A

AltaLink

Manages electricity transmission infrastructure in Alberta

Transmission Line Design Engineer or Engineer-in-Training

Full-TimeUpdated on 10/23/2026
No salary listed
Junior, Mid
Bachelor's
Calgary, AB, Canada
In PersonOn-site in Calgary; travel to site as required.
Electrical EngineeringPower Systems Engineering

About the job

Requirements
  • A bachelor's degree in Mechanical, Civil, or Electrical Engineering is required.
  • Be an Engineer-in-Training or Professional Engineer with the Association of Engineers and Geoscientists of Alberta (APEGA), or qualify for registration with APEGA.
  • Demonstrate the ability to perform the listed responsibilities.
  • Demonstrate experience delivering complex transmission line designs from concept through close-out, including coordination with project managers, external designers, contractors, suppliers, and field stakeholders.
  • Know standards and codes applicable to transmission line design and be able to research and apply past code requirements to existing facilities, including Alberta power system facilities, Alberta Utility Code (AUC/AEUC), and Canadian Standards Association requirements.
  • Have working knowledge of transmission line materials, structure families, insulator and hardware selection, conductor and optical ground wire applications, foundations, steel poles, wood poles, and constructability considerations.
  • Have base knowledge of geotechnical investigation programs and data used for transmission line design, including borehole and cone penetration test information, soil classifications, soil strength and deformation behavior, groundwater, bedrock, frost depth, corrosivity, and backfill suitability.
  • Have base knowledge of transmission line foundation design and foundation reaction types, including compression, uplift, shear, overturning moment, lateral soil bearing, embedment depth, pile length and diameter considerations, and pole and foundation deflection impacts.
  • Be able to interpret geotechnical reports sufficiently to coordinate with geotechnical and civil/foundation specialists, identify design or constructability risks, and incorporate appropriate assumptions into line design packages.
  • Have experience using PLS-CADD and PLS-POLE.
  • Have strong organizational and time-management skills to manage multiple projects and issues simultaneously.
  • Have strong interpersonal and communication skills to work with office and field staff in a team environment.
  • Be able to work under tight timelines and in high-stress situations.
  • Have mentoring, coaching, or technical leadership experience with junior engineers, EITs, designers, or cross-functional project teams.
  • Hold a valid Class 5 driver's license.
  • Be able and willing to travel to sites as required.
  • Have effective communication and interpersonal skills to interface with team members and customers and promote positive customer outcomes.
  • Have a proven track record of good performance and attendance.
Responsibilities
  • Prepare detailed calculations, studies, bills of material, and design packages for transmission line capital, customer, Direct Assign, and system projects.
  • Prepare PLS-CADD models for design package development and existing line clearance evaluations.
  • Complete line design packages for AltaLink transmission voltage classes of 69 kV, 138 kV, 240 kV, and 500 kV, including rebuilds, modifications, greenfield lines, customer interconnections, and emergency restoration work.
  • Lead preliminary line design, route and structure option development, constructability review, material selection, and design change resolution for complex transmission projects.
  • Apply base geotechnical knowledge when developing line designs, including interpreting soil classifications, borehole and geotechnical investigation outputs, groundwater and bedrock considerations, soil strength and deformation behavior, frost depth, corrosivity data, and backfill requirements as they relate to transmission line foundation selection and constructability.
  • Support transmission line foundation design decisions for direct-embed poles, drilled shafts or caissons, screw, helical, or bucket piles, driven piles, micropiles, grillage, and pad or footing applications, including review of compression, uplift, shear, and moment reactions.
  • Coordinate with geotechnical consultants, civil and foundation designers, project managers, construction resources, and pile and foundation contractors to define geotechnical scope, review investigation results, and resolve foundation design or installation risks.
  • Consider foundation risk mitigation during design and construction support, including cave-in or sloughing risk, high groundwater, shallow bedrock, gravel or boulder interference, casing or culvert needs, washed gravel and backfill selection, and effects on schedule, cost, safety, and reliability.
  • Provide timely technical input to support the Project Development and Execution teams.
  • Develop scope descriptions for project estimating and provide implementation direction to internal designers, external engineering consultants, EPC contractors, construction resources, and field crews.
  • Review or approve technical drawings and specifications submitted by internal designers or contractors to ensure projects meet standards for operability, functionality, maintainability, reliability, durability, and safety.
  • Support construction execution and project close-out by resolving field questions, material issues, redline updates, design clarifications, and as-built and return-data requirements.
  • Support engineering standards development, design practice improvements, and application of current or historical code requirements, including AEUC, CSA, and applicable ISO reliability requirements.
  • Provide subject-matter support for line optimization, line rating, thermal rating, reconductoring assessments, facility applications, information requests, and regulatory or hearing support as required.
  • Contribute to material governance, supplier engagement, technical specifications, procurement support, and emergency spare and material strategy for transmission line assets.
  • Build and maintain effective working relationships with suppliers, external technical engineering resources, construction resources, customers, and other stakeholders to support understanding, decision-making, and cooperation.
  • Report project engineering status to Project Managers and the Engineering Manager.
  • Mentor junior engineers, EITs, and designers through technical coaching, design reviews, knowledge sharing, and professional development support.
  • Provide team leadership support as required, including coordinating team deliverables, technical prioritization, and coverage for management or project leadership needs.
  • Maintain competency with current industry standards and regulatory groups such as AEUC, CSA, and ISO Rules.
  • Demonstrate behaviors and meet expectations outlined in the cultural pillars of one team, continuous improvement, customer focus, and personal accountability.
Desired Qualifications
  • Transmission line design experience is considered an asset.
  • Experience using PLS-Tower, PLS-CAISSON, line rating tools, thermal rating methods, reconductoring assessments, or line optimization studies would be an asset.
  • Experience supporting customer interconnection, Direct Assign, Facility Application, AESO information request, regulatory or hearing work, or technical justification work would be an asset.
  • Experience developing or applying engineering standards, technical specifications, material procurement requirements, or supplier technical evaluations would be an asset.
  • Experience with foundation-related standards, geotechnical scope development, foundation constructability reviews, or coordination of engineered foundation designs would be an asset.

