S

Savannah River Mission Completion

Manages legacy liquid radioactive waste cleanup

Engineer – Mid-Level to Senior

Full-TimeDeadline 11/19/26
$76k - $188k/yr
Mid, Senior, Expert
Bachelor's, Master's
Aiken, SC, USA
In Person
Mechanical Engineering

About the job

Requirements
  • A Master's degree in Engineering from an accredited college or university, or currently working toward a Master's degree in Engineering with expected graduation by August 31, 2026; applicants pursuing the degree must include the expected graduation date on their resume.
  • A Bachelor's degree in Engineering from an accredited college or university, with years of relevant professional engineering experience.
Responsibilities
  • Develop conventional engineering and scientific solutions to technical tasks or project objectives, learning SRMC and Department of Energy systems, methodologies, and requirements; assist more senior engineering personnel on complex tasks.
  • Accept delegated technical responsibility for a limited phase of a scientific or engineering program and support engineers or scientists performing related program phases.
  • Assist with studies, development, testing, and analysis of designs, processes, or procedures related to a limited phase of a system or program.
  • Plan and develop conventional engineering and scientific solutions for technical problems or project objectives using SRMC engineering methodologies and requirements, and assist more senior personnel on complex tasks.
  • Assume technical responsibility for one or more program phases and/or ownership for unit operations within processing facilities; collaborate with colleagues to improve existing processes.
  • Provide assignments such as project engineering support, facility engineering support, process flowsheet analysis and development, procurement requirements and specifications development, technical calculations and reviews, design reviews, safety analysis development, and commercial-grade dedication.
  • Provide innovative methods or solutions for diverse, highly complex problems requiring in-depth analysis of tangible and intangible factors and creative use of established methods.
  • Collaborate across the company, including with senior management, and periodically with external stakeholders and organizations such as the Department of Energy, regulators, and affiliates.
  • Serve as primary technical contact on large projects and collaborate with site industry experts and service, material, and technology providers.
  • Serve as Design Authority responsible for maintaining assigned systems, structures, and components for the assigned area or function.
  • Ensure system configurations are managed safely and effectively.
  • Maintain consistency between the Safety Basis or Technical Baseline and facility physical configurations.
  • Monitor and track the status of assigned systems.
  • Assist Operations in determining equipment operability, correcting out-of-specification conditions, and evaluating questionable data.
Desired Qualifications
  • Knowledge of advanced engineering principles and practices to develop appropriate outputs.
  • Working knowledge of National Codes and Standards.
  • Ability to adapt and work in a changing environment with multiple demands and priorities.
  • Ability to express ideas clearly and concisely, verbally and in writing.
  • Sound technical knowledge of the discipline's standard concepts, principles, and techniques, with the ability to apply formal training.
  • Ability to perform walkdowns.
  • GPA of 2.8 or higher; applicants should list GPA in their profile.

About the company

S

Savannah River Mission Completion

View

SRMC is a prime U.S. Department of Energy contractor that manages the treatment and disposal of radioactive liquid waste at the Savannah River Site in South Carolina. Its work brings together BWX Technologies, Amentum, and Fluor under the Integrated Mission Completion Contract to run all liquid-waste facilities in one program. The process separates high-level waste, which is vitrified at the Defense Waste Processing Facility, from a large volume of salt waste that is solidified and disposed of in Saltstone Disposal Units. Its goal is to complete tank closures by 2037, using methods such as the Next Generation Solvent, drones, and artificial intelligence to map sites and optimize cleanup.

Company Size

501-1,000

Company Stage

N/A

Total Funding

N/A

Headquarters

N/A

Founded

N/A

Get referred to Savannah River Mission Completion

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • SRMC achieved eight preliminary cease waste removals in under two years by May 2026.
  • August 2026 plan cut 300 canisters, improving DWPF efficiency and extending disposal capacity.
  • September 2026 construction started on the final mega-size disposal unit, de-risking the mission timeline.

What critics are saying

  • DOE depends on one contractor; any performance failure threatens 2037 tank-closure credibility.
  • SDU 12 remains under construction; delayed disposal capacity can bottleneck SWPF throughput in 2027.
  • A serious worker injury or radiological event could trigger DOE enforcement, shutdowns, and rebid pressure.

What makes Savannah River Mission Completion unique

  • SRMC uniquely combines SWPF, DWPF, tank farms, and Saltstone under one DOE contract.
  • BWX, Amentum, and Fluor bring nuclear operations, remediation, and federal-project execution depth.
  • Drones and AI now support tank mapping, sampling, and closure acceleration at SRS.

Help us improve and share your feedback! Did you find this helpful?

Benefits

  • 401(k) Retirement Plan
  • 401(k) Company Match
  • Health Insurance
  • Dental Insurance
  • Vision Insurance
  • Health Savings Account/Flexible Spending Account
  • Paid Vacation
  • Paid Holidays
  • Parental Leave
  • Life and Accident Coverage
  • Disability Insurance
  • Employee Assistance Program