N

NextEra Energy

Runs a Florida utility and builds wind and solar farms

Field Operations HV Technician II - HV Strike Team, TX

Power Systems EngineeringPosted on Nov 11
Full-timeMt Calm, TX, USANo salary listed

About the Job

Requirements

  • A high school diploma or GED is required.
  • At least 2 years of experience is required.
  • A valid non-commercial driver's license is required.
  • Strong knowledge of electrical safety practices, including lockout/tagout, switching, grounding, and safe work execution in high-voltage substation environments is preferred.
  • Working knowledge of substation equipment, systems, maintenance, testing, troubleshooting, and equipment restoration is preferred.
  • Ability to read and interpret DC electrical schematics, one-line diagrams, wiring diagrams, and relay drawings is preferred.
  • Ability to work effectively as part of a team to safely complete NERC outages within defined outage windows is preferred.
  • Willingness and ability to travel approximately 40%–50% and provide night, weekend, or holiday support when required is preferred.

Responsibilities

  • Perform routine work in the construction and maintenance of substation, transmission, and collection system equipment.
  • Work with data communication equipment.
  • Report and coordinate emergency response and repairs to high-voltage equipment and systems in an assigned geographical area, using resources from the Energy Resource Control Center and Technical Services.
  • Establish and maintain high-voltage inventory, equipment, and vehicles within an assigned geographical area according to company safety and maintenance standards.
  • Perform assigned routine tasks with corporate, regional, and cross-functional assets and resources.
  • Maintain compliance and non-compliance maintenance tasks and schedules, ensuring compliance with federal, state, and local regulations and market requirements.
  • Participate in quality initiatives while learning and using NEE quality tools.
  • Maintain adherence to NEE safety culture, policies, and processes while meeting safety targets.
  • Support planned NERC outages, high-voltage maintenance, testing, troubleshooting, and PRC-028 compliance work.
  • Support site readiness reviews and walkdowns; confirm access, safety, lockout/tagout, outage, escort, material, and equipment requirements.
  • Execute or support testing and maintenance activities.
  • Oversee vendor installation of Digital Fault Recorder equipment, panels, fusing, grounding, CT/PT circuits, communications, and time-synchronization components.
  • Assist with point-to-point checks, continuity testing, relay setting implementation and verification, functional testing, alarm validation, commissioning, and equipment restoration.
  • Coordinate resources, logistics, and field issue resolution.
  • Document as-found and as-left conditions, test results, redlines, settings files, discrepancies, and closeout records.
  • Help ensure final turnover packages support compliance, audit readiness, asset records, and future maintenance.
  • Provide support to routine field operations, collection systems, transmission, and substations.
  • Support senior-level technicians in project management and contractor oversight within a specified geographical region.
  • Provide telephone or call-out support at night, on weekends, or on holidays when required due to the 24-hour, 7-day-per-week nature of power generation.
  • Perform other job-related duties as assigned.

About the Company

NextEra Energy

Runs a Florida utility and builds wind and solar farms

NextEra Energy owns Florida Power & Light, the regulated utility that supplies electricity to much of Florida, and NextEra Energy Resources, which builds and runs wind, solar, battery storage and nuclear plants across the United States. The company calls itself the world's largest generator of renewable energy from the wind and sun. FPL earns returns set by Florida regulators on the power plants and grid lines it builds, while Energy Resources sells power to utilities, technology companies and other large buyers under long-term contracts. NextEra Energy was formed in 1984 as the holding company for Florida Power & Light, which dates to 1925, and is based in Juno Beach, Florida.

Company size
10,001+
Company stage
IPO
Headquarters
Juno Beach, FL
Founded
1984

Recently Posted Jobs

Explore more opportunities at NextEra Energy

See more jobs