P

Pronoia

Develops physics-based battery for energy storage

Laboratory Manager

Facilities OperationsConfirmed live in the last 24 hours
Full-timeTorrance, CA, USA

About the Job

Requirements

  • Experience running a hazardous-materials or energetic-materials laboratory.
  • Strong safety and compliance instincts, procurement skills, and logistics skills.
  • A calm, organized, service-oriented approach toward the scientists supported.
  • Comfort with ambiguity and rapid iteration in a startup setting.
  • Communication and coordination across technical teams.

Responsibilities

  • Own laboratory operations, including equipment, instruments, inventory, scheduling, and records.
  • Lead safety and compliance for a laboratory and its reactive materials.
  • Procure and maintain equipment, and keep shared instruments calibrated and available.
  • Remove operational friction so scientists and technicians can work quickly and safely.
  • Develop and enforce protocols that treat safety as enabling speed rather than opposing it.

Desired Qualifications

  • A background in a battery, chemical, aerospace, or pharmaceutical laboratory.
  • Hazmat-handling and laboratory-safety certifications.
  • Experience standing up a new laboratory or scaling an existing one.
  • Prior work in deep-tech research and development alongside interdisciplinary teams.

About the Company

Pronoia

Develops physics-based battery for energy storage

Pronoia develops energy storage solutions using a physics-based rechargeable battery that operates without an electrolyte or separator, targeting large-scale storage for grids, transportation, and devices. It relies on physics-based principles rather than chemical reactions, is rechargeable, and aims to minimize performance loss per cycle to raise energy density; the approach is protected by granted patents. The key differentiator is an electrolyte-free, non-electrochemical design that avoids common battery degradation and is supported by venture funding. The goal is to accelerate the shift to renewable energy by providing scalable, high-capacity storage for the electricity grid, electric vehicles, and consumer electronics.

Company size
11-50
Company stage
Not listed
Total funding
Not listed
Headquarters
Torrance, CA
Founded
2017

Recently Posted Jobs

Explore more opportunities at Pronoia

See more jobs