A

Ameren

Provides electric and natural gas utilities

Advanced Distribution Management System Engineer Senior Lead

Full-Time
$84.4k - $204.4k+ Annual incentive payments
Mid, Senior, Expert
Bachelor's
St. Louis, MO, USA
Hybrid
IT OperationsEnterprise Applications

About the job

Requirements
  • A bachelor's degree is required for the ADMS Engineer, Senior ADMS Engineer, and Lead ADMS Engineer levels; engineering, mathematics, or computer science is preferred.
  • The ADMS Engineer level requires three or more years of directly related experience.
  • The Senior ADMS Engineer level requires five or more years of relevant experience and experience with at least two of the listed systems or technologies: electric power distribution, Advanced Distribution Management System, Outage Analysis System, Geographic Information System, electric circuit analysis, software applications development, relational databases, and server or network infrastructure.
  • The Lead ADMS Engineer level requires seven or more years of relevant experience and experience with at least three of the listed systems or technologies: electric power distribution, Advanced Distribution Management System, Outage Analysis System, Geographic Information System, electric circuit analysis, software applications development, relational databases, and server or network infrastructure.
  • The ADMS system requires 24/7/365 availability; the applicant must provide off-hours support as needed.
Responsibilities
  • Provide technical and user support to system operators, division office workers, division engineering, and information technology personnel.
  • Provide training and documentation when needed or requested.
  • Aggregate and model data to create reports and dashboards using business intelligence tools such as Power BI, SSRS, and OBIEE.
  • Analyze, recommend, design, plan, test, implement, and support the Advanced Distribution Management System.
  • Perform system and data analysis, design software enhancements, test system functionality, and maintain application configuration settings for ADMS applications.
  • Engage with the ADMS vendor, user groups, and utility peers to ensure Ameren's requirements are incorporated into future software releases.
  • Provide input into technological processes, standards, and methodology for cloud-based configuration; identify gaps and develop training plans.
  • Enable smart grid applications, including SCADA, power flow, fault locating, switching, and outage management.
  • Perform root cause analysis and develop backlog action plans and priorities, identifying short- and long-term solutions; may lead plan implementation.
Desired Qualifications
  • Experience with electric power distribution systems and applications such as Advanced Distribution Management System, Outage Analysis System, Geographic Information System, and electric circuit analysis systems.
  • Experience with software application development, relational databases, and server or network infrastructure.

About the company

Ameren provides electric and natural gas services in Illinois and Missouri, with Ameren Illinois handling distribution and Ameren Missouri generating and distributing electricity and distributing gas. It operates a regional electric grid and power generation capacity above 10,200 megawatts to serve about 2.4 million electric customers and 900,000 natural gas customers across 64,000 square miles. It ranks among the largest investor-owned utilities in the United States, distinguished by its large service area, mix of generation and distribution, and Missouri’s vertically integrated electric service. Its goal is to reliably deliver affordable energy while investing in infrastructure and grid safety to meet customers’ needs.

Company Size

5,001-10,000

Company Stage

IPO

Headquarters

St. Louis, Missouri

Founded

1881

Get referred to Ameren

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • Ameren reaffirmed 2026 EPS guidance of $5.25-$5.45 after Q2 2026 results.
  • September 2026 West Alton filing targets 2.1 GW in-service by 2031.
  • Ameren added 350 MW of solar in 2026 and advanced battery-storage projects.

What critics are saying

  • Missouri PSC can reject West Alton and the 2026 IRP, freezing growth plans.
  • Ameren abandoned net-zero language while adding nine gas plants, inviting activist and legal attacks.
  • Data-center demand drives everything; missed load forecasts strand West Alton, Labadie, and gas pipeline investments.

What makes Ameren unique

  • Missouri and Illinois regulated franchises turn grid buildout into compounding rate base growth.
  • Ameren locked 3.4 GW of Missouri construction agreements, including 2.8 GW signed ESAs.
  • Goalby Substation showed Ameren will deploy GIS to solve hard site constraints.

Help us improve and share your feedback! Did you find this helpful?

