C

Crusoe

Builds AI data centers near cheap energy

Staff Data Center Planner - Space, Power & Cooling

Facilities ManagementPosted on Nov 24
Full-time$200k - $240k /yrIn-person

About the Job

Requirements

  • At least 8 years of experience in data center capacity planning, space and power planning, or mission-critical facilities engineering at a hyperscaler, colocation provider, or large enterprise, including ownership of planning across multiple sites or regions.
  • Working knowledge of data center electrical distribution, including medium voltage, UPS, PDUs, busway, and rack power; cooling systems, including air, rear-door heat exchangers, direct-to-chip liquid cooling, and CDUs; and redundancy models such as N, N+1, and 2N.
  • Understanding of the physical requirements of AI/GPU infrastructure, including rack density, weight, liquid cooling, and network cabling, and how these differ from traditional compute.
  • Strong spreadsheet skills and comfort with SQL or a business intelligence tool; able to build capacity models that others trust and reuse.
  • Ability to read data hall layouts, single-line diagrams, and mechanical drawings and turn them into usable capacity numbers.
  • Ability to explain physical constraints clearly to hardware, product, Finance, and leadership, and work through tradeoffs with engineering, construction, and operations teams.
  • Track record of setting direction for a planning function, influencing senior engineering and operations leaders without direct authority, and mentoring other planners.
  • Bachelor’s degree in Electrical, Mechanical, or Industrial Engineering, or an equivalent technical field.

Responsibilities

  • Validate that each planned deployment fits its target site and data hall, covering rack positions, kW per rack, air and liquid cooling capacity, and power distribution from utility feed to rack; provide a go, no-go, or at-risk assessment with conditions.
  • Work with DIG engineering and design teams on data hall layouts, hot aisle containment and row designs, and network core placement; confirm cabinet power and cooling assumptions for new platforms before designs are locked.
  • Build and maintain a view of space, power, and cooling capacity by site, data hall, and row, tracking designed, built, energized, allocated, and in-use capacity; replace manual analysis with models combining all three.
  • Own metrics such as the Capacity Health Index, stranded power, and stranded space; recommend oversubscription, re-layout, and consolidation strategies to recover usable capacity.
  • Assess the space, power, and cooling impact of retiring older fleets and replacing them with new platforms, including timing, reuse of existing infrastructure, and the sequence of moves.
  • Act as the main space, power, and cooling contact for capacity planning, cloud deployments, networking, DIG operations, and supply chain; ensure bills of materials passed to networking and deployment teams reflect the final physical plan.
  • Define planning standards, including rack power classes, density assumptions, design margins, and the hand-off between capacity planning and data center design.
  • Set the multi-year space, power, and cooling planning strategy across the portfolio, including density roadmaps for next-generation platforms; shape site selection, data hall design standards, and build sequencing with DIG leadership.
  • Mentor planners and analysts and help grow the space, power, and cooling planning function.

Desired Qualifications

  • Space and power planning experience for TPU, GPU, or other accelerator deployments at hyperscale.
  • Experience with data center infrastructure management (DCIM) tools, or building capacity tooling and automation.
  • Familiarity with power oversubscription methods and capacity modeling at the cluster or campus level.
  • Passion for green energy and aligning large-scale computing with environmental sustainability.

About the Company

Crusoe

Builds AI data centers near cheap energy

Crusoe builds and runs data centers for artificial intelligence, placing them near cheap or otherwise wasted energy and handling everything from the power supply to the cloud software. It developed the flagship campus in Abilene, Texas, for Stargate, the AI infrastructure project backed by OpenAI and Oracle. AI companies rent its GPU servers on demand or under longer contracts through Crusoe Cloud to train and run their models, while larger customers lease entire campuses that Crusoe develops and operates for them. The company was founded in 2018, when it began running computers at oil fields on natural gas that would otherwise have been burned off, and it is based in Denver.

Company size
1,001-5,000
Company stage
Debt Financing
Total funding
$17.9B
Headquarters
Denver, CO
Founded
2018

Recently Posted Jobs

Explore more opportunities at Crusoe

See more jobs