N

NextEra Energy

Runs a Florida utility and builds wind and solar farms

Associate Solar & Battery Field Engineer - West Florida Region

Power Systems EngineeringUpdated on Nov 14
Full-timeImmokalee, FL, USANo salary listed

About the Job

Requirements

  • A Bachelor's degree in Engineering from an ABET-accredited engineering program is required.
  • At least 0 years of experience are required.
  • A valid non-commercial driver's license is required.
  • The role requires a strong bias for action and the ability to work independently and as part of a team.

Responsibilities

  • Operate and maintain large-scale utility solar and/or battery facilities in Florida.
  • Serve as site safety manager to ensure personnel and equipment onsite are safe and the site complies with environmental and regulatory permit requirements.
  • Perform routine engineering tasks and, with limited guidance, independently evaluate, select, and apply standard engineering techniques and procedures, using judgment to make adaptations and modifications.
  • Troubleshoot and repair all aspects of solar facilities in the field.
  • Perform preventative maintenance, corrective maintenance, and root cause analysis.
  • Be on call at times and be responsible for West Florida sites.
  • Coordinate with the Renewables Operation Control Center, original equipment manufacturers, vendors, and contractors as required.
  • Complete assignments with clear and specific objectives that require investigating a limited number of variables.
  • Perform work involving conventional plans, investigations, surveys, structures, or equipment with relatively few complex features and few precedents.
  • Perform other job-related duties as assigned.

Desired Qualifications

  • A Bachelor's degree in Electrical Engineering is highly preferred.

About the Company

NextEra Energy

Runs a Florida utility and builds wind and solar farms

NextEra Energy owns Florida Power & Light, the regulated utility that supplies electricity to much of Florida, and NextEra Energy Resources, which builds and runs wind, solar, battery storage and nuclear plants across the United States. The company calls itself the world's largest generator of renewable energy from the wind and sun. FPL earns returns set by Florida regulators on the power plants and grid lines it builds, while Energy Resources sells power to utilities, technology companies and other large buyers under long-term contracts. NextEra Energy was formed in 1984 as the holding company for Florida Power & Light, which dates to 1925, and is based in Juno Beach, Florida.

Company size
10,001+
Company stage
IPO
Headquarters
Juno Beach, FL
Founded
1984

Recently Posted Jobs

Explore more opportunities at NextEra Energy

See more jobs