G

GE Vernova

Global energy provider: power, wind, electrification

Wind Hub Technician

Full-Time
$31.68 - $42.20/hr
Junior, Mid
Bachelor's, Associate's, Certification, Incomplete
United States
In PersonLocal travel among sites within the hub is required; relocation assistance is provided.
No H1B Sponsorship

About the job

Requirements
  • A high school diploma or GED is required.
  • At least one year of experience as a Wind Technician or Wind Mechanic, completion of a Wind Certificate Program, an Associate's Degree in Energy, or two years of electrical work experience is required.
  • Candidates must pass a Technical Knowledge Assessment.
  • Basic computer skills are required.
  • Candidates must maintain a valid driver's license.
  • Candidates must handle repetitive 50-pound weights and climb towers up to 300 feet daily.
  • Candidates must meet manufacturer weight limits not exceeding 300 pounds including required gear.
  • Candidates must be able and willing to work in industrial, manufacturing, and power industry environments.
  • Candidates must effectively prioritize work according to contract obligations.
  • Candidates must be able and willing to take initiative and work without direct supervision.
  • Candidates must be flexible to work rotating shifts and be on call according to site needs.
  • Occasional overnight work may be required.
  • Candidates must be legally authorized to work in the United States.
Responsibilities
  • Work with site and hub leadership to execute contractual obligations according to customer requirements, including daily activities involving electrical and mechanical equipment used in GE wind turbine generators.
  • Perform maintenance, repairs, and parts replacement to correct malfunctions.
  • Troubleshoot complex mechanical, hydraulic, and electrical problems on variable-pitch and variable-speed turbines.
  • Support all areas of site operations as directed by the manager with minimal supervision while observing safety requirements.
  • Perform diagnostic electrical analysis.
  • Document all work performed using computer-based service reporting procedures.
  • Work with and respond to GE's remote operations center when necessary.
Desired Qualifications
  • An Associate's or Bachelor's Degree in a technical, electrical, or electronics field from an accredited college or university.
  • Technical certification in wind energy or an electrical or electronic field.
  • Ability to work with personnel at all levels inside and outside the wind farm.
  • Wind turbine experience.
  • Ability and willingness to take initiative and work without direct supervision.
  • Electrical, mechanical, or hydraulic experience.
  • Experience using hydraulic power tools.
  • Experience with heavy equipment for facility maintenance and working knowledge of crane and rigging requirements.

About the company

GE Vernova is a global energy company created in 2024 to support the electricity grid and the energy transition, with three focuses: Power, Wind, and Electrification. It sells large-scale equipment, signs long-term service agreements, and provides software to utilities, independent power producers, grid operators, and large industrial energy users. Its products include H-Class gas turbines that can burn natural gas with blends of hydrogen toward 100% hydrogen, Haliade-X offshore wind turbines up to 14.7 MW, and GridOS software that unifies grid data to help manage networks and integrate renewables. By combining hardware, services, and software under GE heritage, it aims to meet rising electricity demand while accelerating decarbonization across global energy systems.

Company Size

1,001-5,000

Company Stage

N/A

Total Funding

$17.6M

Headquarters

Cambridge, Massachusetts

Founded

2022

Get referred to GE Vernova

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • Q2 2026 orders jumped 88% organically; data center orders exceeded $5 billion.
  • Backlog reached $176.3 billion in Q2 2026, supporting growth through 2027.
  • GE Vernova raised 2026 revenue guidance to $45.5-$46.5 billion after stronger cash conversion.

What critics are saying

  • Wind lost $275 million in Q2 2026; US orders stayed blocked by tariffs.
  • Vineyard Wind sued GE Vernova in April 2026 over blade failures and payment disputes.
  • Offshore wind execution can destroy capital, distract management, and cripple credibility with utilities.

What makes GE Vernova unique

  • GE Vernova's August 26, 2026 LS Electric JV strengthens VSC-HVDC execution in Korea.
  • Its August 24, 2026 MV-UPS launch targets data centers and AI factories directly.
  • Scott Strazik's platform spans turbines, grid gear, and services across 25-30% of global electricity.

Help us improve and share your feedback! Did you find this helpful?

