L

Leeward Renewable Energy

Independent operator of wind, solar, storage

Turbine Engineer 3

Full-TimeUpdated on 10/23/2026
$102k - $142k/yr
Mid
Bachelor's, Master's
Dallas, TX, USA
In PersonDallas office-based; travel at least 30% to wind sites.
Mechanical EngineeringMechanical Maintenance and Reliability Engineering
No H1B Sponsorship

About the job

Requirements
  • A bachelor's degree in mechanical or electrical engineering, or a similar field, from an ABET-accredited institution.
  • At least 4 years of relevant technical experience; wind power generation experience is preferred.
  • A thorough understanding of mechanical and electrical system component design, operation, and maintenance.
  • Ability to read and understand plans, specifications, and drawings, including one-line, three-line, hydraulic, and wiring diagrams.
  • Ability to work independently with minimal supervision, manage multiple priorities in a complex environment, and meet deadlines.
  • Competence with Microsoft Office software.
  • A valid driver's license and ability to operate a motor vehicle.
  • Ability to meet physical requirements including standing, sitting, walking, kneeling, twisting, reaching, and climbing at project locations.
  • Ability to work in confined spaces or at heights of 200–300 feet for prolonged periods.
  • Current authorization to work for any employer in the United States full time without an employment visa, now or in the future.
Responsibilities
  • Develop and implement solutions to proactively improve plant performance and reliability.
  • Interpret and analyze equipment performance data, including SCADA tags, condition monitoring, power quality, and event files, to resolve issues.
  • Drive resolution of recurring performance or reliability issues and support CAPEX/OPEX planning with technical input.
  • Propose and implement engineering solutions within defined parameters, operating with moderate independence.
  • Collaborate with adjacent support groups, including asset management, health, safety, and environment, and compliance; interface with suppliers.
  • Interact with internal and external clients to clarify requirements and provide technical input.
  • Partner with senior colleagues across departments and mentor less experienced team members.
  • Assess wind turbine technical issues at wind farms and develop reliability and performance improvements.
  • Provide periodic on-site project management during project execution.
  • Develop data analytical models for wind plant operational performance.
  • Produce technical reports, including root cause analyses, financial models and payback evaluations, and equipment condition evaluations.
  • Travel to and work at wind sites, including performing physically demanding work such as climbing wind turbines.
Desired Qualifications
  • A master's degree is preferred.
  • Experience with wind power generation is preferred.

About the company

L

Leeward Renewable Energy

View

Leeward Renewable Energy develops and operates utility-scale wind, solar, and energy storage projects across the United States, owning a portfolio of 30 sites with a total capacity of 4 GW. It manages the full project lifecycle—from development and construction to long-term ownership and operation—selling power under long-term PPAs to utilities, corporations, and other offtakers. Its approach relies on long-term ownership and strong community partnerships, providing stable, durable energy as it maintains assets over time. The company aims to grow its wind, solar, and storage portfolio and deliver dependable clean energy through long-term agreements that support communities and customers.

Company Size

201-500

Company Stage

Debt Financing

Total Funding

$1.6B

Headquarters

Dallas, Texas

Founded

2015

Get referred to Leeward Renewable Energy

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • Leeward finished 525 MW in Oklahoma in July 2026, converting backlog into revenue.
  • Fitch affirmed BB- in July 2026, signaling stable access to project debt.
  • Harvey Solar’s 350 MW acquisition expands Ohio optionality and deepens LRE’s national pipeline.

What critics are saying

  • Illinois Bureau wind was delayed in June 2026, showing federal permitting can freeze LRE projects.
  • Harvey Solar stays pre-construction until 2028, exposing Ohio returns to permitting and interconnection slippage.
  • If Google redirects future Oklahoma PPAs, LRE loses its clearest financing engine and growth narrative.

What makes Leeward Renewable Energy unique

  • Google-backed Oklahoma portfolio proves LRE can finance and execute 725 MW at scale.
  • Sierra Pinta’s 112.5 MW Arizona BESS gives LRE credible storage depth beyond pure solar.
  • Leeward’s 31-project, 3,952 MW contracted fleet supports long-duration cash flow and lender confidence.

Help us improve and share your feedback! Did you find this helpful?

Benefits

  • Professional Development Budget
  • Conference Attendance Budget
  • Flexible Work Hours

Growth & Insights and Company News

6 month growth

9%

1 year growth

9%

2 year growth

9%
Business Wire
Mar 25th, 2026
LRE Acquires Harvey Solar, Expanding Energy Infrastructure and Community Investment in Licking County, Ohio

LRE (Leeward Renewable Energy) announced the acquisition of the Harvey Solar Project, a planned 350 megawatt (MW) solar facility located in Licking County, O...

Pryor Learning Solutions
Jan 17th, 2025
LRE Launches Renewable Energy Projects to Power Google's Oklahoma Data Center and Enhance State's Energy Infrastructure

The construction phase alone is expected to create more than 300 jobs, emphasizing local hiring and the use of domestically manufactured equipment, demonstrating LRE's dedication to responsible development and economic growth in Oklahoma.

SolarQuarter
Jan 16th, 2025
LRE Secures Over 700 MW of Renewable Energy Projects in Oklahoma with Google Partnership

Leeward Renewable Energy (LRE), a prominent American renewable energy company, has announced a major milestone with the launch of over 700 megawatts (MW) of renewable energy projects in Oklahoma, supported by long-term power purchase agreements (PPAs) with Google.

SolarTex
Dec 19th, 2024
200-MW solar project now producing power for Microsoft

LRE acquired the Morrow Lake Solar Project in 2023 from Red River, a joint venture of SunChase and Eolian, which initiated the development of the Morrow Lake Solar Project in 2017.

Business Wire
Jul 16th, 2024
Leeward Renewable Energy Secures $1.25 Billion in Warehouse Facility Financing to Accelerate Construction of Renewable Energy Projects

Leeward Renewable Energy (LRE), a leading renewable energy company, today announced the closing of its $1.25 billion construction warehouse facility (