C

Castelion

Designs and manufactures hypersonic strike weapons

Hazardous Materials Logistics Specialist

Shipping & ReceivingConfirmed live in the last 24 hours
Full-timeRio Rancho, NM, USANo salary listed

About the Job

Requirements

  • At least 3 years of experience in logistics, supply chain, materials operations, transportation, or a related field.
  • Current hazardous shipping certification under 49 CFR and IATA.
  • Ability to obtain and maintain a U.S. government-issued security clearance; U.S. citizenship is required.
  • Experience owning shipping, receiving, logistics, or material-transfer execution.

Responsibilities

  • Oversee hazardous materials shipments and verify appropriate documentation, packaging, labeling, shipping, and transportation requirements.
  • Be physically present at field locations as needed to support logistics activities and troubleshoot operational challenges.
  • Support compliance inspections, audits, and site reviews related to hazardous materials, transportation, and storage.
  • Maintain a strong focus on safe material handling and transportation practices.
  • Assist with loading, unloading, staging, storage, and movement activities as appropriate and within applicable safety requirements.

Desired Qualifications

  • Experience in explosives, oil and gas, energy, mining, defense, manufacturing, or another highly regulated field.
  • Experience conducting or supporting DOT, OSHA, or ATF inspections and audits.
  • Secret clearance preferred.

About the Company

Castelion

Designs and manufactures hypersonic strike weapons

Castelion designs, tests, and manufactures hypersonic strike weapons for the U.S. military, aiming to deter future wars with fast, credible, non-nuclear deterrence. Its flagship Blackbeard is a low-cost, mass-producible hypersonic missile compatible with HIMARS/MLRS, built in-house with solid rocket motors, propellant, and a real-time, hardware-isolated flight computer. The company uses vertical integration and a rapid test-and-iterate cycle, with frequent flight tests and Project Ranger, a 1,000-acre facility in New Mexico to scale production. It competes with traditional defense primes on speed and cost, selling under government contracts and development awards to field advanced weapons at scale.

Company size
201-500
Company stage
Series C
Total funding
$1.5B
Headquarters
Torrance, CA
Founded
2022

Recently Posted Jobs

Explore more opportunities at Castelion

See more jobs