About the company

AltaLink operates in Alberta's electricity transmission sector, moving power from plants to end users by maintaining and expanding the province's transmission network. It connects homes, farms, businesses, and industries to energy sources such as thermal, wind, and hydroelectric power, ensuring reliable power delivery across Alberta. The company differentiates itself through proactive project management, landowner consultation, strict safety protocols, and partnerships like PiikaniLink L.P. with the Piikani First Nation. Its goal is dependable electricity transmission while investing in community initiatives and projects that expand and modernize Alberta's grid.

Company Size

501-1,000

Company Stage

Debt Financing

Total Funding

$258M

Headquarters

Calgary, Canada

Founded

1911

Get referred to AltaLink

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • April 29, 2026 DLR funding and 113 kilometers of sensors raise usable transmission capacity.
  • July 20, 2026 $350 million notes and CIB financing strengthen liquidity for grid expansion.
  • May 4, 2026 rates stayed below 2018 levels, helping defend Alberta regulatory relationships.

What critics are saying

  • Wildfire-triggered PSPS outages threaten political backlash and customer trust during 2026 fire seasons.
  • August 11, 2026 PSPS use in Provost normalizes outages that interrupt farms, towns, and industry.
  • Catastrophic wildfire liability can become existential if AltaLink's lines ignite a major Alberta fire.

What makes AltaLink unique

  • AltaLink owns Alberta's regulated transmission backbone across renewable-rich and fossil-heavy load centers.
  • June 30, 2026 CETO completion links Red Deer and Stettler with 135 kilometers.
  • September 8, 2026 reorganization simplifies BHE AltaLink into one regulated utility platform.

Help us improve and share your feedback! Did you find this helpful?

Benefits

  • Health Insurance
  • Dental Insurance
  • Vision Insurance
  • Disability Insurance
  • Health Savings Account/Flexible Spending Account
  • Paid Vacation
  • Paid Holidays
  • Life Insurance
  • Spending Accounts
  • Wellness Program
  • Gym Membership
  • Tuition Reimbursement

Growth & Insights and Company News

6 month growth

1%

1 year growth

1%

2 year growth

1%
PTAG
Sep 21st, 2026
PTAG at CIGRE Energy Forum 2026: advancing grid modernization through capital delivery.

PTAG at CIGRE Energy Forum 2026: advancing grid modernization through capital delivery. Grid modernization is a capital delivery challenge before it is a technology challenge. PTAG will be at the CIGRE Energy Forum 2026 in Calgary, September 21 to 24 at the Calgary TELUS Convention Centre, hosted by AltaLink. This year's theme, "Grid Modernization: Enabling Large Loads, Advanced Storage, and Smart Technologies for a Secure and Resilient Energy Future," reflects the scale of transformation underway across the power and utilities sector. For owners, the challenge is not only selecting the right technologies. It is also delivering increasingly complex transmission, storage, and grid infrastructure programs with the planning, controls, governance, and coordination needed to keep execution aligned. PTAG works owner-side in Power & Utilities, helping organizations strengthen capital program delivery across project controls, construction management, engineering management, supply chain, PMIS, and performance management. Representing PTAG at the forum will be Philip Whelan, Ugo Santone, Trevor Posyluzny, Andrew Dubreuil, Garry Makar, and Sonia Brar. If you are carrying a transmission, storage, or broader grid modernization program, connect with the PTAG team in Calgary.

