K

Knauf Insulation

Global manufacturer of energy-efficient insulation

Process Engineering Manager

Full-TimeDeadline 7/16/27
No salary listed
Mid, Senior
Bachelor's
McGregor, TX, USA
In PersonRequired to work onsite; travel is approximately 10% as needed.
Manufacturing & Process EngineeringManufacturing Engineering, Process Engineering

About the job

Requirements
  • A bachelor's degree in Mechanical, Industrial, Chemical or Manufacturing Engineering, or a related field.
  • A minimum of five years of experience as a Process Engineer in an industrial manufacturing environment involving product trials, customer complaints and product testing.
  • A minimum of three years of experience leading, supervising or managing high-performing teams in a similar environment.
  • Ability to lead and train others in a fast-paced environment.
  • Ability to establish key performance indicators and hold direct reports accountable for consistently achieving goals.
  • Ability to motivate and energise a team to deliver strong solutions.
  • Ability to make quick, thorough decisions that positively impact the organisation.
  • Ability to identify problems and process improvement opportunities and develop creative solutions.
  • Ability to communicate effectively with groups of customers and employees at all levels of the organisation.
  • Ability to manage multiple priorities with limited supervision in a fast-paced environment.
  • Ability to travel approximately 10% of the time as needed.
  • Knowledge of machinery and its design and use.
  • Knowledge of statistical analysis software.
  • Knowledge of production processes.
  • Strong troubleshooting skills.
  • Strong problem-solving skills.
  • Strong critical thinking skills.
  • Strong organisational skills.
  • Strong negotiation skills.
  • Strong project management skills.
  • Strong leadership and people management skills.
  • Proficient computer skills in an MS Windows environment, including Microsoft Word, PowerPoint and Excel.
Responsibilities
  • Work closely with Plant Management and functional teams to identify process bottlenecks, conduct root cause analysis and implement process improvements across the business.
  • Maintain process operations by initiating, coordinating and enforcing project, operational and personnel policies and procedures.
  • Initiate and lead projects that improve end-to-end processes, including the setup, validation and auditing of measurement systems to deliver measurable business impact.
  • Resolve quality issues by identifying problems, evaluating solutions, implementing action plans and providing the necessary resources.
  • Lead the Engineering Team at the plant.
  • Communicate key initiatives to the Manager, Plant Operations.
  • Drive productivity and process improvement projects aligned with business initiatives.
  • Conduct quality awareness and Sigma Belt training across the organisation.
  • Coach project teams to fulfil certification requirements and achieve quality and process improvement objectives.
  • Maintain professional and technical knowledge by attending educational workshops, reviewing professional publications, establishing professional networks and benchmarking leading practices.
  • Drive high levels of employee retention and engagement to support a sustainable workforce.
  • Foster a culture of innovation, collaboration and accountability within the organisation.
  • Create an inclusive environment in which all employees feel able to contribute and make a positive impact on the company.
Desired Qualifications
  • Lean Six Sigma training or certification is preferred.
  • Knowledge of fibreglass manufacturing processes is preferred.
  • Knowledge of lean processes is preferred.
  • Knowledge of SAP is preferred.

About the company

Knauf Insulation manufactures and distributes insulation materials for buildings, serving construction firms, architects, and building owners in more than 40 countries. Its products include glass mineral wool, rock mineral wool, and wood wool, which provide thermal and acoustic insulation and help improve energy efficiency in construction projects. The company’s operation combines manufacturing with distribution, focusing on meeting environmental standards and certifications such as BREEAM, LEED, and WELL. Its differentiators include a long track record (over 40 years), a global reach, and a commitment to sustainability and standards-driven solutions. The goal is to be a dependable partner in the insulation industry while continuously advancing concepts and solutions for energy efficiency and responsible building practices.

Company Size

1,001-5,000

Company Stage

N/A

Total Funding

N/A

Headquarters

Visé, Belgium

Founded

2005

Get referred to Knauf Insulation

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • June 2026 carbon calculator supports LEED, BREEAM, and Net Zero Carbon Buildings Standard sales.
  • The £180 million Shotton plant promises 137 direct jobs and 100,000-ton annual output.
  • North Wales Growth Deal approved £14.4 million, reducing financing friction for Deeside expansion.

