G

GE Vernova

Builds equipment and software for electric power

Field Service Technician - Services and Commissioning

Full-Time
No salary listed
Senior
Bachelor's, Master's
Brisbane QLD, Australia
In PersonTravel may reach 90% in Australia or abroad, including extended commissioning periods and short-notice travel. Relocation assistance is provided.
Field ServiceEquipment Field Service

About the job

Requirements
  • An electrical engineering bachelor's or master's degree from an accredited university or college is required.
  • At least 5 years of field commissioning experience on power systems, energy storage, or similar electrical infrastructure projects is required.
  • Demonstrated leadership of field teams of at least three engineers or technicians on commissioning or construction sites is required.
  • A solid understanding of power electronics, electric power systems, medium voltage, battery chemistry fundamentals, and power conversion topologies is required.
  • Experience with battery management systems, power conversion systems, and energy management systems is required.
  • Knowledge of medium- and high-voltage transformers, protection relays, and switchgear commissioning and testing is required.
  • Familiarity with supervisory control and data acquisition systems and communications protocols including Modbus TCP/RTU, DNP3, and IEC 61850 is required.
  • Experience with programmable logic controllers and literacy in at least one computer programming language is required.
  • Hands-on experience with test instruments including recorders, power analysers, oscilloscopes, insulation resistance testers, high-potential testers, and battery impedance testers is required.
  • Willingness to travel domestically and internationally for extended commissioning periods and on short notice is required.
  • A good understanding of health and safety requirements and the risks and hazards involved in high-voltage and battery-storage environments is required.
Responsibilities
  • Lead pre-commissioning, commissioning, and energisation activities for battery energy storage systems, including power conversion system inverters, battery racks and modules, battery management systems, transformers, medium-voltage switchgear, and protection systems.
  • Supervise and coordinate field engineering teams and subcontractors to ensure commissioning milestones are met safely and on schedule.
  • Configure, verify, and troubleshoot supervisory control and data acquisition and communications systems, including Modbus TCP/RTU, DNP3, and Ethernet or fibre, during commissioning and grid connection.
  • Direct battery string testing, thermal management system verification, and state-of-health and state-of-charge acceptance testing.
  • Serve as the primary technical point of contact on-site for customers, project managers, and grid operators during commissioning phases.
  • Review and approve commissioning procedures, method statements, and test plans before execution.
  • Interpret operational data, alarm logs, and fault diagnostics on-site and lead resolution of commissioning issues.
  • Provide management with complete and prompt reports on commissioning progress, safety, risks, and technical issues.
  • Mentor and develop junior field engineers through on-site guidance, training, and knowledge transfer.
  • Lead root cause analysis and generate technical reports for equipment malfunctions or commissioning failures.
  • Ensure commissioning records, punch lists, test certificates, and as-built markups are completed to project standards.
  • Provide hands-on commissioning support, including parts replacement, testing, and verification of transformers, inverters, and protection equipment.
  • Champion company health and safety policies on-site, conduct toolbox talks, and ensure safe work practices across commissioning activities.
  • Interface clearly and professionally with senior management and client leadership.
Desired Qualifications
  • Fluent oral and written English communication skills.
  • A strong leadership presence with the ability to motivate teams and hold them accountable.
  • The ability to manage multiple work fronts and prioritise under pressure.
  • The ability to coordinate tasks across disciplines and contractors.
  • High work ethics and commitment to quality.
  • Proven analytical and quality-improvement ability.
  • The ability to interface at all organizational levels, internally and externally.
  • Comfort sailing on marine vessels and remaining offshore for a defined number of days.
  • Availability to monitor, read, and respond to contacts outside normal working hours across different time zones.

About the company

GE Vernova makes equipment and software that generate and manage electricity for utilities, power producers, and industrial customers. Its Power, Wind, and Electrification businesses span gas turbines, wind generation, and the systems that move electricity across grids. The company supplies generators, grid equipment, and controls, while its software coordinates network operations and integrates changing sources of power. Customers buy equipment and enter service agreements for maintenance, upgrades, and technical support over its operating life, alongside purchases of software and related services. GE Vernova became an independent company in 2024 after separating from GE and is headquartered in Cambridge, Massachusetts.

Company Size

10,001+

Company Stage

N/A

Total Funding

$17.6M

Headquarters

Cambridge, Massachusetts

Founded

2024

Get referred to GE Vernova

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • Demand supports expansion: July 2026 results show GE Vernova booked $24.2 billion of quarterly orders, up 88% organically.
  • Service commitments support recurring work: GE Vernova says services account for more than 55% of its backlog.
  • Graduates build depth through rotations: GE Vernova runs two-year Next Gen development programs in engineering, technology, and operations.

What critics are saying

  • Wind remains a drag: July 2026 results show GE Vernova lost $275 million in quarterly Wind segment EBITDA.
  • Project margins absorb overruns: GE Vernova locks prices before completion and discloses meaningful expenses from excess costs and penalties.
  • Field assignments demand long weeks: GE Vernova's listed transformer specialist works typical 12-hour site days, up to six weekly.