Benefits

Health Insurance

401(k) Company Match

Paid Vacation

Paid Holidays

Parental Leave

Company News

MarketScreener
Oct 8th, 2026
Ameren: Transmission partnership to leave lasting land improvements at NEMO Fairgrounds.

Ameren: Transmission partnership to leave lasting land improvements at NEMO Fairgrounds. Published on 10/08/2026 at 12:07 pm EDT Ameren Transmission partnership to leave lasting land improvements at NEMO Fairgrounds Key Takeaways: * Ameren Transmission Company of Illinois (ATXI) reached an agreement with the NEMO Fair Association to establish a temporary storage yard to hold supplies for a major transmission project in northern Missouri. * Once the transmission project is complete, the NEMO Fair Association will benefit from approximately 35 acres of upgraded, level ground that can be used for additional parking, storage or other future needs. * Construction on the laydown yard began in August 2026, and it is expected to be completed by the end of the year. Above: Ameren Transmission will provide 35 acres of upgraded, level ground for the NEMO Fair Association to use for additional parking, storage or other future needs. KIRKSVILLE, Mo. (Oct. 8, 2026) - Ameren Transmission Company of Illinois (ATXI) recently reached an agreement with the NEMO Fair Association to establish a laydown yard to store equipment and materials for Ameren's Northern Missouri Grid Transformation Program. Once the transmission project is complete, the NEMO Fair Association will benefit from approximately 35 acres of upgraded, level ground that can be used for additional parking, storage or other future needs. "This partnership is a win-win for ATXI and the NEMO Fair," said Nick Rudis, project manager for Ameren. "Major infrastructure projects require space to safely store materials and equipment. By partnering with the NEMO Fair Association, we're able to strengthen the grid and support this region's future energy needs while also leaving behind improvements that can support the fairgrounds for years to come." Workers are leveling the land, adding rock and installing fencing as part of site improvements. Construction of the laydown yard is expected to be completed by the end of the year, and ATXI has signed a four-year lease agreement to use the land. "We're always on the lookout for opportunities that help us improve the fairgrounds and better serve the community," said Alan Whittom, president of the NEMO Fair Association's board of directors. "We look forward to using the additional space. It will give us flexibility to support activities and events long after the project is completed." After construction is finished, the laydown yard will hold supplies for the Northern Missouri Grid Transformation Program. ATXI, Missouri Joint Municipal Electric Utility Commission (MJMEUC) and Ameren Missouri are working together on this portfolio of new energy projects. The program includes more than 255 miles of new 345 kilovolt (kV) transmission lines developed in two phases across northern Missouri. To learn more about the program, visit the website: https://www.ameren.com/reliability/transmission/northern-missouri. About Ameren Corporation St. Louis-based Ameren Corporation powers the quality of life for 2.5 million electric customers and more than 900,000 natural gas customers in a 67,700-square-mile area through its Ameren Missouri and Ameren Illinois rate-regulated utility subsidiaries. Ameren Illinois provides electric transmission and distribution service and natural gas distribution service. Ameren Missouri provides electric generation, transmission and distribution services, as well as natural gas distribution service. Ameren Transmission Company of Illinois develops, owns and operates rate-regulated regional electric transmission projects in the Midcontinent Independent System Operator, Inc. For more information, visit Ameren.com, or follow us at @AmerenCorp, Facebook.com/AmerenCorp, or LinkedIn.com/company/Ameren. Attachments * Original document * Permalink Disclaimer Ameren Corporation published this content on October 08, 2026, and is solely responsible for the information contained herein. Distributed via Public Technologies (PUBT), unedited and unaltered, on October 08, 2026 at 16:06 UTC. (C) Publicnow - 2026

Lincoln University of Missouri
Oct 5th, 2026
Ameren Missouri awards $100,000 grant to Lincoln University of Missouri for student success, workforce readiness.

