Full-Time

Director of Safety

Health, Safety, and Environmental

Updated on 8/18/2026

Giga Energy

Giga Energy

51-200 employees

Flare gas-to-power Bitcoin mining infrastructure

No salary listed

Houston, TX, USA

Hybrid

Full-time on-site expectations, except for bi-weekly work-from-home Fridays; travel to project and customer sites is estimated at 20%.

Category
Legal & Compliance (1)
Required Skills
OSHA

Get referred to Giga Energy

See people who can refer or advise you

Requirements
  • At least 8 years of progressive health, safety, and environmental experience in industrial, construction, manufacturing, or electrical infrastructure environments.
  • Demonstrated success building or significantly scaling an HSE program within a fast-moving, multi-site operation.
  • Deep working knowledge of OSHA 29 CFR 1910 and 1926, EPA regulations, and applicable state-level equivalents.
  • Experience managing HSE across fixed facilities, field and construction environments, and customer-site field service operations simultaneously.
  • A proven track record conducting incident investigations and driving systemic corrective actions that reduce recurrence.
  • Strong written and verbal communication skills, with the ability to translate complex regulatory requirements into practical, actionable guidance for field teams.
  • Proficiency with HSE management software and reporting tools.
  • Ability and willingness to travel to project sites, customer facilities, and field service locations as needed, estimated at 20%.
Responsibilities
  • Design, implement, and continuously improve Giga’s HSE management system across manufacturing, field construction, data center operations, and after-sales field service activities.
  • Serve as the company’s subject matter authority on OSHA, EPA, NFPA, and other applicable federal, state, and local regulatory requirements.
  • Develop and enforce incident prevention programs, safety training curricula, and emergency response protocols for all sites and job classifications.
  • Lead incident investigations, including root cause analysis, corrective action tracking, and reporting, and drive a culture of transparency and continuous improvement.
  • Partner with project managers, superintendents, and operations leads to embed safety requirements into project planning, site mobilization, and day-to-day execution.
  • Develop HSE protocols for after-sales field service teams covering commissioning, startup, maintenance, and warranty repair work at customer sites, ensuring technicians are trained and equipped to work safely in diverse operating environments.
  • Own relationships with regulatory agencies and manage compliance filings, audits, permits, and environmental reporting obligations.
  • Build and lead a small HSE team as the company scales; define team structure, hire, and develop talent.
  • Track, analyze, and report leading and lagging safety metrics to senior leadership, using data to prioritize risk-reduction initiatives.
  • Manage HSE-related vendor and subcontractor qualifications, including pre-qualification requirements and on-site compliance expectations.
  • Champion sustainability and environmental stewardship practices aligned with Giga’s growth and customer commitments.
Desired Qualifications
  • Certified Safety Professional (CSP) or a similar credential such as CHMM, CIH, or OHST.
  • Experience supporting data center construction, electrical equipment manufacturing, or utility-scale renewable energy projects.
  • Familiarity with ISO 45001 Occupational Health and Safety or ISO 14001 Environmental Management standards.
  • Background in startups or high-growth companies where programs had to be built with limited resources.
  • Experience managing environmental permitting for air, stormwater, and hazardous waste across multiple jurisdictions.

Giga Energy converts flare gas from oil and gas wells into electricity to power modular data centers used for Bitcoin mining. The company designs, builds, and operates on-site power generation equipment and modular data centers directly at well sites, turning wasted natural gas into usable energy. Revenue comes from selling the power infrastructure and data centers, plus a share of the Bitcoin mined fuelled by that power. Competitively, Giga Energy focuses specifically on flare-gas monetization for oil and gas operators, combining energy infrastructure with crypto mining to create an on-site, end-to-end solution rather than just selling equipment or services. The goal is to reduce gas flaring, monetize previously wasted gas, and provide a practical revenue stream by mining Bitcoin at the source.

Company Size

51-200

Company Stage

Series A

Total Funding

$10M

Headquarters

Houston, Texas

Founded

2019

Get referred to Giga Energy

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • Matt Prusak joined August 4, 2026, strengthening business development and finance.
  • CTO Angad Sandhu joined May 21, 2026 from Google and Tesla.
  • Series A-1 raised March 2, 2026 at a roughly $607 million valuation.

What critics are saying

  • Luxor sued Giga on January 30, 2026 for poaching and trade-secret theft.
  • Royse City residents protested Giga's July 2026 data center over water and noise.
  • Bitcoin-mining roots face commoditization; AI pivot success depends on securing cheap power quickly.

What makes Giga Energy unique

  • Vertically integrated transformers, switchboards, and modular data centers shorten energization timelines.
  • Giga Power Systems, launched January 13, 2026, monetizes flexible-load downtime directly.
  • 175 MW operating sites and 500+ MW pipeline show real deployment scale.

