P

Primero

Global EPC delivers turnkey mineral projects

Process Engineer

Full-TimeUpdated on 10/23/2026
No salary listed
Mid, Senior
Bachelor's
Salt Lake City, UT, USA
HybridHybrid schedule is possible.
Manufacturing & Process EngineeringProcess Engineering

About the job

Requirements
  • A degree in Process Engineering, Chemical Engineering, or Metallurgical Engineering is required.
  • A Professional Engineer (P.E.) licence is required; a Utah licence is preferred, and a licence from any U.S. state will be considered.
  • Four to eight years of experience in engineering, operations, and/or commissioning work is required.
  • Experience in mineral processing, metal refining, or related industries is required.
  • A high level of analytical ability to solve complex problems is required.
  • Strong analytical skills and attention to detail are required.
  • The candidate must be able to collaborate effectively with internal teams.
  • A solid understanding of health, safety, and environmental principles and applicable codes is required.
  • The candidate must be flexible and resourceful in managing workload fluctuations.
  • Proficiency in reading specifications, schematics, and engineering drawings is required.
  • The candidate must be committed to delivering quality work on schedule and providing support as needed.
  • Applicants must have legal authorization to work in the United States.
Responsibilities
  • Develop process flow diagrams, piping and instrumentation diagrams, design criteria, and technical specifications.
  • Support equipment selection and process planning.
  • Provide strategic guidance to engineering teams and ensure alignment with project objectives.
  • Propose metallurgical solutions and plan process modifications.
  • Participate in test work management, client requirement analysis, and plant performance follow-up.
  • Contribute to internal policy reviews and ensure timely delivery of high-quality deliverables.
  • Perform process engineering calculations and mass balances, establish design criteria, and develop flowsheets and piping and instrumentation diagrams.
  • Support process design and other client deliverables by applying knowledge of work methods and techniques for designing processing facilities, producing study outputs, and coordinating with other disciplines.
  • Help develop and implement Primero Americas' metallurgical functions.
Desired Qualifications
  • A Utah Professional Engineer licence is preferred.

About the company

Primero is a multinational EPC contractor that delivers turnkey projects in mineral processing, energy, iron ore, and non-process infrastructure. It operates with a vertically integrated model, handling test work, design, engineering, procurement, construction, and ongoing maintenance in-house. Primero earns revenue from engineering, procurement, construction, and maintenance contracts to enable end-to-end project delivery, backed by NRW Holdings. It also runs apprenticeship programs to develop skilled workers and aims to provide reliable, integrated project delivery for global resource projects.

Company Size

501-1,000

Company Stage

Seed

Total Funding

$800K

Headquarters

Osborne, Australia

Founded

2011

Get referred to Primero

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • Ramelius tapped Primero for Mount Magnet expansion on September 14, 2026.
  • NRW's FY26 revenue rose 31.4% to A$4.3 billion, with Primero contributing.
  • Primero opened a new Perth St Georges Terrace head office in June 2026.

What critics are saying

  • Hope Downs 1 must finish by December 2026; delays hit Rio Tinto cash flow.
  • KCGM Growth was due by Q3 2026, compressing commissioning and handover risk.
  • A major KCGM or Hope Downs failure would shut Primero out of Tier-1 miners.

What makes Primero unique

  • Primero delivered Rio Tinto Hope Downs 1 NPI works and Northern Star KCGM megaprojects in 2026.
  • NRW’s FY26 results said Primero drove MET growth through major project execution.
  • Primero recruits North America process engineers, extending minerals-processing capability beyond Australia.

Help us improve and share your feedback! Did you find this helpful?

Benefits

  • Health Insurance
  • Paid Sick Leave
  • Hybrid Work Options
  • Paid Parental Leave
  • Benefits & Discounts
  • Employee Referral Rewards
  • Flexible Work Hours

Growth & Insights and Company News

6 month growth

0%

1 year growth

1%

2 year growth

2%
Colitco
Aug 28th, 2025
Caravel Minerals Appoints Primero as EPCM for Caravel Copper Project

Caravel Minerals Limited has selected the EPCM contractor, the 'Primero Group Limited', for the Caravel Copper Project in Western Australia where the project is set to operate.

Mining Monthly
Aug 14th, 2023
Australian-made vanadium electrolyte on the cards

NRW Holdings-subsidiary Primero Group has started building Australian Vanadium's vanadium electrolyte manufacturing facility in the northern Perth suburb of Wangara, as part of a recently awarded engineering, procurement and construction contract.

Australian Manufacturing
Aug 14th, 2023
Construction underway for vanadium electrolyte manufacturing facility in WA

Australian Vanadium Limited has signed an engineering, procurement and construction (EPC) contract for engineering group Primero Group to undertake the construction of the firm's vanadium electrolyte facility in Western Australia.

The West Australian
Jul 3rd, 2023
Primero Group wins $973m contract for massive KCGM Fimiston mill expansion | The West Australian

Northern Star Resources has awarded a $973 million engineering, procurement and construction contract to Primero Group for its $1.5 billion KCGM Fimiston mill expansion.

International Mining
Jul 3rd, 2023
NRW's Primero Group awarded major EPC contract for KCGM Growth Project

NRW Holdings says its wholly owned subsidiary Primero Group Limited has entered into an EPC contract with Northern Star Resources Limited for its KCGM Growth Project in Kalgoorlie, Western Australia.