C

Crusoe

Builds AI data centers near cheap energy

Master Scheduler

Full-TimeUpdated on 10/15/2026
$120k - $135k
Senior
Bachelor's
Brighton, CO, USA
In Person
Operations & LogisticsProduction Planning & Scheduling

About the job

Requirements
  • A bachelor's degree in engineering, data analysis, manufacturing, business, or a related field.
  • At least 7 years of demonstrable experience in production planning or scheduling.
  • Strong analytical, time-management, and organizational skills, including the ability to process large amounts of data and produce concise schedule reports.
  • Ability to hard-code in data programs such as Google Sheets using the Script application.
  • Excellent interpersonal, written, and verbal communication skills.
  • Solid computer literacy in Microsoft Office and Google products, specifically Excel and Sheets, and the ability to learn new software applications quickly.
  • Experience with scheduling programs such as Microsoft Project, Primavera P6, Monday.com, or similar tools.
  • Experience with software related to schedule and demand planning, preferably Material Requirements Planning (MRP) or Enterprise Resource Planning (ERP) systems such as Acumatica, Oracle ERP, SAP, SAGE, or Infor.
  • Proven manufacturing experience, ideally in metal or electrical manufacturing, and a solid understanding of material flow principles.
  • Ability to lift, lower, push, and pull merchandise of all sizes up to 50 pounds, and to stand, walk, stoop, and bend for 8 hours or more daily; the role requires constant use of arms, hands, fingers, eyes, legs, and back.
  • This is a safety-sensitive position or is located in a safety-sensitive facility; participation in the drug and alcohol program and passing a background check are required.
Responsibilities
  • Create and maintain the master production schedule to support continuous and efficient plant operations across multiple manufacturing locations, with daily production forecast details across all facilities extending 12 weeks.
  • Analyze resources, determine production rates, and process data to produce schedules with accurate resource allocation.
  • Create scheduling reports to identify material shortages, potential customer shipment issues, and labor requirements.
  • Communicate the three-week and 12-week master schedules to the Production Manager, production schedulers, and Project Managers; lead production schedule review meetings, provide project status updates, and communicate potential delays.
  • Review schedules to identify potential workforce, materials, and shipping issues and communicate them to the leadership team.
  • Continuously monitor and manage opportunities to improve the overall scheduling process.
  • Identify critical paths, resolve resource conflicts, address material availability challenges, and troubleshoot manufacturing issues.
  • Interface with Material Requirements Planning (MRP) data, currently Acumatica, to incorporate production rates, material availability, and project timelines into the master schedule.
  • Drive cooperation between procurement, materials management, and production to ensure accurate lead times, current inventories, and warehouse levels and optimize order fulfillment.
Desired Qualifications
  • Experience with Arena Simulation or other Industrial Engineering software programs.
  • Experience with automation programs such as Microsoft Power Automate to automate time-consuming tasks between programs.

About the company

Crusoe builds and runs data centers for artificial intelligence, placing them near cheap or otherwise wasted energy and handling everything from the power supply to the cloud software. It developed the flagship campus in Abilene, Texas, for Stargate, the AI infrastructure project backed by OpenAI and Oracle. AI companies rent its GPU servers on demand or under longer contracts through Crusoe Cloud to train and run their models, while larger customers lease entire campuses that Crusoe develops and operates for them. The company was founded in 2018, when it began running computers at oil fields on natural gas that would otherwise have been burned off, and it is based in Denver.

Company Size

1,001-5,000

Company Stage

Series F

Total Funding

$13.8B

Headquarters

Denver, Colorado

Founded

2018

Get referred to Crusoe

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • Room to grow: Crusoe listed 358 open roles in October 2026, from cloud engineering to factory work.
  • Equity has a path to cash: Crusoe was meeting IPO banks, including Goldman Sachs and JPMorgan, in August 2026.
  • Steady work ahead: Crusoe reported over $140 billion in signed customer contracts in September 2026.

What critics are saying

  • Projects aren't safe until built: Google asked Crusoe to leave a 1.8-gigawatt Wyoming campus, then took over in July 2026.
  • The hard part is ahead: only 1 of the 6-plus gigawatts Crusoe had signed was running in September 2026.
  • Less upside for new hires: Crusoe's valuation hit $30.9 billion in September 2026, triple its October 2025 level.

