T

TAR

Off-grid power plants for AI data centers

Machinist

Precision Machining & ToolmakingUpdated on Nov 5
Full-timeOdessa, TX, USANo salary listedIn-person

About the Job

Requirements

  • Experience operating a Haas Mill.
  • Ability to perform CAM programming and basic G-code edits.
  • Experience with manual machining and digital fabrication equipment.
  • Ability to work through ambiguity and quick iterations in a prototype and research-and-development environment.

Responsibilities

  • Program parts from CAD using Fusion 360 or similar computer-aided manufacturing software.
  • Operate CNC and manual machining equipment, including a lathe, bandsaw, drill press, and grinders.
  • Operate digital fabrication tools, including 3D printers, a laser cutter, and a waterjet.
  • Use general shop and fabrication equipment as needed.
  • Produce one-off prototype parts quickly, prioritizing speed over polish.
  • Inspect parts with standard metrology tools, maintain reasonable tolerances, and flag design issues.
  • Keep tooling stocked, machines maintained, and the shop clean and safe.
  • Assist the team at the West Texas test facility during testing and prepare for testing between field tests.

Desired Qualifications

  • Experience with welding, sheet metal, composites, G-code, general CNC operations, plasma tables, or lathes.
  • Experience working in or around a hardware, robotics, or deep-tech startup.
  • A track record of establishing new functions or processes from scratch.
  • Comfort working alongside engineers and technical leadership.

About the Company

TAR

Off-grid power plants for AI data centers

TAR builds and operates behind-the-meter power plants for AI data centers that cannot wait out a utility interconnection queue. The company designs islanded microgrids pairing solar, battery storage, and gas peakers, then manufactures, installs, and runs them, handling power electronics, microgrid controls, dispatch software, and site construction in-house. Compared with grid interconnection, which can take years to clear, an off-grid plant can be sited and energized on the developer's own schedule, and TAR says it is working with a large compute provider and targets 5 GW by 2028. Its goal is to remove power as the constraint on AI buildout by owning generation end to end.

Company size
11-50
Company stage
Series A
Total funding
$147M
Headquarters
Texas, United States
Founded
2025

Recently Posted Jobs

Explore more opportunities at TAR

See more jobs