K

Kinder Morgan

Energy transportation via pipelines and terminals

Corrosion Manager

Full-TimeDeadline 9/24/27
$128k - $192k/yr+ Discretionary annual incentive plan
Expert
Bachelor's
Mission Valley, San Diego, CA, USA+4 moreMore locations: Colton, CA, USA | Carson, CA, USA | Phoenix, AZ, USA | Tucson, AZ, USA
In PersonOnsite office location may be in Colton, Carson, Mission Valley, Phoenix, or Tucson.
Mechanical Engineering

About the job

Requirements
  • At least 10 years of corrosion-related experience, including at least five years in responsible charge of the design, construction, monitoring, and troubleshooting of complex corrosion control systems.
  • A bachelor's degree or higher in Engineering, Science, or a related field from an accredited school, or relevant work experience that has developed equivalent engineering skills.
  • A satisfactory driving record as determined by the Company and a valid state driver's license.
  • Compliance with license, certification, or training requirements stipulated by current or future local, state, or federal agencies or the Company, when applicable.
  • A minimum of 7 to 10 years of experience in some combination of engineering, project management, quality control, Department of Transportation pipeline safety, or risk management.
  • Familiarity with pipeline operations, project management, risk management concepts, engineering principles, and Department of Transportation Part 195 regulations.
  • Understanding of basic statistics and cost/benefit analysis.
  • In-depth working knowledge of pipeline operations, project management, risk management concepts, engineering principles, and Department of Transportation Part 195 regulations.
  • Knowledge of the design, construction, and troubleshooting of corrosion monitoring and cathodic protection systems.
  • Knowledge of practices, procedures, tools, materials, and equipment used in cathodic protection of refined oil pipelines.
  • Knowledge of corrosion instrumentation.
  • Knowledge of occupational hazards and required safety precautions related to assigned duties.
  • Knowledge of pipeline operations and locations.
  • Knowledge of utility operations and right-of-way.
  • Knowledge of protective coatings used on petroleum pipelines.
Responsibilities
  • Administer the regional corrosion control program and manage related design, installation, operation, and maintenance activities for corrosion control facilities to promote efficiency and safety and ensure compliance with state and federal pipeline safety regulations.
  • Supervise the regional corrosion control program to achieve goals within budget and available personnel.
  • Plan projects, review progress, and direct changes in priorities and schedules to ensure efficient and timely completion.
  • Supervise corrosion supervisors and technicians; participate in staff selection and promotion, salary change considerations, and disciplinary matters.
  • Conduct performance evaluations, resolve grievances, and provide training and motivation to support employee capabilities and changing system demands.
  • Orient new employees to procedures, policies, and equipment locations and operation, or assign orientation to the corrosion supervisor.
  • Coordinate annual refresher, safety, and emergency response training for corrosion personnel.
  • Develop and administer capital and maintenance budgets based on staffing and resource requirements, cost estimates, objectives, and goals.
  • Monitor, document, and report expenditures to ensure compliance with approved budgets and staffing levels.
  • Design corrosion monitoring and cathodic protection systems, including drawings, specifications, and calculations.
  • Coordinate work with departments responsible for contracts, environmental compliance, and right-of-way procurement.
  • Prepare contract drawings, specifications, and bid invitations for work performed by outside contractors.
  • Plan, coordinate, and direct jobs; prioritize corrosion control projects and installation of protective measures.
  • Consult the Director on major projects, budget proposals, and priorities.
  • Support Corporate and Engineering departments as required.
  • Establish and maintain professional relationships with local, regional, and national National Association of Corrosion Engineers organizations.
  • Delegate and review company notifications to agencies, companies, and committees regarding corrosion protection systems; participate in regulatory audits and present the regional corrosion program.
  • Maintain required records, assemble, compile, and review reports, review computer data, and generate reports.
  • Review as-built drawings and annual survey data, make corrections, and forward modified drawings to the drafting department for recording changes.
  • Analyze field test data from annual and interim surveys and determine corrective actions.
  • Investigate corrosion problems in the field through survey work or research, coordinating as needed with corrosion engineers, technicians, or vendors.
  • Resolve cathodic protection and interference problems and system adjustments; implement corrective action through corrosion and maintenance personnel or oversee outside contractors.
  • Coordinate and direct corrosion supervisors, technicians, and contracted services.
Desired Qualifications
  • NACE International Corrosion or Cathodic Protection Specialist certification, or a Registered Professional Corrosion Engineer license.