Ameren Missouri awards $100,000 grant to Lincoln University of Missouri for student success, workforce readiness. Office of Communications and Marketing Young Hall 820 Chestnut Street Jefferson City, MO 65101 * home * 2026 * Ameren Missouri awards $100,000 grant to Lincoln University of Missouri for student success, workforce readiness. October 5th, 2026 Lincoln University has received a $100,000 grant from Ameren Missouri to support student retention, scholarships, career preparation and workforce development. From left: President John Mosley, Curator Tina Shannon, Reyna Spencer-Gurlly and Bryan Daniels. Lincoln University of Missouri has received a $100,000 grant from Ameren Missouri to support the University's "Strengthen Education Opportunity in Mid-Missouri" initiative, expanding opportunities for student success, career preparation and stronger connections between the University and the communities it serves. "At Ameren Missouri, we believe investing in people is one of the most meaningful ways we can invest in the future of our communities," said Tina Shannon, Lincoln University Board of Curators president and senior director of government relations for Ameren Missouri. "Lincoln students have tremendous potential, and I am especially proud to see this partnership connect them with the experiences and support they need to build their futures while strengthening Missouri's workforce and communities." The one-time grant will support efforts to help students persist to graduation and prepare for successful careers. Funding will support student retention and engagement; scholarships and financial assistance for career pathways in engineering, energy, skilled trades, information technology, environmental sciences, agriculture, business and other STEM-related fields; and career-readiness opportunities such as internships, mentorship, professional development and workforce credentialing. "We are grateful to Ameren Missouri for investing in Lincoln University students and in the future workforce of our region," said Lincoln University President John B. Moseley. "This partnership will help reduce barriers to student success while expanding the experiences and career connections that prepare our students for life after graduation. It is an investment in their futures and in the communities they call home." Through the initiative, Lincoln University will build on its work to connect education with career pathways and workforce demand while reducing barriers that can prevent students from completing their degrees. The grant will support programming through Dec. 31, 2027. The partnership builds on Lincoln University's growing role in workforce development, including its Employment Academy and recent selection to lead workforce development efforts as part of the National Science Foundation's Critical Materials Crossroads Engine, a regional initiative focused on strengthening the workforce and innovation ecosystem across Missouri and Kansas. Ameren Missouri will be recognized as a Lincoln University partner throughout the 2026-27 academic year, including as a supporting sponsor of Lincoln University's 160th Birthday Bash Scholarship Soiree during Homecoming 2026, an event supporting student scholarships. University News

STLPR
Sep 30th, 2026
Data centers drive huge power plant buildout in Ameren Missouri 20-year plan.

