lift IREN's Australia pipeline to 1.7GW.

Redbank could lift IREN's Australia pipeline to 1.7GW. IREN proposes 900MW Redbank data center campus in New South Wales; approvals pending, shares fall. October 14, 2026 * IREN proposed a 900MW Redbank data center campus in New South Wales, outside its secured 5GW power portfolio. * The project remains in early assessment, with grid connection and NSW planning approvals pending. * Construction is expected in phases over six to eight years, potentially lifting IREN's Australian pipeline to 1.7GW. * IREN shares declined in premarket trading and closed Tuesday at their quarterly low amid AI cloud stock weakness. On Tuesday, Bitcoin miner IREN Limited outlined early plans for a 900-megawatt data center campus in New South Wales, Australia, via a post on X. The proposed Redbank site is the first outside the company's announced 5-gigawatt secured-power portfolio. - Advertisement - Discover more Trade Crypto Now Track Stock Market Trade Forex However, the company told investors the project is "not included in our announced 5GW secured-power portfolio" and remains at the early assessment stage. Redbank would need a grid connection and New South Wales planning approvals before construction can begin. Consequently, IREN has not announced a transmission connection agreement for Redbank, unlike its 800MW Bundey campus in South Australia. According to a Capital Brief report, the company could spend more than $10 billion on Redbank and pay Wagga Wagga City Council more than $200 million over 30 years. The report said grid connection is targeted for 2029, with construction phased over six to eight years. If completed, Redbank could lift IREN's Australian development pipeline to 1.7GW. IREN plans to file a scoping report by the end of October and will hold community sessions on November 4 and November 5. The company's annual SEC filing listed nine data center projects, but Redbank was not among them. - Advertisement - IREN shares were down 0.4% in early trading Wednesday after closing at $34.80 on Tuesday, matching their quarterly low. The decline came amid broader weakness in AI cloud stocks and concerns about data center spending. Stay in the loop. Join 1.2K Smart Traders