W

Wabtec

Develops electric locomotives and digital solutions

Test Engineer 3

Full-TimePosted on 10/23/2026
$68.9k - $98.2k+ Annual bonus, if eligible
Senior
Bachelor's, Master's
Buffalo Grove, IL, USA
In Person
Manufacturing Quality & TestInspection & Test

About the job

Requirements
  • A bachelor's degree in mechanical or electrical engineering; an ABET-accredited program is specified.
  • At least 6 years of relevant experience.
  • Ability to lead testing activities and coordinate cross-functional efforts.
  • Experience testing and validating mechanical, electrical, and electro-mechanical systems, preferably in transportation, industrial, or related industries.
  • Working knowledge of electrical and mechanical systems, engineering principles, and manufacturing processes.
  • Ability to occasionally lift or move up to 20 pounds.
  • Specific vision abilities include close, distance, peripheral vision, and depth perception.
  • Frequently reach with hands and arms and talk or hear; occasionally stand, walk, sit, use hands to finger, handle, or feel, and stoop, kneel, crouch, or crawl.
Responsibilities
  • Lead verification and validation activities supporting bus product lines, including door systems, wheelchair lifts and ramps, windows, driver’s barriers, and charging products.
  • Develop test methods, execute validation testing, analyze results, and investigate root causes to ensure products meet performance, reliability, safety, and compliance requirements.
  • Provide technical recommendations supporting product development, sustaining engineering, and continuous improvement.
  • Design, build, and execute mechanical, electrical, and electro-mechanical test systems.
  • Collect, review, and analyze data, and draw clear conclusions and next steps.
  • Write reports and maintain clear documentation and communication across teams.
  • Maintain test setups, fixtures, calibrated equipment, and laboratory equipment.
  • Ensure testing complies with applicable standards, specifications, and safety requirements.
  • Lead root cause investigations for product and field failures and recommend corrective actions.
  • Develop and maintain 5S or other laboratory standards.
  • Support APQP/NPD processes and ensure compliance with applicable standards and requirements.
  • Collaborate with design, quality, and manufacturing teams on prototype builds, validation plans, and product improvements.
  • Support Sales and Field Service in resolving technical issues.
  • Troubleshoot mechanical and electrical systems hands-on.
  • Recommend and implement improvements to test methods, processes, and laboratory practices.
  • Provide technical guidance and support to engineers, technicians, and cross-functional teams.
  • Perform other duties outside the employee’s function or trade when requested; adequate training will be provided if necessary.
Desired Qualifications
  • A master's degree is preferred.
  • Experience testing and validating mechanical, electrical, and electro-mechanical systems in transportation, industrial, or related industries is preferred.

About the company

Wabtec provides transportation solutions by designing and producing electric locomotives and related services for freight railroads, transit authorities, and industrial operators. Its flagship product, the FLXdrive, is a 100% battery-electric locomotive with a battery pack over 7 megawatt-hours that cuts fuel use and emissions, while the company also sells traditional locomotives, aftermarket services, and digital solutions to optimize operations. Wabtec differentiates itself through a fully electric propulsion option paired with value-added digital tools and manufacturing techniques like mixed-reality work processes, aiming to improve efficiency and sustainability across rail networks. The company’s goal is to make rail transport more efficient and eco-friendly by delivering reliable locomotives, ongoing maintenance, and advanced software and digital capabilities that help customers run greener, lower-cost operations.

Company Size

10,001+

Company Stage

IPO

Headquarters

Pittsburgh, Pennsylvania

Founded

1872

Get referred to Wabtec

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • Q2 2026 sales reached $3.18 billion, and adjusted EPS rose 21.6%.
  • Management raised 2026 revenue guidance to $12.30 billion-$12.60 billion on July 22, 2026.
  • Multi-year backlog hit $30.93 billion, with 12-month backlog up 11.3% year over year.

What critics are saying

  • Progress Rail sued Wabtec in 2023; settlement on February 26, 2026 left breach claims history.
  • Wabtec’s premium valuation demands flawless execution after 17.5% Q2 2026 revenue growth.
  • Heavy debt-funded acquisitions, including Dellner and Frauscher, raise integration and return-risk through 2027.

What makes Wabtec unique

  • Wabtec bundles locomotives, signaling, and inspection through 2025-2026 acquisitions.
  • FLXdrive battery-electric locomotives and Forsee Power deepen Wabtec’s electrification edge.
  • Railroad incumbency plus $30.93 billion backlog locks in long-cycle customer relationships.

Help us improve and share your feedback! Did you find this helpful?