Data centers drive huge power plant buildout in Ameren Missouri 20-year plan. St. Louis Public Radio | By Kate Grumke Published Sept. 30, 2026 at 5:00 a.m. CDT Updated Sept. 30, 2026 at 9:51 a.m. CDT Ameren Missouri wants to significantly ramp up power plant construction to meet data center electricity needs, according to a 20-year plan released this week. The new plan significantly increases the company's reliance on natural gas plants while scaling back the percentage of energy produced by renewable sources like wind and solar. And in a change from previous plans, the company is no longer discussing a goal to reach net-zero carbon emissions. Monopoly utilities publish these plans, called Integrated Resource Plans, every three years as required by Missouri law. This plan is now a case before the Missouri Public Service Commission, which will include pushback from outside parties and public comment submitted to regulators before being finalized. Data center growth. There are currently 40 potential large data centers that could be built within Ameren Missouri's footprint, according to the document, including multiple projects that have signed binding agreements with the company. New data centers represent the majority of the company's projected growth over the next 20 years, said Ajay Arora, executive vice president, chief growth officer and chief generation development officer for Ameren Missouri. He said those projects could benefit regular consumers. "Economic development is vital to the state," Arora said. "It helps us modernize our electric grid to ensure reliability for everybody and have that fixed cost be spread over new customers." To meet that new demand, Ameren is planning to build power plants and renewable energy projects that would generate almost double the amount of electricity it was projecting to build in its 2023 projection. Shifting climate goals. In 2020 and 2023, Ameren focused its planning on renewable energy, discussing goals to reach net-zero carbon emissions. Ameren removed that language in the 2026 Integrated Resource Plan, discussing how its plan will decrease carbon emissions, but saying technology like carbon capture would have to advance to achieve net-zero emissions. "We are not changing our net-zero targets right now," Arora said. "However, we do outline in the plan that new technology would need to mature in order for us to achieve our net-zero goals." Much of the new power would come from natural gas - in 2023, the Integrated Resource Plan called for two such plants. In 2026, the new plan lists nine plants to be built over the next two decades. Environmental advocates took issue with that new focus on natural gas, including Jenn DeRose, the Sierra Club's campaign organizing strategist for Beyond Coal in Missouri. "Their own research shows that solar and wind are the cheapest forms of energy to build, and they're still choosing gas," DeRose said. "I find that very interesting. I also find it very interesting that they cite extreme weather as a reason for building gas. Do you know what causes extreme weather? Climate change. Do you know what contributes to catastrophic climate change? Coal and gas." Ameren Vice President of Regulatory and Legislative Affairs Rob Dixon said a reliable energy system needs a diversity of energy sources. "It's really important to remember that no single technology type can meet every customer need in every hour under every condition," Dixon said. Increasing renewables and keeping coal. The 2026 Integrated Resource Plan also increases the company's renewable energy buildout, with new solar plants and battery storage. "They are adding solar, they are adding batteries, and I think that's good," said James Owen, executive director of Renew Missouri. "I think that makes sense for long-term considerations. But I think the continued reliance on fossil fuels is going to end up costing customers more money than Ameren is currently anticipating." For the IRP, Ameren calculated the lifetime costs of each source of new energy it is considering building. The company found wind, solar and the kinds of natural gas plants that run consistently were the least expensive per kWh, while nuclear plants and the kind of gas plants that can turn on and off, potentially to supplement renewables, were the most expensive. The new plan also extends the lives of two coal plants. The Sioux Coal plant would close three years later than planned in 2023, while the Labadie plant would keep all four units operational until 2042, when two were originally set to retire in 2036. Arora said that decision was made to save money. "Labadie remains one of the most affordable plants in the country and recognizing the economic conditions for all our customers and how important reliability and affordability is, that's really factored into delaying the retirement of a few of the Labadie units by a few years," he said. Environmental advocates said there are other costs that come with coal. "Do you know why that plant is so affordable?" DeRose said. "It's because it doesn't have any modern pollution controls. So it's only affordable for the company. Those health externalities, those are what we have to pay for." Paying for new plants. To actually build power plants or to set new electricity rates, Ameren still has to take each request to the Public Service Commission as a case. While this plan does not change people's bills, Owen said the cost of the new power plants will trickle down to customers eventually. "Any time they build more generation, it's going to increase rates," Owen said. "I don't know how they can say that, 'Oh, this is [only costing] data centers,' when that's the main thing driving energy consumption right now. It's not that we're having this huge influx of people moving into Missouri. It is not this huge influx of other manufacturing jobs. It's data centers." Ameren's representatives said a Missouri utility law known as Senate Bill 4 requires data centers to pay for the infrastructure to serve them and said the companies do not receive discounted electric rates. "The safeguards in Senate Bill 4 are meaningful," Dixon said. "That's exactly what ensures that other customers are not bearing the costs caused by data centers. And in fact, we've done some projections, and we expect that our customers are going to see projected savings of $21 million over the next two years driven by the data center customers that we've already committed." The Sierra Club's DeRose wants more people to get involved in the utility planning process and is organizing a protest against Ameren on Oct. 10. "They need to hear your voice, the average customer's voice, if we're going to see the company change its ways and change its addiction to fossil fuels into something that is more sustainable for our future," DeRose said. Correction: Two units of the Labadie coal plant were scheduled to retire in 2036. A previous St. Louis Public Radio article misstated the year.

Clean Air St. Louis
Sep 21st, 2026
Spotlight on: Ameren.