What critics are saying

  • Flintshire planning still needs final construction approval; 2028 start slips hurt growth.
  • Matt Parrish exits Knauf Insulation North America in June 2026, risking execution drift.
  • Johns Manville's 2024 patent victory shows Knauf can lose costly intellectual-property fights.

What makes Knauf Insulation unique

  • June 2026 carbon calculator ties U-values and embodied carbon to EPDs.
  • Knauf's 2024 Uzbekistan acquisition adds low-CO2 rock mineral wool capacity.
  • The UK-first formaldehyde-free fiberglass portfolio strengthens brand trust and specifier pull.

Help us improve and share your feedback! Did you find this helpful?

Benefits

Health Insurance

Dental Insurance

Vision Insurance

Fertility Treatment Support

Family Planning Benefits

Adoption Assistance

401(k) Company Match

Disability Insurance

Paid Parental Leave

Paid Family Leave

Life Insurance

Paid Holidays

Paid Vacation

Tuition Reimbursement

Employee Assistance Program

Unlimited Paid Time Off

Flexible Work Hours

Company News

Mark Allen Group
Jun 11th, 2026
Knauf Insulation launches carbon calculator.

Knauf Insulation launches carbon calculator. 11 June 2026 Knauf Insulation has launched a free, online embodied carbon calculator. In a single place, users can calculate the U-value of their chosen insulation - to reduce operational carbon - and the embodied carbon of the specified product. Diana Dzhambazova, regional sustainability manager at Knauf Insulation, said: "Regulation of embodied carbon is inevitable, but many specifiers are already being asked to calculate whole life carbon to meet client requirements, local authority expectations and emerging standards such as the UK Net Zero Carbon Buildings Standard. This calculator makes that process faster and simpler." Users can use the U-value calculator to determine the insulation required to meet target U-values on a project and generate an embodied carbon calculation for their chosen insulation. The tool can also be used as a standalone calculator. The calculator provides embodied carbon results by weight, area and total project size. Knauf Insulation's product range is assessed using the latest EN15804+A2 standard for EPDs, and the calculator links directly to the relevant EPDs to make it easier for users to verify and cross-reference the source data. Diana added: "Sustainability reporting must be rigorous, but it doesn't have to be complicated or time consuming. We're the first insulation manufacturer in the UK to launch a tool like this - our goal is to continue helping specifiers deliver more sustainable buildings."

Place North West
Apr 30th, 2026
Plans in for £180m knauf Insulation factory.

Plans in for £180m knauf Insulation factory. 30 April 2026 16:43 Julia Hatmaker Comments (0) The rock mineral wool manufacturer has firmed up its vision for a 200,000 sq ft production facility at Deeside Industrial Park, a project supported by the £1bn North Wales Growth Deal. Knauf Insulation's move to Flintshire would bring more than 137 direct jobs to work in its 22,500 sq ft office building, 50,100 sq ft melter, 93,800 sq ft processing plant, and the 63,300 sq ft of existing buildings being kept on the site. The buildings are all designed by AEW Architects, with the five-storey Melter being the tallest on the 44-acre campus. The project is estimated to cost £180m to deliver, with more than £14m coming from the North Wales Growth Deal. Landscape proposals across the site include meadows, grassland, and more trees being planted. The office block would have a green roof. As part of the designs, there would be 126 car parking spaces, including six accessible ones and 14 with EV charging points. There would also be at least 12 covered cycle storage bays. The project team includes project manager Core, planner WSP, landscape architect Tyler Grange, civil engineer Tier Consult, geotechnical engineer Tier Environmental, highways consultant Eddisons, fire engineer Hoare Lea, and LEED assessor Hilson Moran. Hannan Associates provided advice on M&E, utiltiies, and acoustics. To view the application, search FUL/000343/26 on Flintshire County Council's planning portal.