About the company

Kinder Morgan operates an energy infrastructure network that moves and stores natural gas, petroleum products, and CO2 across pipelines, terminals, and related facilities. Its four segments—Natural Gas Pipelines, Products Pipelines, Terminals, and CO2—earn revenue by charging fees for transporting and storing energy products. The pipelines move gas and liquids from producers to end users; terminals store and handle products; the CO2 segment supports enhanced oil recovery projects. Its goal is to reliably transport and store energy for customers while expanding into energy-transition projects like renewable natural gas and carbon capture, utilization, and sequestration.

Company Size

5,001-10,000

Company Stage

IPO

Headquarters

Houston, Texas

Founded

1997

Get referred to Kinder Morgan

See people who can refer or advise you

Simplify Jobs

Simplify's Take

What believers are saying

  • Q2 2026 EBITDA rose 12% to $2.2 billion, with EPS beating estimates.
  • FERC’s June 26, 2026 EIS advanced SSE4 and MSX toward 2028 service.
  • Southeast Connector open season closed October 7, 2026, opening another Southeast growth lane.

What critics are saying

  • Kinder Morgan still depends on FERC approvals for SSE4, MSX, and future expansions.
  • Utility yield competition and rising Treasury rates pressure KMI’s valuation and dividend appeal.
  • A prolonged federal permitting freeze would cripple Kinder Morgan’s expansion model.

What makes Kinder Morgan unique

  • Kinder Morgan’s 79,000-mile network and 139 terminals create unmatched Gulf-to-Rockies optionality.
  • In 2026, 92% of backlog is natural gas, anchored by FERC-regulated take-or-pay contracts.
  • Western Gateway’s 2026 joint venture with Phillips 66 and HF Sinclair deepens downstream reach.

Help us improve and share your feedback! Did you find this helpful?

Benefits

Hybrid Work Options

Company News

Yahoo Finance
Oct 14th, 2026
Delek, Kinder Morgan and World Kinect: three fuel stocks exposed to rising gas prices

Hotter US consumer price index data and a sharp jump in fuel costs have put inflation back in focus. A Simply Wall St screen names three fuel stocks exposed to higher gasoline and diesel prices. Delek US Holdings, a refiner valued at about $4.7 billion, earns roughly $11.9 billion from refining and $1.2 billion from logistics. Its enterprise optimisation program is expected to add $130–$170 million of annualised cash flow. Kinder Morgan, valued at about $73.7 billion, moves and stores fuel through its pipelines and terminals. Natural gas pipelines bring in about $11.7 billion of revenue, and about $10 billion in gas projects sit outside its sanctioned backlog. World Kinect, a fuel marketer valued at about $1.8 billion, reports $22.6 billion in aviation revenue, $10.4 billion from land and $8.7 billion from marine operations.

Seeking Alpha
Sep 30th, 2026
Kinder Morgan, Inc. (KMI) presents at Wolfe Research Utilities, Midstream & Clean Energy Conference 2026-New York transcript.

Kinder Morgan, Inc. (KMI) presents at Wolfe Research Utilities, Midstream & Clean Energy Conference 2026-New York transcript. 162.36K Followers Kinder Morgan, Inc. (KMI) Wolfe Research Utilities, Midstream & Clean Energy Conference 2026-New York September 30, 2026 10:20 AM EDT Company Participants David Michels - VP & CFO Conference Call Participants Keith Stanley - Wolfe Research, LLC Presentation Keith Stanley Wolfe Research, LLC Okay. Great. We're continuing our midstream fireside chat here. Very happy to have David Michels, CFO of Kinder Morgan, joining us. David, why don't you give some opening remarks on the company, please? David Michels VP & CFO Sure. First, thanks for having us here, Keith. Appreciate it. Good set of meetings so far. Looking forward to the rest of the day. So as we'll talk about more during this meeting, this is a pretty opportunity-rich environment for midstream companies, natural gas infrastructure development opportunities are as strong as we've seen in decades. So it's creating a lot of interesting opportunities for us for additional growth. Our base business remains very solid. We'll talk about the full utilization of networks across the space, which has led to the ability for us all to capture additional value when we see periods of time of disruptions, weather events. And then on top of that, these new opportunities to satisfy growth in the LNG space, growth in the power generation space is allowing us to add projects and grow additional - add additional EBITDA on top of our base business. So it's a great place to be right now, and it's very exciting. So we're pretty enthusiastic about the outlook for the company and looking forward to the conversation to get into that a little bit more. Question-and-Answer Session Keith Stanley Wolfe Research, LLC Great. So maybe we could start high level. I think about a year ago now, you put out a $10 billion shadow backlog. You talked to $3 billion plus per year of

Marcellus Drilling News
Sep 25th, 2026
Kinder Morgan unveils Southeast Connector pipe across Tennessee.