What makes Crusoe unique

  • It makes its own electrical gear instead of waiting on suppliers: two Tulsa factories have built over 2,500 switchboards.
  • Its own MemoryAlloy software lets GPUs share memory, so AI answers start up to 9.9 times faster in Crusoe's tests.
  • Its power-ready land is in demand: Microsoft leased 900 megawatts at Abilene in March 2026 after OpenAI and Oracle passed.

Help us improve and share your feedback! Did you find this helpful?

Benefits

Industry competitive pay

Health insurance package options that include HDHP and PPO, vision, and dental for you and your dependents

Paid life insurance, short-term and long-term disability

Parental leave

Stock options in a fast-growing, well-funded technology company

Pet-friendly offices

Teladoc

401(k) with a 4% match

Unlimited time off

Cell phone reimbursement

Tuition reimbursement

Company paid commuter benefit; $100 per month

Calm

Growth & Insights and Company News

Headcount

6 month growth

2%

1 year growth

2%

2 year growth

2%
Yahoo Finance
Sep 23rd, 2026
Thinking Machines Lab signs $65M deal with Crusoe for AI inference infrastructure

Crusoe, a vertically integrated AI infrastructure provider, has signed a $65 million annual agreement with Thinking Machines Lab to power inference for the lab's open models on Crusoe Cloud. Through Crusoe Managed Inference, Thinking Machines Lab will serve production workloads including its Inkling models, GLM 5.2 and 5.3, on NVIDIA HGX B200 systems connected with NVIDIA Quantum-2 InfiniBand networking. The service enables Thinking Machines Lab to scale without managing its own inference stack. The companies plan to expand into batch inference for large-scale synthetic data generation. Thinking Machines Lab joins other clients that have taken Crusoe Managed Inference past $100 million in contracted annual recurring revenue less than a year from launch.

The Wall Street Journal
Sep 17th, 2026
The Startup That Built OpenAI’s Biggest Data Center Is Now Making Tiny Ones

Crusoe raised $3.9 billion at a valuation of nearly $31 billion, as it bets on factory-built data centers.

Yahoo Finance
Sep 15th, 2026
Crusoe signs multiyear Perplexity cloud deal for Nvidia AI chips

Crusoe has signed a multiyear cloud agreement to supply Perplexity with Nvidia AI chips for model training and inference, Bloomberg reported Tuesday. The deal's financial terms and capacity were not disclosed. Under the agreement, Crusoe will manage the technology throughout its operating life. More than 1,800 Crusoe employees will receive access to Perplexity's Enterprise Max product, which provides AI-powered search tools. The contract adds to Crusoe's growing cloud business, which recently secured a five-year agreement with Jane Street worth roughly $13 billion. In June, Crusoe reported 4.9 GW of contracted AI infrastructure capacity across its data centre projects and cloud platform, with a development pipeline exceeding 40 GW. Crusoe opened a 400,000-square-foot manufacturing plant in Tulsa, Oklahoma, on Monday.

Yahoo Finance
Sep 14th, 2026
Crusoe opens second Tulsa facility, doubles workforce to 300 for AI infrastructure manufacturing

Crusoe has opened its second manufacturing facility in Tulsa, Oklahoma, adding 400,000 square feet to its operations and bringing its national manufacturing footprint to roughly 1 million square feet. The AI infrastructure company has hired more than 300 local workers across its two Tulsa sites, up from the 100 initially expected when the first facility opened in 2024. The facilities produce electrical equipment for AI infrastructure, including medium-voltage switchgear, low-voltage switchboards, electrical enclosures, industrial controls, and custom-fabricated copper busbar. The company has supplied more than 2,500 switchboards to its Stargate Project site in Abilene, Texas. Crusoe now employs more than 1,800 people, with 15,000 skilled workers across its sites. The company manufactures components in-house to reduce production time and maintain quality control.

Bloomberg Law
Sep 3rd, 2026
Crusoe Raises Over $3 Billion in Round at $30 Billion Valuation

Crusoe, a cloud-computing provider and data center developer doing business with OpenAI, Microsoft Corp. and Meta Platforms Inc., has raised over $3 billion in a funding round that values the startup at roughly $30 billion, according to people familiar with the situation.