Spotlight on: Ameren. Ameren is a regional energy company dedicated to delivering reliable energy while helping meet the evolving needs of customers and communities. Through innovation, collaboration and long-term sustainability planning, Ameren continues to advance cleaner energy solutions across Missouri and Illinois, earning Champion Level status in the 2025 St. Louis Green Business Challenge. As part of the 2025 Challenge, Ameren highlighted its Champion Innovation Project, Powering Growth. The project showcased a variety of initiatives designed to strengthen energy reliability, support economic growth and advance sustainability goals throughout the region, all rooted in collaboration. "Together, we are more powerful than each of us can be on our own," said Gwen Mizell, Senior Vice President, Chief Sustainability Officer for Ameren. "It is through collaboration that we build trust. It is through collaboration that we create and execute meaningful, sustainable programs that help deliver stability to all our community members. And it's through collaboration that we share our knowledge about what's working, what's not, why not, and where we go from here." That collaborative approach helped drive significant results. Through Ameren Missouri's BizSavers(R) program, more than 230 Missouri businesses saved over $2.9 million and nearly 30 million kilowatt-hours of energy by upgrading to high-efficiency HVAC systems since July 2024. In addition, an initiative to repurpose retiring wood utility poles prevented more than 5,500 tons of wood waste from entering landfills over the past three years. Ameren also continued investing in technologies that improve energy reliability. During major storm events from January through June 2025, the company's smart switch technology prevented more than 150,000 customer outages by automatically rerouting power when disruptions occurred. The company made notable progress in expanding renewable energy resources as well. New solar generation brought online in 2024 produced enough energy to power approximately 93,000 homes annually. Ameren also began constructing or planning four additional solar projects capable of powering more than 117,000 homes each year and announced plans for its first large-scale lithium-ion battery installation to support customer reliability. Beyond infrastructure investments, Ameren demonstrated its commitment to the communities it serves. Following the May 16, 2025 tornado, the company donated $1 million in relief funding for survivors and made an additional $4 million available for customer bill payment assistance. Ameren also partnered with hundreds of agencies to help provide more than $75 million in available energy assistance to customers in need. Ameren's commitment to collaboration was further recognized through the 2025 Green Jean Ponzi Collaborative Action Award, which honors organizations that work together on initiatives extending beyond traditional sustainability practices. Through investments in cleaner energy, innovative technologies and strong community partnerships, Ameren continues to demonstrate how sustainability and reliability can work hand in hand to power the future of the St. Louis region.

DistroForge
Sep 20th, 2026
GIS vs air insulated substation: when the site decides.

