L

Leeward Renewable Energy

Independent operator of wind, solar, storage

Protection & Controls Engineer

Full-TimeUpdated
No salary listed
Mid, Senior
Bachelor's, Master's
Houston, TX, USA+2 moreMore locations: Dallas, TX, USA | Phoenix, AZ, USA
HybridIn-office role: at least three days per week onsite, with up to two remote days subject to manager and policy approval.
Electrical EngineeringPower Systems Engineering
No H1B Sponsorship

About the job

Requirements
  • Four-year Bachelor's degree in Electrical Engineering.
  • Four to six years of experience in protection and control engineering; experience in a NERC-regulated environment is preferred.
  • Experience with protection system coordination studies and relay-settings validation.
  • Ability to perform fault and short-circuit analyses.
  • Ability to manage multiple projects and meet regulatory deadlines.
  • Familiarity with high-voltage substations from 69 kV through 525 kV, including equipment and relay panels.
  • Practical knowledge of Protection and Control, SEL relays and settings, and Protection and Control design.
  • Ability to read and interpret electrical drawings and extract information for NERC PRC reports.
  • Ability to complete tasks and meet deadlines with minimal supervision.
  • Ability to manage technical projects, including interaction with outside vendors.
  • Ability to manage priorities in a complex and dynamic environment.
  • Current authorization to work for any employer in the United States full-time without requiring an employment visa now or in the future.
Responsibilities
  • Develop and maintain NERC PRC deliverables for regulatory compliance.
  • Perform protection system coordination studies and validate relay settings.
  • Design and review protection schemes for transmission, distribution, and generation assets.
  • Conduct fault studies and short-circuit analyses.
  • Monitor compliance with NERC PRC standards and prepare audit-ready documentation.
  • Investigate protection system misoperations and implement corrective actions under PRC-004.
  • Coordinate with internal teams and external utilities on inter-entity studies.
  • Prepare technical reports and evidence packages for NERC audits.
  • Maintain accurate records of relay settings, coordination studies, and misoperation analyses.
  • Participate in continuous improvement efforts to optimize protective coordination, reduce downtime, and enhance system operation.
  • Create detailed reports for internal and regulatory review that highlight the performance and effectiveness of protection systems.
  • Lead, design, schedule, and address critical issues related to the operating fleet while meeting company reliability-improvement guidelines.
Desired Qualifications
  • Professional Engineer (PE) license; it is preferred but not required.
  • Strong knowledge of NERC PRC standards.
  • Master's degree in Engineering.
  • Experience performing NERC PRC studies and a good understanding of NERC PRC studies.

About the company

L

Leeward Renewable Energy

View

Leeward Renewable Energy develops and operates utility-scale wind, solar, and energy storage projects across the United States, owning a portfolio of 30 sites with a total capacity of 4 GW. It manages the full project lifecycle—from development and construction to long-term ownership and operation—selling power under long-term PPAs to utilities, corporations, and other offtakers. Its approach relies on long-term ownership and strong community partnerships, providing stable, durable energy as it maintains assets over time. The company aims to grow its wind, solar, and storage portfolio and deliver dependable clean energy through long-term agreements that support communities and customers.

Company Size

201-500

Company Stage

Debt Financing

Total Funding

$1.6B

Headquarters

Dallas, Texas

Founded

2015

Get referred to Leeward Renewable Energy

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • Leeward finished 525 MW in Oklahoma in July 2026, converting backlog into revenue.
  • Fitch affirmed BB- in July 2026, signaling stable access to project debt.
  • Harvey Solar’s 350 MW acquisition expands Ohio optionality and deepens LRE’s national pipeline.

What critics are saying

  • Illinois Bureau wind was delayed in June 2026, showing federal permitting can freeze LRE projects.
  • Harvey Solar stays pre-construction until 2028, exposing Ohio returns to permitting and interconnection slippage.
  • If Google redirects future Oklahoma PPAs, LRE loses its clearest financing engine and growth narrative.

What makes Leeward Renewable Energy unique

  • Google-backed Oklahoma portfolio proves LRE can finance and execute 725 MW at scale.
  • Sierra Pinta’s 112.5 MW Arizona BESS gives LRE credible storage depth beyond pure solar.
  • Leeward’s 31-project, 3,952 MW contracted fleet supports long-duration cash flow and lender confidence.

Help us improve and share your feedback! Did you find this helpful?

Benefits

  • Professional Development Budget
  • Conference Attendance Budget
  • Flexible Work Hours

Growth & Insights and Company News

6 month growth

7%

1 year growth

8%

2 year growth

8%
Business Wire
Mar 25th, 2026
LRE Acquires Harvey Solar, Expanding Energy Infrastructure and Community Investment in Licking County, Ohio

LRE (Leeward Renewable Energy) announced the acquisition of the Harvey Solar Project, a planned 350 megawatt (MW) solar facility located in Licking County, O...

Pryor Learning Solutions
Jan 17th, 2025
LRE Launches Renewable Energy Projects to Power Google's Oklahoma Data Center and Enhance State's Energy Infrastructure

The construction phase alone is expected to create more than 300 jobs, emphasizing local hiring and the use of domestically manufactured equipment, demonstrating LRE's dedication to responsible development and economic growth in Oklahoma.

SolarQuarter
Jan 16th, 2025
LRE Secures Over 700 MW of Renewable Energy Projects in Oklahoma with Google Partnership

Leeward Renewable Energy (LRE), a prominent American renewable energy company, has announced a major milestone with the launch of over 700 megawatts (MW) of renewable energy projects in Oklahoma, supported by long-term power purchase agreements (PPAs) with Google.

SolarTex
Dec 19th, 2024
200-MW solar project now producing power for Microsoft

LRE acquired the Morrow Lake Solar Project in 2023 from Red River, a joint venture of SunChase and Eolian, which initiated the development of the Morrow Lake Solar Project in 2017.

Business Wire
Jul 16th, 2024
Leeward Renewable Energy Secures $1.25 Billion in Warehouse Facility Financing to Accelerate Construction of Renewable Energy Projects

Leeward Renewable Energy (LRE), a leading renewable energy company, today announced the closing of its $1.25 billion construction warehouse facility (