Help us improve and share your feedback! Did you find this helpful?

Benefits

Health Insurance

Dental Insurance

Vision Insurance

401(k) Company Match

Unlimited Paid Time Off

Parental Leave

Health Savings Account/Flexible Spending Account

Commuter Benefits

Stock Options

Growth & Insights and Company News

Headcount

6 month growth

0%

1 year growth

-1%

2 year growth

-5%
CoinGape
Aug 4th, 2026
American Bitcoin names Paul Sacks Interim CFO following matt Prusak's exit.

American Bitcoin names Paul Sacks Interim CFO following matt Prusak's exit. American Bitcoin reported record Q2 Bitcoin production and $67 million in revenue while appointing Paul Sacks as Interim CFO. Published by Key Highlights * American Bitcoin reported $67 million in Q2 revenue and mined a record 932 BTC, up 14% quarter-over-quarter. * As Bitcoin treasury holdings reach 8,002 BTC, Paul Sacks has been appointed Interim CFO, effective August 4. * Matthew Prusak resigned as President and Interim CFO, while the President role remains vacant. The Eric Trump-led American Bitcoin has announced a major leadership transition while reporting second quarter results with record Bitcoin production. It has appointed Paul Sacks as Interim Chief Financial Officer (CFO) following the resignation of President and Interim CFO Matthew Prusak. The announcement coincides with American Bitcoin's second-quarter earnings. It has reported continued growth in its Bitcoin mining operations and treasury strategy despite softer-than-expected revenue. Who is American Bitcoin's new CFO Paul Sacks. The executive reshuffle was disclosed in a Form 8-K filed with the U.S. Securities and Exchange Commission (SEC). The board of directors approved Sacks' appointment on July 31. Sacks will continue serving as Head of Derivatives, alongside his role of American Bitcoin'sCFO. The appointment is significant as Sacks recently joined American Bitcoin in May 2026 after serving as Co-Head of Digital Exotics at BlockFills, where he focused on institutional digital asset derivatives. Prior to that, he co-founded Digital Gamma, a firm specializing in cryptocurrency derivatives and risk management. The company also entered into a standard indemnification agreement with Sacks, similar to those signed by its other executive officers. The move comes after American Bitcoin's Matthew Prusak resigned from his dual roles as President and Interim Chief Financial Officer, effective August 4. According to the SEC filing, Prusak's departure was voluntary and not the result of any disagreement with the company regarding its operations, accounting practices, financial reporting, or corporate policies. In his Linkedin post, Matthew announced that he is joining Giga Energy as Chief Business Officer and Interim CFO. While American Bitcoin moved swiftly to appoint Sacks as Interim CFO, the company has not named a replacement for the President position, leaving the role vacant. American Bitcoin reports record Bitcoin production in Q2. The executive transition comes at an important stage for American Bitcoin. The Trump brothers-led company is expanding both its mining operations and Bitcoin treasury strategy. In its Q2 2026, American Bitcoin generated $67 million in revenue even though it missed analysts' consensus estimate of $73.8 million. Despite the revenue miss, the company delivered strong operational performance. As per its official release, during the quarter, American Bitcoin mined a record 932 BTC, marking a 14% increase quarter-over-quarter. It also expanded its corporate Bitcoin treasury to 8,002 BTC by the end of June. Q2 2026 was $ABTC highest quarterly Bitcoin production on record. "Despite Bitcoin headwinds in Q2, CoinGape stayed focused on what CoinGape can control: CoinGape delivered its highest quarterly production on record, grew its strategic reserve to over 8,000 Bitcoin, and strengthened the... pic.twitter.com/050e1UyK7r - American Bitcoin (@ABTC) August 3, 2026 Other Articles... 18 hours ago Coinbase-Circle Partnership to Renew on Same Terms, CFO Alesia Haas Says Read now 1 day ago Public or Private Blockchains: Where Is Wall Street Building? Read now. Despite missing revenue estimates as per a CoinGape report, management remained confident in its long-term strategy. CEO Mike Ho said in the earnings calls that "production, not price, drove our growth this quarter". He emphasized that record Bitcoin output, rather than favorable market conditions, fueled the company's performance. Ho also reiterated the firm's commitment to its Bitcoin treasury strategy, noting that "we did not sell a single Bitcoin from our balance sheet reserve". This is similar to Strategy, whose Executive Chairman Michael Saylor recently clarified that the company would remain a net buyer of BTC despite speculation around a potential $5 billion Bitcoin sale. Ho also highlighted growing competition from artificial intelligence infrastructure, saying that "since the ChatGPT moment, we've seen a flurry of new developers coming in to source the same power". This comes as AI data centers are now increasingly competing with Bitcoin miners for electricity and suitable sites. Both Eric Trump and Mike Ho reiterated American Bitcoin's focus on scaling mining infrastructure. It now eyes improving operational efficiency, and strengthening its balance sheet through disciplined capital allocation. Thus, with more than 8,000 BTC on its balance sheet and record quarterly Bitcoin production, the company is focusing on scaling operations while strengthening its financial leadership. Investors will now be watching for the appointment of a permanent CFO and a new President as American Bitcoin pursues its next phase of growth. Why trust CoinGape: CoinGape has covered the cryptocurrency industry since 2017, aiming to provide informative insights to its readers. Its journalists and analysts bring years of experience in market analysis and blockchain technology to ensure factual accuracy and balanced reporting. By following its Editorial Policy , its writers verify every source, fact-check each story, rely on reputable sources, and attribute quotes and media correctly. CoinGape also follow a rigorous Review Methodology when evaluating exchanges and tools. From emerging blockchain projects and coin launches to industry events and technical developments, CoinGape cover all facets of the digital asset space with unwavering commitment to timely, relevant information. Investment disclaimer: The content reflects the author's personal views and current market conditions. Please conduct your own research before investing in cryptocurrencies, as neither the author nor the publication is responsible for any financial losses. Ad Disclosure: This site may feature sponsored content and affiliate links. All advertisements are clearly labeled, and ad partners have no influence over its editorial content. Something big to share? Your crypto brief. Delivered every week. * Insights that move markets * Trusted by top investors and builders * Stay ahead every week. Want CoinGape to cover your story? Sneha Agrawal With over four years of experience in covering and tracking the financial markets, Sneha Agrawal is a dedicated Crypto Journalist and Editor with passion for researching and writing the crypto pieces. She is currently leading the Block of Fame, here at CoinGape. She likes to keep track of political, legal and financial happenings all around the world - without which she deems her day incomplete. Apart from her Journalistic endeavours, she is a solo traveler, museum goer, and a keen reader of books.