Benefits

  • Health Insurance
  • 401(k) Retirement Plan
  • Performance Bonus
  • Flexible Work Hours

Growth & Insights and Company News

6 month growth

30%

1 year growth

30%

2 year growth

30%
Yahoo Finance
Jul 23rd, 2026
Wabtec stock trades at premium valuation despite $30B order backlog and rail business headwinds

Westinghouse Air Brake Technologies (Wabtec) has surged 39% over the past year, trading at the top of its 52-week range following 17.5% sales growth and an increased forecast. The rail technology manufacturer now holds a multi-year order backlog exceeding $30 billion. However, investors face a steep premium. The stock trades at a price-to-earnings ratio of 35.1, well above the S&P 500's 24.3. Price-to-sales and price-to-operating-cash-flow multiples also exceed market averages at 3.7 and 22.3 respectively. Revenue has grown 10.2% annually over three years, outpacing the S&P 500's 5.9%. The 12-month backlog rose 11% whilst the multi-year backlog jumped 42%. Debt stands at a manageable 14.7% of market value. Operating cash flow reached approximately $2 billion over the past twelve months.

Yahoo Finance
Jul 22nd, 2026
Wabtec beats Q2 estimates with $2.76 EPS as revenues hit $3.18B

Westinghouse Air Brake Technologies reported second-quarter earnings of $2.76 per share, surpassing the Zacks Consensus Estimate of $2.63 per share. This represents a 4.94% earnings surprise and compares to $2.27 per share a year ago. The locomotive, subway, and bus parts maker posted revenues of $3.18 billion for the quarter ended June 2026, exceeding estimates by 3.20%. This compares to year-ago revenues of $2.71 billion. The company has topped consensus estimates for both earnings and revenue in each of the last four quarters. Wabtec shares have risen 23.5% year-to-date, outpacing the S&P 500's 9.7% gain. The stock currently holds a Zacks Rank #2 (Buy) rating.

Yahoo Finance
Jul 15th, 2026
Wabtec to report Q2 2026 earnings on 22 July, sales expected to reach $3.08B

Westinghouse Air Brake Technologies, operating as Wabtec Corporation, is set to report second-quarter 2026 results on 22 July before market open. The Zacks Consensus Estimate for earnings stands at $2.63 per share, representing a 15.9% increase from the year-ago period. Revenue is expected to reach $3.08 billion, up 13.8% year over year. Wabtec has beaten earnings estimates in each of the past four quarters, delivering an average surprise of 3.97%. However, the company's second-quarter performance may face headwinds from higher operating expenses, geopolitical tensions in the Middle East, and supply-chain disruptions. Offsetting these challenges, stronger demand for services and components across aftermarket and OEM channels is expected to support top-line growth. Freight revenues are forecast at $2.19 billion, whilst Transit revenues are projected at $839.37 million.

Yahoo Finance
Jun 15th, 2026
Forsee Power and Wabtec team up to electrify locomotives with advanced battery tech

Forsee Power, a smart battery systems specialist, has signed a Memorandum of Understanding with Wabtec to integrate advanced battery systems into battery-electric locomotive platforms. Wabtec, which unveiled the world's first battery-electric freight locomotive in 2021, will collaborate with Forsee Power to enhance performance and reliability whilst optimising costs. Forsee Power's PULSE PLUS RAIL battery system, built on Toshiba's latest-generation LTO cells, offers up to 20 years lifespan, high-power output and voltage range up to 1,500 VDC. The system features advanced liquid thermal management for extreme temperatures and meets the highest safety standards. The partnership leverages Forsee Power's industrial presence in Ohio for Buy America compliance. The electrical architecture suits both freight and passenger rail applications, with potential expansion into mining trucks.

Yahoo Finance
Jun 1st, 2026
Wabtec tops heavy transportation equipment Q1 earnings with $2.95B revenue, up 13% YoY

Wabtec reported Q1 revenues of $2.95 billion, up 13% year on year, meeting analysts' expectations. The railway equipment and systems provider delivered mixed results overall, beating EBITDA estimates but missing organic revenue projections. CEO Rafael Santana highlighted strong execution across the company's businesses, driving double-digit sales and adjusted earnings per share growth. The stock has risen 1.4% since reporting, currently trading at $261.22. Across the heavy transportation equipment sector, the 12 tracked stocks reported satisfactory Q1 results, with revenues and forward guidance broadly aligned with consensus estimates. However, share prices have declined 2.3% on average since earnings announcements. Douglas Dynamics delivered the sector's standout performance, with revenues of $137.8 million exceeding expectations by 3.4%.