Yahoo Finance
Jul 20th, 2026
AltaLink, L.P. to Issue $350 Million in Senior Secured Notes

CALGARY, Alberta, July 20, 2026--AltaLink has agreed to issue $350 million aggregate principal amount of 30-year, 5.111% Series 2026-1 Senior Secured Notes.

CBC
May 25th, 2026
Alberta utilities expand planned wildfire power shutoffs in Bow Valley.

Alberta utilities expand planned wildfire power shutoffs in Bow Valley. Fortis and AltaLink say cutting power to towns a last resort in extreme wildfire conditions. Michelle McCann · CBC News · Posted: May 25, 2026 11:13 AM PDT | Last Updated: May 25 Estimated 5 minutes Social sharing. As wildfire seasons become longer and more destructive, Alberta electricity providers are introducing programs designed to intentionally shut off power in high-risk areas, like the Bow Valley, before wildfires start. The strategy, known as Public Safety Power Shutoffs (PSPS), involves intentionally shutting off electricity during extreme conditions to reduce the risk of power lines sparking wildfires. This month, electricity providers AltaLink and FortisAlberta presented the program to Canmore town council. "That was the first time I heard about it. And I think the very first words out of my mouth was, 'Wow, that sparks a lot of questions,'" said Canmore Mayor Sean Krausert. Utilities say the decision to proactively shut off power would depend on extreme weather conditions such as wind speed, humidity, vegetation dryness and wildfire danger ratings - all of which can increase the risk of power lines sparking a wildfire. "It is not a decision we take lightly," says AltaLink vice-president of operations Evan Mitchell. "We need to see conditions where, if a spark were to start, there is a risk it could produce a catastrophic wildfire." Mitchell says residents would receive advance notice of a planned outage, potentially days before if conditions allow. AltaLink and FortisAlberta say roughly 10 per cent of wildfires in the province are linked to utility infrastructure. "It highlights the risk present for us and why we're committed to doing everything we can to reduce that potential," Mitchell says. According to data presented by Fortis and AltaLink to Canmore council, roughly 674,000 hectares burned in Alberta in 2025, more than double the annual average between 2015 and 2022. "In 2020 and 2021, we started to see more wildfires throughout Alberta and western North America," FortisAlberta vice-president of operations Jon Zawada says. "The longer, drier fire season really caused utilities to pause and look at these measures." AltaLink first launched its PSPS program in Banff in 2019 before expanding it to Canmore in 2024. FortisAlberta introduced the program in the Bow Valley in 2025. Since starting its PSPS program, AltaLink just performed its first planned outage, on May 3 in the Municipal District of Provost. Mitchell says power was shut off for several hours before being restored. WATCH | Why wildfire seasons are getting stronger and longer: Why wildfire seasons are getting stronger and longer May 18, 2023| Duration 6:42 John Vaillant has spent years investigating wildfires and the reasons today's fires are more destructive. He uses photos and videos to show CBC's chief correspondent Adrienne Arsenault what's been happening. PSPS programs becoming more common across western North America. The approach has become more common across western North America as wildfire conditions worsen. In 2019, California utilities expanded proactive power shutoffs after the deadly 2018 Camp Fire, which was sparked by electrical infrastructure. But the strategy there faced backlash as outages began to be used frequently and for prolonged stretches of time, which affected large populations. That prompted utilities to refine the programs and invest in other wildfire mitigation measures. Zawada says Alberta utilities have watched how the programs have evolved in the United States. "There's a lot of sharing among utilities around best practices and technologies that have been successful or maybe not," he says. Zawada says utilities in Alberta are using those early experiences in the United States to help shape how the programs are rolled out locally. Krausert says he understands the program would likely rarely be used, but there are still concerns about how outages could affect the Bow Valley. "Obviously there's some big concerns as to how it will impact residents, businesses and visitors," he says. The Bow Valley's tourism-heavy economy could make planned outages particularly complicated during the busy summer season. "Canmore is definitely not a big city, but the Bow Valley is chock-a-block full of people during the summer," Krausert said. Utilities say planned outages would only be used as a last resort after other wildfire mitigation measures have been exhausted. Mitchell says the company continuously monitors weather conditions through its network of weather stations and clears dry vegetation around power lines to reduce the risk of sparks starting a wildfire. In a statement to CBC, Banff officials say the town remains in regular communication with utilities throughout the wildfire season, including daily discussions during periods of elevated risk. The utilities have agreed to speak with the town before a planned outage decision is made, the statement says, so impacts can be jointly assessed. The town of Banff says "we expect to be working closely with utility partners to ensure disruption is as brief as possible." PSPS expands beyond the Bow Valley. AltaLink expanded PSPS programs to all of its service areas in the province in 2024. And this year, FortisAlberta expanded the program to more communities, including Hinton, Nordegg and the Municipal District of Bighorn. ATCO Electric says it introduced a planned shutoff program in 2025 for a small area near Jasper, with plans to expand wildfire-related safety measures to other communities in the coming years. WATCH | How far along is the Jasper wildfire rebuild? How far along is the Jasper wildfire rebuild? March 19| Duration 3:02 A year and a half after a wildfire destroyed a third of the buildings in Jasper, Alta., officials are saying the rebuild is on the right on track. But with 374 properties destroyed, there are just as many personal stories. CBCs Maggie Kirk uncovered a couple of them, and found out how the town is "building back better." Canmore's director of emergency management Caitlin Miller says residents should prepare for possible extended outages during the wildfire season by signing up for emergency alerts and building emergency kits with enough food and water to last at least 72 hours. Miller says wildfire remains the top emergency risk Canmore faces. "The wildfire threat is trending to be higher this year just based on predicted forecasts and weather," Miller said. "How it actually shakes out remains to be seen, but we continue to prepare as much as we can for wildfire." Reporter/Editor Michelle McCann is a reporter with CBC Bow Valley. You can reach her at [email protected].