GIS vs air insulated substation: when the site decides. Ameren's Goalby substation shows the real GIS vs air insulated substation test: not whether the lot is small, but whether site cost scales with area. The usual way to ask whether gas insulated switchgear is worth it goes something like this: is the site too small for a conventional air insulated substation? That question has an answer, and the answer is almost always no, so the conversation ends there and the utility builds air insulated. A project Ameren Illinois completed just west of downtown Belleville suggests the question is asked backwards. The site was not short of room. What it was short of was ground. What Ameren built, in Ameren's words. The Goalby Substation, named for Belleville native and PGA golfer Bob Goalby, sits at 1080 S. 20th St. Ameren's own release describes it as "the first gas insulated substation (GIS) on Ameren's transmission system," built to provide "another intersection to reroute power as it flows through the region," which lets the utility restore service faster after storms. On the design, the release is direct: "Unlike traditional air insulated substations, this GIS facility uses advanced equipment housed within compact, sealed enclosures. This design results in a footprint about one-third the size of a typical transmission substation, while still delivering the same or even greater capabilities." Then comes the sentence that does the real work: "That smaller footprint allowed Ameren to build the substation in an area located above old mine shafts running underground from legacy coal mining industries in Belleville." Read it in that order and the causation runs the opposite way from the usual story. The footprint was not the objective. It was the mechanism. The hardware premium was paid out of a different budget. Harman Ormani, Ameren's project manager for Goalby, puts the reason plainly: "This GIS design allowed us to keep costs as low as possible for customers while maintaining the highest levels of safety, performance and reliability. The compact layout reduced the amount of engineering work required to mitigate possible issues caused by the mine." So the justification was site preparation, not switchgear. Ameren bought a more expensive assembly in order to buy less of something else, and that something else was the work of making undermined ground safe to build on. Ameren has not published a cost figure for Goalby, and DistroForge LLC is not going to supply one. What the utility does say is that the compact layout reduced the mitigation engineering, and that is enough to make the general point without a number attached to it. Ormani also supplies the contrast that makes this worth writing about at all: "It's a relatively unique situation. These GIS designs are typically built in very crowded downtown city blocks and other places where space is limited." The standard use case is scarcity of land. Goalby was scarcity of competent ground on land the utility could otherwise use. The test that actually decides it. Here is the generalization, offered as arithmetic rather than as a finding, because that is what it is. Gas insulated switchgear loses to air insulated switchgear on equipment cost. It will keep losing. It wins when some other cost on the site scales with area. If you shrink the station to a third of the footprint and nothing else on the site gets cheaper, you have paid a premium for nothing. If a per-square-foot site cost exists, shrinking the area shrinks that cost too, and the comparison changes. The qualifying question is therefore not is my site small? It is what does this site cost per square foot to make buildable, and does that cost scale with area? Mine subsidence is one instance. The same structure holds anywhere a site carries an area-proportional preparation cost: * Contaminated soil remediation on a brownfield, priced by volume removed or treated. * Rock excavation where competent bedrock sits close to grade. * Wetland mitigation, where required acreage tracks disturbed acreage. * Flood-plain fill, priced by cubic yard. * Seismic ground improvement, priced by treated area. * Urban land itself, which is the textbook case and the one Ormani names. Where the binding site cost is fixed rather than area-proportional, a permit, a study, an interconnection charge, the arithmetic does not work and air insulated wins as usual. Why buyers miss this trade. This is an observation about how the work is organized, not about engineering. The civil and geotechnical budget and the equipment budget usually live in different departments, with different approvers and different benchmarks. The department asked to approve the switchgear premium is not the department that books the savings in site preparation, and it is frequently not in the room when the geotechnical scope gets priced. An engineer comparing bay-for-bay equipment cost will conclude, correctly, that GIS is more expensive. The comparison only comes out differently if someone builds the site-preparation estimate under both footprints and puts the two totals side by side. On most projects nobody is asked to do that, because nobody owns the question. If you take one operational thing from this piece, it is that the GIS evaluation belongs in the siting review, not in the equipment review. Two things to settle before the footprint conversation. The insulating gas. Nothing Ameren has published says whether Goalby uses SF6 or an SF6-free alternative, and DistroForge LLC is not going to assume. For anyone specifying in 2026, gas selection is a lifecycle-cost and regulatory-risk decision in its own right, and it should be resolved before the footprint question rather than after. DistroForge LLC has covered the SF6-free switchgear question separately; start there if that is unsettled for your system. The operating change. A sealed, pressurized assembly removes visual verification of an open point. A lineman cannot look at a gas insulated bay and see an air gap the way they can at an air-break disconnect. That is a general property of the technology, and it means switching orders, tagging practice and operator training all change. Utilities absorb that routinely. It is still work, it lands on operations rather than on the project, and it should be scoped before commitment rather than discovered after energization. Where this trade is available and unrecognized. Ameren's release says the compact design is what made an undermined parcel usable. That is a repeatable situation, not a one-off, and it is findable. State geological surveys publish mined-area and subsidence maps, and state environmental agencies publish brownfield inventories. Put those alongside a utility's published capital plan and the overlap shows where an area-scaled site cost is about to meet a substation project. For anyone quoting into that overlap, the useful posture is to offer a compact alternate rather than wait to be asked for one, because the buyer's own qualifying question is probably still is the lot small enough. Compact designs are showing up in other constrained settings too, particularly around modular substations for data center interconnections and data center substation design, where the constraint is schedule and space rather than ground conditions. The short version. Goalby is one substation, and one project does not make a rule. What it does is show the rule clearly, because the utility stated the causation itself: the footprint is what allowed the site to be used. So when the GIS versus air insulated question comes up, do not start with the equipment. Start with what the ground costs, and whether that cost gets smaller when the station does. Siting decisions like this one surface in filings and utility releases months before they reach a purchase order. The Feeder is its free briefing on the regulatory shifts, supply chain signals and market forces that shape equipment procurement. Sign up here. Related reading. Frequently asked questions. When does a GIS substation beat an air insulated substation? How much smaller is a GIS substation? Why did Ameren choose GIS for the Goalby Substation? What should a buyer settle before comparing GIS and air insulated designs? Free Member Access Track this beat without paying per report. Free Member tier. Pick your topics. Get a weekly digest filtered to what you actually buy. Join free No credit card. Three topics minimum.