Yahoo Finance
Aug 3rd, 2026
Matt Prusak leaves American Bitcoin for Giga Energy as CBO and interim CFO

Matt Prusak has left American Bitcoin to join Giga Energy as chief business officer and interim CFO, according to a LinkedIn post. Giga is an AI and HPC infrastructure provider. Prusak departed his roles as president and interim CFO of American Bitcoin on 4 August. Paul Sacks, who will continue as head of derivatives, replaced him as interim CFO. Previously, Prusak held infrastructure positions at US Bitcoin and Hut 8, and served as CEO of Ionic Digital before helping launch American Bitcoin in 2025. He initially led the company as CEO until its Nasdaq listing in September, then became president and interim CFO. American Bitcoin reported $67 million revenue and a $57.2 million net loss for Q2 2026.

Crypto World
Aug 3rd, 2026
Trump-backed American Bitcoin (ABTC) executive Matt Prusak joins Giga Energy.

Trump-backed American Bitcoin (ABTC) executive Matt Prusak joins Giga Energy. CryptoWorld August 3, 2026 American Bitcoin Matt Prusak, president and interim chief financial officer of Trump-linked bitcoin miner American Bitcoin (ABTC), is leaving the company to join AI and energy infrastructure developer Giga Energy, marking another senior executive move toward the power sector that is increasingly underpinning both bitcoin mining and artificial intelligence. Prusak said he will step down from American Bitcoin effective Aug. 4 and join Giga Energy as chief business officer and interim CFO. He said in emailed comments that after "years building bitcoin businesses," he was shifting "upstream to the power infrastructure now constraining both mining and AI compute." The departure reflects a broader shift as bitcoin miners reposition around AI and power infrastructure. As mining becomes increasingly commoditized and margins come under pressure, a growing number of miners are pivoting toward artificial intelligence infrastructure, repurposing their power, land and data center expertise to serve the surging demand for AI compute. The shift has accelerated as hyperscalers race to secure electricity and capacity, allowing mining companies to diversify revenue beyond bitcoin production and tap the higher valuations being awarded to AI infrastructure businesses.

Community Newspaper Holdings Inc.
Jul 28th, 2026
Royse City town hall scheduled for Thursday on proposed Giga Energy data center.