Indigenous Business & Finance Today
Apr 30th, 2026
AltaLink receives funding to support transmission line capacity project - Indigenous Business & Finance Today

Press Release CALGARY, ALBERTA (– April 29, 2026) – AltaLink has been selected to receive more than $1.8 million in funding from the Government of Alberta through the Emissions Reduction Alberta (ERA) Industrial Transformation Challenge for the Dynamic Line Rating (DLR) Project. This investment will offset a portion of the project cost, supporting affordable transmission for Albertans. The project aims to address transmission system capacity by using technology to calculate transmission […]

Medicine Hat News
Apr 21st, 2026
MHIP collaborates with annual golf tourney that promotes programming for kids.

MHIP collaborates with annual golf tourney that promotes programming for kids. By ANNA SMITH Local Journalism Initiative on April 21, 2026. The Medicine Hat Interpretive Program is participating in this year's Rogers Birdies for Kids, as presented by AltaLink, raising funds to keep Hatters in the great outdoors. Under the Calgary Shaw Charity Classic Foundation, the program is designed to promote the annual golf tournament, but also raise new funds for local charities. "As a participating charity in 2026, all funds that the Interpretive Program raises through this initiative will be generously matched up to 50 per cent thanks to Rogers Birdies for Kids, presented by AltaLink," said chief interpreter Alicia Voth. "We are able to raise funds through various means including public programming, targeted fundraisers and sales from our Nature Shop in Police Point Park." She says all money raised will go directly to hosting youth public programs throughout the year, which will cover a wide variety of nature, science, environmental and historical topics. Voth estimates these programs connect with roughly 7,000 people per year, with the exact number of programs available depending directly on fundraising, as MHIP is managed by local charity Society of Grasslands Naturalists as it has been since 1994. "Visitors will notice that some of our programs and fundraisers over the next few months will have a connection to Rogers Birdies for Kids presented by AltaLink," said Voth. "Funds raised through these initiatives will allow us to continue to provide exciting programming to the community over the next year." Those seeking to support the program can best lend a hand by attending programs and contributing to fundraisers connected to Birdies for Kids. From now until Aug. 15, proceeds raised in the Nature Shop in Police Point Park will also be matched up to 50 per cent through this initiative, so it's a great time to shop locally, says Voth. Anyone wishing to directly donate to MHIP's Birdies for Kids initiative can do so through the online portal at rogerscharityclassic.com/charities/society-of-grasslands-naturalists until Aug. 31. Donations for this initiative using cash, credit or debit will also be accepted at the Nature Centre in Police Point Park until Aug. 15, and general donations are always welcome and appreciated year-round.