What makes GE Vernova unique

  • Its technology underpins global power: GE Vernova says customers generate approximately one-quarter of world electricity using its equipment.
  • Gas turbine scale anchors expertise: GE Vernova reports the largest installed fleet by generating capacity, across approximately 7,000 turbines.
  • Nuclear work reaches beyond equipment: GE Vernova Hitachi supplies advanced reactors, fuel, and services for operating plants.

Help us improve and share your feedback! Did you find this helpful?

Benefits

  • Health Insurance
  • Dental Insurance
  • Vision Insurance
  • Life Insurance
  • Disability Insurance
  • 401(k) Retirement Plan
  • 401(k) Company Match
  • Paid Vacation
  • Paid Parental Leave
  • Mental Health Support
  • Relocation Assistance
  • Performance Bonus

Company News

Yahoo Finance
Oct 22nd, 2026
GE Vernova Q3 preview: $176B backlog and 145% expected EPS growth ahead of October 28 report

GE Vernova will report third-quarter 2026 results on October 28. Analysts expect earnings of $4.03 per share, up more than 145% from a year earlier. In the second quarter, equipment orders more than doubled and service orders rose 15%. Total backlog climbed to $176 billion. For the third quarter, the company expects Power segment revenue growth of 17%–19% and an EBITDA margin of about 17%–18%, up from 13.3% a year earlier. Electrification revenue is forecast at $3.8 billion–$4.0 billion. The stock is about 26% below its 52-week high, which has eased valuation concerns. Most analysts rate it a "Strong Buy.

Yahoo Finance
Oct 22nd, 2026
GE Vernova up 600% since spin-off, with a $176B backlog: is the dip a buying chance?

GE Vernova's shares have risen nearly 600% since the company was spun off from GE Aerospace in 2024, driven by demand for electricity from artificial intelligence data centres. The stock has been in a lull since April. In the second quarter, its power division's revenue grew 14% to $5.5 billion, while new orders rose 134% to $16.7 billion, mostly for natural gas turbines. Its electrification arm's revenue climbed 68% to $3.6 billion, with orders up 93% to more than $6.3 billion. Total backlog stands at $176 billion, more than three times next year's expected revenue of $53 billion. Manufacturing capacity is the main bottleneck. About 80% of customers are traditional, and 20% are data centres. Most analysts rate the stock a strong buy, with a consensus price target of $1,199.47.

Yahoo Finance
Oct 22nd, 2026
GE Vernova stock down 10.1% as gas turbine prices and $12.5B cash guide face six-month test

GE Vernova stock has fallen 10.1% since April 21, 2026, while the S&P 500 gained 9.8%. Investors appear to be betting that customers will keep paying rising prices for its gas turbines, with cash up front. Management expects at least 125 gigawatts of equipment under contract by the end of 2026. The company's third-quarter results, due around October 28, will show whether turbine prices keep climbing. In July, management said first-half equipment orders were priced more than 20% above fourth-quarter 2025 orders. Full-year free cash flow is due around January 26, 2027. Management raised its 2026 guide to $11.5 billion to $12.5 billion, from $6.5 billion to $7.5 billion. Wind revenue is expected to fall at a low double-digit rate in the third quarter.

Yahoo Finance
Oct 21st, 2026
GE Vernova shares rise 3.5% to $921 as Nvidia tie-up links grid planning to AI; backlog hits $176B

GE Vernova is working with Nvidia on infrastructure and digital-twin tools that link grid planning to the needs of AI factories. The company's shares rose 3.46% to $921.12 at 11:04 EDT on Wednesday. AI facilities need electricity, and GE Vernova supplies equipment that helps deliver it. The collaboration adds a digital planning layer to that opportunity. Through the second quarter, the company reported more than $5 billion in data-center orders, over twice its full-year 2025 total. Quarterly orders hit $24.2 billion, and backlog reached $176 billion, up $13 billion from the previous quarter. Revenue rose 22% to $11.1 billion. Adjusted EBITDA margin reached 11.3%. The next test is execution: turning backlog into revenue and reaching a projected 2026 adjusted EBITDA margin of 12% to 14%.

Yahoo Finance
Oct 16th, 2026
GE Vernova wins five Venture Global grid reservations; $3,400 model target implies 267% upside

GE Vernova has reserved five grid equipment packages for Venture Global, under an agreement signed October 9. GE Grid Solutions will supply transformers and gas-insulated switchgear for up to 21 power island projects, with purchase orders starting in late 2026. Venture Global also reserved eight power islands with GE Vernova, and expects to order its first by the end of 2026. Beyond reservation fees, neither deal binds the buyer; the roughly $17.2 billion total assumes every order proceeds. GE Vernova shares closed at $926.44 on October 15, 21.14% below their June record but up about 42% in 2026. The company's Electrification backlog has grown to $45 billion from $6 billion at the end of 2021. Third-quarter results are due October 28.