Benefits

Health Insurance

Dental Insurance

Vision Insurance

Life Insurance

Disability Insurance

401(k) Retirement Plan

401(k) Company Match

Paid Vacation

Paid Parental Leave

Mental Health Support

Relocation Assistance

Performance Bonus

Company News

Yahoo Finance
Sep 29th, 2026
GE Vernova orders surge 68% as AI data centres drive power demand

GE Vernova, General Electric's former energy division spun off in 2024, is positioned to benefit from surging power demands at AI data centres. The company operates three segments: Power (55% of 2025 orders), Electrification (33%), and Wind (13%), providing turbines, transformers, and grid services. Orders grew 24% organically in the first half of 2026, driven by Power and Electrification segments. By Q2 2026, GE Vernova's backlog reached $176.3 billion — 4.6 times its 2025 revenue of $38.1 billion. The company expects 2026 revenue to grow 20-22%, accelerating from 9% growth in 2025 and 5% in 2024. Fortune Business Insights projects the global AI in power utilities market could expand at a 19.3% compound annual growth rate from 2026 to 2034.

Yahoo Finance
Sep 24th, 2026
GE Vernova, Hitachi, and Samsung partner to deploy small modular reactors across Europe

Four major engineering firms have signed a memorandum of understanding to cooperate on building and deploying small modular reactors (SMRs) in Europe. GE Vernova, Hitachi, Samsung C&T, and Poland-based SGE will work together on market development and commercial opportunities for the BWRX-300, an SMR developed by GE Vernova and Hitachi subsidiaries. The agreement was signed during the Atlantic Council Nuclear Energy Policy Summit at the UN General Assembly in New York. SMRs are smaller-scale, plug-and-play nuclear generators that are cheaper and quicker to construct than traditional nuclear plants. They use low-enriched uranium that can be sourced entirely from western enrichment providers. The initiative has government backing from the US, Japan, and South Korea, supported by a trilateral agreement signed at the recent NATO summit.

Yahoo Finance
Sep 23rd, 2026
GE Vernova shares down 20% from high as AI power demand and nuclear SMR development drive long-term growth potential

GE Vernova shares have fallen 20.8% from their 52-week high of $1,195.94, closing at $946.22 on 21 September. Despite the pullback, the stock remains up 47% over the past year. The company reported strong second-quarter results, with orders of $24.2 billion, up 88% organically year-on-year. Revenue reached $11.1 billion, up 22%, whilst net income for the first six months totalled $5.3 billion, compared with $756 million in the prior-year period. GE Vernova is positioned to benefit from surging power demand driven by artificial intelligence data centres. The company also has a nuclear energy division developing small modular reactors through a joint venture with Hitachi, with commercial operation expected by the end of 2030. The company faces challenges including a forward price-to-earnings ratio of 38.1 and declining wind division sales.

Yahoo Finance
Sep 20th, 2026
GE Vernova's $200B backlog expected to arrive in early 2027 as AI data centre boom drives power demand

GE Vernova CEO Scott Strazik announced on 16 September that the company's backlog could reach $200 billion in early 2027, earlier than Wall Street expected. The backlog stood at $167 billion at the end of Q2 2026, up from $176 billion the previous quarter. The power equipment manufacturer has seen strong demand driven by AI data centres. Data centre-related orders exceeded $5 billion in the first half of this year, more than double 2025's total. GE Vernova's Q2 revenue grew 22% year-on-year to $11.1 billion. Free cash flow reached $5.1 billion, surpassing its full-year 2025 level. The company raised its 2026 revenue forecast to $45.5 billion-$46.5 billion. However, the Wind business segment posted losses of $275 million, widening 66% year-on-year.

Yahoo Finance
Sep 10th, 2026
Big Tech burns $13.5B as AI buildout sends Treasury yields to 4.79%

US Treasury yields near 4.79% reflect strong corporate borrowing for AI investments rather than economic weakness, according to analysts Joel Litman and Rob Spivey. They argue that context matters more than absolute rate levels. Companies borrowing at 5% to fund projects returning 30-40% benefit from current rates, whilst those earning less than borrowing costs face pressure. The analysts note that AI-related corporate debt issuance reached roughly $1.5 trillion this year, driving yields higher. Alphabet posted its first negative free cash flow since 2004, burning $5.9 billion in Q2 as capital expenditure hit $44.9 billion. Amazon swung to negative $7.6 billion on a trailing basis. However, negative cash flow can signal productive investment rather than distress, the analysts suggest.