Royse City town hall scheduled for Thursday on proposed Giga Energy data center. Meeting is scheduled from 5 p.m. to 8 p.m. at Smoke Sessions BBQ at 307 State Highway 66. * By Kent Miller | [email protected] * Jul 28, 2026 Updated Jul 28, 2026 The public will have an opportunity to learn more about a proposed data center just outside Royse City during a town hall meeting hosted by Houston-based Giga Energy on Thursday. The meeting is scheduled from 5 p.m. to 8 p.m. at Smoke Sessions BBQ, 307 State Highway 66 in Royse City. Organizers have released few details but an initial agenda indicates the event will include a presentation, a general question-and-answer session and individual stations where attendees can ask more detailed questions. The proposed BT Gateway Data Center would occupy about 30 acres along County Road 2656 outside Royse City, with approximately 20 acres slated for development. Giga Energy CEO and co-founder Brent Whitehead said the project's main building would cover about two acres and would house artificial intelligence computing operations. Construction is expected to take about 12 months, with a target completion date of mid-2027. Company officials said the facility would use a closed-loop cooling system that is filled once with a water-and-glycol mixture that continually recirculates, eliminating evaporative water loss during normal operations. The project would receive electricity through existing three-phase distribution lines rather than requiring new high-voltage transmission lines. Giga Energy said it would pay for any infrastructure improvements needed to connect the facility to the electric grid. To address concerns about noise, the company said cooling equipment would be installed at ground level instead of on rooftops. Plans also call for a permanent sound wall around the property, temporary sound barriers during construction and landscaping designed to reduce both noise and visual impacts. Construction is expected to employ about 300 workers over the course of the project, with no more than about 100 workers on-site at any one time. Once operational, the data center is expected to employ between 20 and 24 full-time workers in skilled technical positions with six-figure salaries. Giga Energy said it is not seeking tax abatements or other public subsidies for the project. Company officials estimate the development would generate approximately $7.2 million annually in county property tax revenue. No additional information about Thursday's town hall has been released.

Community Newspaper Holdings Inc.
Jul 21st, 2026
Giga Energy introduces proposed project near Royse City.

Giga Energy introduces proposed project near Royse City. New owner of data center in far West Hunt County speaks with county commissioners. * By Kent Miller | [email protected] * Jul 21, 2026 Updated 11 hrs ago GREENVILLE - The Hunt County Commissioners Court at last week's regular session heard a presentation from Houston-based Giga Energy on a proposed data center development on County Road 2656 near Royse City. County officials said Giga Energy requested the meeting to introduce the project and answer questions from commissioners and the public. Speaking by Zoom from Houston, Brent Whitehead - co-founder and chief operating officer of Giga Energy - said the company develops, builds, owns and operates its own data centers rather than serving solely as an investment firm. "Our goal is to build electrical infrastructure that helps modernize the electric grid," Whitehead said. The proposed BT Gateway Data Center would occupy about 30 acres outside Royse City, with roughly 20 acres slated for development. Whitehead said the main building would cover about two acres and would process artificial intelligence computing workloads. Construction is expected to take about 12 months with a target completion date of mid-2027, he said. Whitehead described the facility as a "micro data center" compared with larger artificial intelligence campuses being developed elsewhere in Texas. He said Hunt County was selected because existing electrical capacity is available through Farmers Electric Cooperative. Rather than requiring construction of new substations or major transmission infrastructure, Giga Energy plans to purchase unused electrical capacity already available on the system. Whitehead said the company would pay for any electrical upgrades needed to serve the project instead of passing those costs on to cooperative members. The company plans to hold a public town hall meeting within the next one to two weeks to provide a more detailed presentation, answer questions and host breakout discussions on topics including water, electricity and noise. "We want to answer every concern," Whitehead said. Water use has emerged as one of the project's primary concerns among nearby residents, Whitehead acknowledged. He said the facility would use a closed-loop cooling system filled once with a water-and-glycol mixture that continually recirculates, eliminating evaporative water loss. Annual water consumption would be roughly equivalent to that of about 2[1/2] homes, with most usage coming from employee restrooms and sinks, he said. Whitehead added that Giga Energy could truck in water if requested and would consider helping fund water infrastructure improvements if nearby residents need expanded service. The facility would receive power through existing three-phase distribution lines rather than new high-voltage transmission lines, Whitehead said. He said Giga Energy would pay for any infrastructure improvements required to connect the project. Addressing noise concerns, Whitehead said cooling equipment would be installed at ground level instead of on rooftops, a permanent sound wall would surround the property, temporary sound barriers would be used during construction and landscaping would help reduce both noise and visual impacts. He said company sound studies are intended to ensure nearby road traffic would generate more noise than the completed facility. Whitehead also said environmental studies conducted by third-party consultants included habitat assessments, wetland delineations and other environmental reviews. The site is not located in wetlands and is not expected to affect protected species, he said. Construction is expected to employ about 300 workers over the course of the project, with no more than about 100 on site at one time. Whitehead said the company intends to use local contractors whenever possible and coordinate with county officials on traffic management and road repairs. Once operational, the data center is expected to employ between 20 and 24 full-time workers in skilled technical positions paying six-figure salaries, Whitehead said. Whitehead said Giga Energy is not seeking tax abatements or other public subsidies for the project. He estimated the development would generate approximately $7.2 million annually in county property tax revenue.