Kinder Morgan unveils Southeast Connector pipe across Tennessee. September 25, 2026 Kinder Morgan has a new pipeline project in the works, one MDN has not told you about before, because until yesterday nobody outside the company had heard of it. It's called the Southeast Connector, and it would run north to south across Middle Tennessee through 10 counties, stitching together two of Kinder's biggest interstate systems: Tennessee Gas Pipeline (TGP) and Southern Natural Gas (SNG). Kinder VP Allen Fore made the rounds in DeKalb County on Thursday, meeting the county mayor, the Chamber of Commerce, and local media. Land agents may start knocking on doors as early as next week. Target in-service: 2029.

Oil & Gas Leads
Sep 18th, 2026
Kinder Morgan advances $10.1B natural gas project backlog.

Kinder Morgan advances $10.1B natural gas project backlog. Kinder Morgan Expands U.S. Natural Gas Network as Power and LNG Demand Accelerate Kinder Morgan is expanding its U.S. natural gas infrastructure as growing liquefied natural gas (LNG) exports, gas-fired power generation and data-center development tighten pipeline and storage capacity. The company estimates U.S. gas demand could reach approximately 150 billion cubic feet per day (Bcf/d) by 2031 - about 27% above 2026 levels - and reports that utilization across its five largest gas pipelines already exceeds 90%. Its approved expansion backlog totals approximately $10.1 billion, with an average in-service date of first-quarter 2028. Major developments include the Trident Pipeline, Gulf Coast Express expansion, Amarillo Expansion, KinderHawk processing expansion and additional natural gas storage capacity. Kinder Morgan is also acquiring the Monument Pipeline System for approximately $500 million to strengthen its Texas intrastate network. Kinder Morgan U.S. Natural Gas projects. Kinder Morgan is developing additional infrastructure opportunities capable of serving more than 10 Bcf/d of power-generation demand and over 3 Bcf/d of LNG-related demand. This investment cycle creates opportunities for engineering, construction, compression, pipeline integrity, automation, measurement, electrical, storage and processing-equipment suppliers. Industry impact. Kinder Morgan's investments show how U.S. natural gas infrastructure is becoming central to LNG exports, grid reliability and data-center growth. The United States' position as a secure and scalable energy supplier - or "Safe Barrel" and increasingly a safe source of natural gas - supports long-term domestic infrastructure investment while giving global buyers an alternative to supplies exposed to geopolitical disruption. Sales strategy. Oilfield and midstream service companies should prioritize Kinder Morgan's Texas, Haynesville and Gulf Coast projects. Target project engineering, construction, operations, pipeline integrity, compression, storage and procurement teams with location-specific capabilities tied to 2026 construction activity and the Trident startup in 2027. Kinder Morgan is advancing a $10.1 billion project backlog to expand U.S. natural gas transportation, processing and storage capacity. Major opportunities are emerging across Texas, the Haynesville and the Gulf Coast as LNG, power generation and data centers drive higher gas demand.

Yahoo Finance
Sep 9th, 2026
Trump's oil and gas holdings gained up to $4.4M during Iran war

President Donald Trump's nine largest oil and gas holdings gained between $1.5 million and $4.4 million in the first six months of the Iran war, according to a CNBC analysis of his financial disclosure and market data. The holdings include Chevron, ExxonMobil, and seven other energy companies. CNBC calculated gains using share-price movements from 27 February, the day before hostilities began, through 31 August. Trump's accounts showed at least 23 sell transactions across the nine stocks through 29 June. A White House spokesman said Trump plays no role in trading decisions, with all investments managed independently. Ethics watchdogs disputed this, noting Trump still knows his heavy energy investment positions. The nine firms posted combined second-quarter profits of $47.6 billion, triple the prior year's figure. US crude prices rose roughly 36% since the war started.